Stockle - the stock oracle

Karoon Energy Ltd

ASX:KAR
A$1.53Close 7 Oct 2026 · delayed

Past year: ▼ 4%(1.46 – 2.19 AUD)

Market cap
A$850m
Shares on issue
554m
In-ground value
A$6.29bn
Risked multiple
3.24×
Story beats
234 since 2006
Last event
12 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

16 Oct 2015admin correction● Neutral

ASIC Form 484 records cancellation of 343,152 shares bought back for about A$574k, taking issued shares to 246,290,463. This is a routine filing reflecting the ongoing on-market buyback.

Discuss in chat

15 Oct 2015annual report● Neutral

2015 Corporate Governance Statement, current as at 8 September 2015, checking the company's practices against the ASX governance recommendations. Compliance checklist and administrative disclosure with no new business or resource information.

Discuss in chat

24 Sept 2015investor presentation● Neutral

September 2015 corporate and operations review restating the resource summary: Kangaroo net 13/35/65 mmbbl, Echidna net 16/49/99 mmbbl, and Peru and Brazil prospective resources. No new results or announcements in the readable text.

Discuss in chat

17 Sept 2015resource reserve update● NeutralMajor

Echidna gets a first 2C contingent resource of 75 mmbbl (49 net). Kangaroo's 2C is revised to 54 mmbbl (35 net), well below the earlier net 88 mmbbl. Combined 129 mmbbl gross, 84 net, with a much tighter 1C-3C range. These are internal management estimates not agreed by partner Pacific Exploration and Production.

Value this in the calculator →Discuss in chat

17 Sept 2015investor presentation● Neutral

Presentation repeating the new 129 mmbbl gross (84 net) combined 2C figure. It outlines a staged appraisal plan with a decision on an early production system after 2016 drilling, and first oil expected in 2019. Market cap A$460m, cash A$553m, no debt. No new figures.

Discuss in chat

9 Sept 2015admin correction● Neutral

Appendix 4G corporate governance checklist lodged with the annual report, dated 8 September 2015. Administrative filing with no business substance.

Discuss in chat

8 Sept 2015annual report● Neutral

2015 annual report: year closed with A$553m cash after A$659m net proceeds from the Browse permit sale. It recaps the Echidna discovery and test results suggesting horizontal wells could exceed 10,000 bopd. Plans are for 2016 appraisal work. No new figures beyond known results.

Discuss in chat

8 Sept 2015regulatory community update▲ GoodMajor

Brazil's regulator approved the revised appraisal plan for the Santos Basin blocks (Karoon 65%). Firm commitments run to 31 December 2018, and Echidna appraisal drilling is expected to start in 2016. An early production system is contemplated if appraisal succeeds. This clears the way for the next phase after the 2015 discoveries.

Discuss in chat

11 Aug 2015drilling result▼ BadMajor

Levitt-1 reached 4,929 mRT with no hydrocarbon shows; the Legendre and North Rankin reservoirs were water-bearing. It is a dry hole in WA-482-P (Karoon 50%, carried for 90% of cost, net cost within US$5m). It resolves the 110 mmbbl net exploration test; management still sees potential elsewhere in the permit.

Value this in the calculator →Discuss in chat

31 July 2015quarterly activities report● Neutral

June quarter report: Levitt-1 was at 4,425 mRT with total depth expected in August. Echidna-1 and Kangaroo-2 tests suggest horizontal wells could exceed 10,000 bopd. Interpretation of Elvie data in WA-314-P now suggests an oil-prone kitchen, where previous expectations were wet gas only. Farm-out talks continue.

Discuss in chat

20 July 2015drilling progress report● Neutral

Levitt-1 was drilling ahead at 2,918 mRT after setting 13-5/8" casing at 2,094 mRT. Total depth is still expected in early August; net best estimate is 110 mmbbl. No result yet.

Value this in the calculator →Discuss in chat

14 July 2015investor presentation● Neutral

Conference presentation restating known facts: about A$550m cash at 30 June 2015, no debt, A$540m market cap. Updated Echidna and Kangaroo resource ranges and pre-FEED plans are expected in the fourth quarter of 2015. No new results.

Discuss in chat

6 July 2015drilling spud● NeutralMajor

Levitt-1 spudded on 4 July 2015 in WA-482-P, now operated by Quadrant Energy (ex-Apache). Karoon holds 50% and is carried for 90% of cost. Total depth is expected in early August; net best estimate is 110 mmbbl. This resolves the long-awaited spud.

Value this in the calculator →Discuss in chat

1 July 2015joint venture update● Neutral

Apache's Australian arm, including its 50% of WA-482-P, was sold to Macquarie and Brookfield for US$2.1bn. Karoon waived its pre-emptive rights over that interest, which Apache valued at US$241m. Levitt-1 is expected to spud in the first week of July.

Discuss in chat

7 May 2015well test result▲ GoodMajor

Echidna-1 Paleocene test flowed 4,650 bopd, limited by test facilities, with 38.6 degree API oil. Karoon says reservoir quality is the best in its Brazilian acreage. The joint venture will not take the second option well; appraisal drilling is planned near term.

Discuss in chat

30 Apr 2015quarterly activities report● Neutral

March quarter report recaps Kangaroo-2 testing, the Kangaroo West-1 dry hole and Echidna-1 discovery (213 m gross, 104 m net oil). Levitt-1 timing is now given as June 2015. WA-314-P farm-out remains ongoing. No new results.

Discuss in chat

20 Apr 2015drilling result▲ GoodMajor

Echidna-1 is confirmed as an oil discovery, with a 213 m gross oil column across Paleocene and Maastrichtian reservoirs and 39.5 degree API oil. It adds to the Kangaroo field, near Karoon's Santos Basin production-hub plans. Testing begins; second option well decision due in weeks.

Value this in the calculator →Discuss in chat

13 Apr 2015drilling result▲ Good

Echidna-1 reached 2,379 mRT and mudlogs show oil in Paleocene sands, with further shows in the Maastrichtian. Wireline logging must still confirm the oil column and its size. An early positive sign after the Kangaroo West dry hole.

Value this in the calculator →Discuss in chat

8 Apr 2015investor presentation● Neutral

April 2015 corporate review restating known assets, resource tables and the Kangaroo and Echidna positions. No new result or figures are evident in the readable text.

Discuss in chat

1 Apr 2015drilling spud● Neutral

Echidna-1, the third well of the Santos Basin campaign, spudded on 31 March 2015 in block S-M-1102 (Karoon 65%). Reservoir is expected within about 3 weeks, total depth 2,400 mRT in April. Net best estimate is 95 mmbbl, with a 43% chance of success.

Value this in the calculator →Discuss in chat

24 Mar 2015contract award▲ Good

Apache has contracted the Ocean America rig to drill Levitt-1 in WA-482-P (Karoon 50%), now expected to spud in May 2015. Karoon is carried for 90% of cost; its net dry-hole cost is about US$5m. Net best estimate is 110 mmbbl.

Discuss in chat

20 Mar 2015drilling result▼ BadMajor

Kangaroo West-1 reached 3,170 mRT and found no hydrocarbons, blamed on lack of oil charge, the known main risk. Net cost is about US$34m. The joint venture will drill Echidna-1 (65%, best 95 mmbbl net unrisked, 43% chance) as its first option well.

Value this in the calculator →Discuss in chat

16 Mar 2015drilling progress report● Neutral

Kangaroo West-1 is drilling ahead at 1,759 mRT in the 12-1/4" hole after running 20" casing. No new result. A decision on the first option well is still expected in coming weeks.

Value this in the calculator →Discuss in chat

16 Mar 2015half year report▲ Good

Half-year to 31 December 2014 shows a profit of A$209m, including a A$276m gain on the Origin sale and A$83m of foreign exchange gains on US dollar cash. A A$32.5m impairment on Brazilian block S-M-1352 partly offset this. The buyback was suspended when drilling began.

Discuss in chat

2 Mar 2015drilling spud● NeutralMajor

Kangaroo West-1, the second firm well of the Santos Basin campaign, spudded on 26 February 2015 in block S-M-1165 (Karoon 65%). The reservoir is expected in about 3 weeks and total depth in early April. A decision on the first option well is expected in coming weeks.

Value this in the calculator →Discuss in chat

25 Feb 2015other● Neutral

ASIC filing records 13,593 new shares issued on 10 February 2015 at no payment, taking shares to 246,633,615. Administrative, with no explanation given in the filing.

Discuss in chat

11 Feb 2015drilling result● NeutralMajor

The Kangaroo-2 up-dip sidetrack found 37 m gross of Paleocene oil with 39 degree API oil, but the Maastrichtian was water-bearing. It is in a separate pressure compartment, so the field is several accumulations. No gas cap was found. Resource size and recovery remain to be assessed; Kangaroo West-1 is next.

Value this in the calculator →Discuss in chat

30 Jan 2015quarterly activities report● Neutral

December quarter report restates the Kangaroo-2 250 m gross (135 m net) oil column, successful flow tests and the down-dip sidetrack. Klingner became Chairman and 7.5m shares were bought back in the quarter (9.4m in total). Levitt-1 is expected in the June 2015 quarter, and a WA-314-P farm-out process has started.

Discuss in chat

28 Jan 2015drilling result● Neutral

The Kangaroo-2 down-dip sidetrack reached 2,745 mRT. It found a 50 m gross Maastrichtian oil column with 38 degree API oil, water-wet Paleocene sands, and no oil in the deeper Campanian. An up-dip sidetrack is being prepared.

Value this in the calculator →Discuss in chat

6 Jan 2015well test result▲ GoodMajor

Paleocene testing of Kangaroo-2 reached a maximum 3,700 stb/d (stabilised 3,450 stb/d), adding to the Maastrichtian result. Karoon repeats a vertical well could make 6,000-8,000 stb/d. Two sidetracks, down-dip and up-dip, will now be drilled to refine resource size.

Discuss in chat