Each one in plain English, with the numbers worked through for a shareholder.
16 June 2014director officer appointment● Neutral
Peter Turnbull, a governance specialist and former Governance Institute of Australia president, was appointed independent non-executive director, replacing Stephen Power. The announcement says this provides an independent majority on the board.
Non-executive director Stephen Power resigned from the board with immediate effect after nine years, staying as adviser and consulting lawyer on farm-out talks. Delivers the retirement flagged earlier in the board restructure.
Karoon agreed key terms for a US$100m bridge facility with NAB to fund operating cash needs until the US$600m Origin proceeds arrive. Karoon had previously had no debt.
Third-party release from Origin on the same Browse deal: US$600m cash plus deferred payments, with Origin to fund it initially from debt and refinance via an equity raise of around $1bn. Adds Origin's side; no new Karoon terms.
June 2014 corporate review summarises net resources and the Origin deal terms, including Origin reimbursing Pharos-1 costs paid before completion. Net Kangaroo contingent resource is 7/88/317 mmbbl (1C/2C/3C). Largely repeats known facts.
2 June 2014asset acquisition disposition▲ GoodMajor
Karoon agreed to sell its 40% of Browse permits WA-315-P and WA-398-P to Origin for up to US$800m: US$600m cash at completion, US$75m at FID, US$75m and up to US$50m at first production. Origin also covers Pharos-1 costs. Completion expected Q3 2014; resolves the funding suspension.
Karoon set out its board restructure: Stephen Power retires once an independent replacement is appointed, then a second independent director joins to give an independent majority, targeted before the 2014 AGM. Candidates are in discussion. Continues the April board announcement.
Chairman's letter says the Origin sale and Apache farm-out represent up to A$1bn of value. It plans a five-well program (Kangaroo-2 plus four exploration wells), interim financing, and a capital management review in 2H 2014 after completion. Mostly restates known items.
Origin's investor presentation on its Browse Basin acquisition, from the buyer's side. The text shown is mostly general company and LNG market background; no new Karoon terms visible in the readable portion.
Karoon requested the voluntary suspension continue pending an announcement on commercial discussions and funding. Talks with stakeholders and potential new investors continue, with an update due by 2 June. No new terms.
Pharos-1, the sixth and last well of the Browse campaign, spudded on 20 May 2014 in WA-398-P, about 9 km north-east of the Proteus-1 discovery. It is at 716 mRT. Shares remain suspended.
Karoon requested continued voluntary suspension pending an announcement on commercial discussions and its funding position. Talks with stakeholders and potential new investors continue, with an update promised by 26 May. No new information.
Third-party notice from royalty holder High Peak Royalties, which has a 0.2% royalty on WA-482-P and 0.103125% on WA-315-P. It restates Karoon's Apache farm-out and Poseidon North-1 announcements and carries no new information about Karoon.
Poseidon North-1 reached 5,288 mRT and interpreted a 12 m net Jurassic gas sand, but pressure data is inconclusive and mobile gas is unconfirmed. The well is being plugged and abandoned. The sixth well, Pharos-1 in WA-398-P, is approved.
Karoon farmed out 50% of WA-482-P to Apache, which will pay US$9.04m for seismic costs, fund 90% of one well capped at US$63m, take over as operator and drill in the first half of 2015. This is the first completed farm-out in the process under way since late 2013.
Karoon asked for the voluntary suspension to continue while funding and commercial discussions with stakeholders and potential new investors go on. A status update is promised by 19 May. No terms disclosed.
Karoon's shares were suspended at its own request on 5 May 2014, pending an announcement about its funding position. The company says it is in talks with stakeholders and potential new investors, and expects to update by 12 May.
Independent certification by DeGolyer and MacNaughton gives Karoon net unrisked prospective resource, best case, of 4.5 Tcf wet gas (Browse) and 4.2 bn bbl oil (WA-482-P, Peru Z-38 and Block 144). WA-482-P drilling is planned for 2015 and Peru Z-38 drilling to start in 2015.
Poseidon North-1 has drilled the 17-1/2 inch section to 2,459 m and cemented 13-3/8 inch casing. The rig is installing the blowout preventer before drilling on. No result yet.
Poseidon North-1, the fifth Browse Phase 2 well, spudded on 19 March 2014, 6.5 km north-east of Poseidon-1 in WA-315-P (Karoon 40%). It follows the Grace-1 dry hole and targets the Plover and Montara formations.
Half-year to 31 December 2013: loss of A$8.1m (prior year A$8.7m), with A$4.2m interest income and A$2.1m foreign exchange gains. Restates known events: Grace-1 dry, A$175.5m raised, Pacific Rubiales transfer complete. Text truncated.
Brazil's regulator approved the transfer of a 35% interest in block S-M-1166 to Pacific Rubiales, completing the 2012 farm-out across all five Santos blocks. Pacific Rubiales now holds 35% of the Kangaroo and Bilby discoveries and must fund its share of future work.
Grace-1 found no significant hydrocarbons. The volcanic zone of interest was water bearing and the well will be plugged and abandoned. It ends the Browse run of gas discoveries: Karoon holds 90% of WA-314-P. Poseidon North-1 is next.
Grace-1 reached total depth of 5,069 m without intersecting Plover or Montara sands. Logging is under way on a gas-show zone in Jurassic volcanics at about 4,000 m. Results are due in days.
The Grace-1 rig was evacuated for tropical cyclone Christine, with no damage apparent. The well remains at 4,767 m, with drilling to resume as soon as practicable.