Story beats
204 since 2006
Last event
2 July 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

12 Nov 2012drilling progress report● Neutral

Golden Gate repeats the Hensarling #1 update: drilling at 9,987 ft, about four days ahead of schedule, Cris R II due within two weeks. Nothing new for GGE.

Value this in the calculator →Discuss in chat

5 Nov 2012drilling progress report● Neutral

Partner Golden Gate (3.99% WI) repeats the Hensarling #1 update: casing set at 3,000 ft, drilling at 3,850 ft, 38 days to total depth. Adds nothing new for GGE.

Value this in the calculator →Discuss in chat

5 Nov 2012drilling progress report● Neutral

Desiree's Hensarling #1 (GGE 35.6%) has set casing at 3,000 ft and is drilling at 3,865 ft, on budget and on target to reach total depth in 38 days. The first main target, Cris R II, is expected around month-end. No result yet.

Value this in the calculator →Discuss in chat

1 Nov 2012annual report● Neutral

Full FY2012 annual report, following the 28 Sep summary. Chairman's letter repeats production of 29,635 bbl oil and 191,609 mcf gas, revenue over A$11m including La Posada's US$7.5m, and Abita still awaiting hurricane repairs. D&L #3 is now cited at about 290 bopd. Text is truncated.

Discuss in chat

31 Oct 2012agm notice● Neutral

Notice of the annual general meeting on 30 November 2012 in Perth, covering the annual accounts and an advisory remuneration report vote. The text provided is cut off, so the remaining resolutions are not visible.

Discuss in chat

30 Oct 2012drilling spud● NeutralMajor

The Desiree well, Hensarling #1, spud and was drilling ahead at 850 ft toward 12,550 ft. GGE held 35.6% with a dry-hole share of about US$1.1m, targeting up to 1 million bbl of oil and 30 BCF of gas updip of a field producer that yielded 2.3 MMBO.

Value this in the calculator →Discuss in chat

30 Oct 2012drilling spud● Neutral

Partner Golden Gate Petroleum (3.99% WI) announces the Hensarling #1 well at Desiree has spud and is at 850 ft. It repeats GGE's prospect data and adds nothing new for GGE.

Value this in the calculator →Discuss in chat

25 Oct 2012quarterly activities report● Neutral

September quarter net production was 11,696 boe, down from 14,038 in June. Leduc and Austin Bayou were both dry. D&L #3 is making 250 bopd and about US$230,000 monthly net, with reserves trimmed to 325,000 bbl on water ingress. Desiree rig is on site; Abita retest is due within 14 days.

Discuss in chat

28 Sept 2012annual report● Neutral

FY2012 annual report: production of 29,635 bbl oil and 191,609 mcf gas, and revenue over A$11m including the US$7.5m La Posada sale. Lyons Point, Grizzly and Vermilion were dry. Abita is awaiting repair of hurricane damage. Over 900,000 bbl net potential is planned for the December quarter.

Discuss in chat

21 Sept 2012drilling result▼ BadMajor

Dickens #1 at Leduc Reef reached 8,500 ft on 20 September; logs showed commercial recovery unlikely and the operator proposes plugging and abandoning. A dry hole, GGE's third in 2012 after Vermilion and Austin Bayou. Management says Desiree and West Klondike cash calls are received.

Value this in the calculator →Discuss in chat

18 Sept 2012drilling progress report● Neutral

Leduc's Dickens #1 is drilling at 8,091 ft toward a planned total depth of 8,500 ft, said to be on time and on budget. The main target is expected shortly. No result yet.

Value this in the calculator →Discuss in chat

17 Sept 2012farm in farm out agreement▲ GoodMajor

GGE restructured its Napoleonville terms: interest in future wells rises from 17.5% to 21.9%, while Desiree is cut by 5.25% to 35.6%, lowering GGE's well cost to about US$1.1m from US$1.4m. Desiree spud now early October; first new prospect Louise targets 600,000 bbl.

Value this in the calculator →Discuss in chat

7 Sept 2012production update▼ Bad

Operator confirms Hurricane Isaac damaged Abita's platform facilities. No timing for resuming production is given, and the operator is assessing insurance cover. This follows the seal repair, so the well stays offline longer.

Discuss in chat

31 Aug 2012quarterly activities report● Neutral

Operations update: Leduc's Dickens #1 is drilling at 3,529 ft. West Klondike has approval to build its location, with spud expected October. Abita seal repair is complete, but facilities are shut for Hurricane Isaac. No new results.

Discuss in chat

27 Aug 2012drilling spud● NeutralMajor

Dickens #1 at Leduc Reef, Arkansas, spud 26 August 2012, expected to take 21 days to reach 8,600 ft. GGE holds 22% (paying 26.66%); its share of well cost is about US$335,000, up from the earlier US$280,000 estimate. Most likely 1.2 MMBO, upside 12 MMBO.

Value this in the calculator →Discuss in chat

13 Aug 2012drilling result▼ BadMajor

Austin Bayou HRI #1 reached 11,330 ft and is to be plugged and abandoned as logs showed commercial recovery unlikely; the fault was steeper than mapped. Another dry hole, though management says the program is fully funded.

Value this in the calculator →Discuss in chat

9 Aug 2012drilling progress report● Neutral

Austin Bayou HRI #1 had a first oil show at 10,527-10,561 ft, apparently in the Tex Miss 1 sand above the Andrau target. Logs after reaching total depth will show whether it is commercial.

Value this in the calculator →Discuss in chat

6 Aug 2012drilling progress report▼ Bad

Austin Bayou HRI #1 is at 10,234 ft after a milling delay, with the first target expected in 350-400 ft. GGE's stated well cost has risen to US$600,000 from US$385,000, which was previously said to be prepaid.

Value this in the calculator →Discuss in chat

1 Aug 2012quarterly activities report● Neutral

June quarter net production rose to 14,038 boe from 10,965. Vermilion River was non-commercial, GGE withdrew from Pintail, and Abita is being worked over to fix a leaking seal. Austin Bayou is at 9,648 ft. Share price is 0.3c, market cap A$11.4m.

Discuss in chat

31 July 2012asset acquisition disposition▲ GoodMajor

GGE acquires 15% of the Port Hudson project in Louisiana, targeting up to 500,000 bbl of oil. GGE's dry-hole share is about US$160,000, with spud expected early November 2012. Another small, low-cost addition to the program.

Discuss in chat

31 July 2012asset acquisition disposition▲ GoodMajor

GGE acquires 10.5% of the S Welsh project in Louisiana, a development well targeting up to 450,000 bbl of oil. GGE's dry-hole cost is about US$145,000, with spud expected October 2012. A new small, low-cost prospect.

Discuss in chat

30 July 2012drilling progress report● Neutral

Austin Bayou HRI #1 is at 9,309 ft, drilling at about 20 ft per hour, with the first target still expected near 10,500 ft. The program table now shows Desiree and Leduc slipping to September.

Value this in the calculator →Discuss in chat

3 July 2012drilling spud● Neutral

Austin Bayou HRI #1 spud on 2 July 2012, to drill to 11,400 ft in about three weeks. GGE holds 23.25% and targets net 2.7-4 BCF gas and 40-60k bbl condensate. A modest low-cost well.

Value this in the calculator →Discuss in chat

27 June 2012drilling scheduled● Neutral

Rig for Austin Bayou HRI #1 is being moved to site, with spud expected within seven days, after earlier delays. GGE's 23.25% share of well cost is US$385,000, already prepaid. No new result.

Value this in the calculator →Discuss in chat

18 June 2012farm in farm out agreement▲ GoodMajor

GGE buys a further 8% of the Leduc Reef prospect in Arkansas, lifting its interest from 14% to 22% (inference: prior 14% from earlier 10.5% LOI is not stated). Spud now late July/early August; GGE's share of initial well cost is about US$280,000.

Value this in the calculator →Discuss in chat

12 June 2012drilling result▼ BadMajor

Vermilion River drilled a further 300 ft to a TD of 17,320 ft without finding more sands of interest. Logs showed no commercially interesting pay, and the operator was preparing to plug and abandon the well; Austin Bayou was next.

Value this in the calculator →Discuss in chat

4 June 2012drilling progress report▼ Bad

Preliminary logs from 12,779-16,975 ft suggest the pay found so far may not be commercially significant. The operator will drill about 300 ft more to planned TD before a full evaluation. This tempers the earlier gas shows.

Value this in the calculator →Discuss in chat

30 May 2012drilling progress report▲ Good

A second gas show of about 60 ft was recorded at 16,660-16,720 ft in the lower primary Het sands, with the well at 16,734 ft. Pay is not confirmed until logs are run. About 770 ft of target sands remain.

Value this in the calculator →Discuss in chat