5 July 2007drilling progress report● Neutral

This is Sun Resources' announcement, not FAR's. Lake Long #9 drilled through the Lower Hollywood with gas shows to a revised total depth of 13,284 ft; electric logs are next. Upper and Middle pay (13 ft, 29 ft) is confirmed behind casing.

Value this in the calculator →Discuss in chat

28 June 2007drilling result▲ GoodMajor

Electric logs at Lake Long #9 (FAR 10.1875%) confirm gas pay: 13 ft net in the Upper and 29 ft net in the Middle Hollywood, now behind casing for later production. Drilling continues to the Lower Hollywood. Canning Basin Stokes Bay and Valentine wells are due about late July.

Value this in the calculator →Discuss in chat

21 June 2007capital raising announcement▲ GoodMajor

FAR confirmed it allotted 62 million shares, raising A$8.68m before costs, completing the placement announced 7 June (at 14c per that announcement). Shares on issue rise to 483,553,344. Funds go to Senegal 3D interpretation, China, Canning Basin, Gulf Coast and NE Waller.

What it means for a shareholder

62.0m new shares at about A$0.140 to raise about A$8.7m. That's 89% dilution: every existing holder's slice gets 89% smaller. If you held A$1,000 of shares (7,143 at the issue price), your slice goes from 0.0952% to 0.0103% of the company. To keep it you'd need 59,048 more shares - about A$8,267 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

19 June 2007drilling progress report● Neutral

This is Sun Resources' announcement, not FAR's. It reports gas shows in Upper and Middle Hollywood sands at Lake Long #9 (drilling at 12,308 ft), with 26 ft apparent net pay in the Middle. Significance unknown until electric logs. Also covers Sun's Texas wells, not FAR's.

Value this in the calculator →Discuss in chat

19 June 2007drilling progress report▲ Good

Lake Long #9 (FAR 10.1875%) hit gas shows in the Upper and Middle Hollywood targets, with about 26 ft apparent net pay in the Middle, and is drilling toward the Lower Hollywood. Chairman is optimistic, but significance awaits electric logs.

Value this in the calculator →Discuss in chat

13 June 2007drilling progress report● Neutral

Lake Long SL 328 #9 (FAR 10.1875%) is at 11,567 ft; shallower shows are likely depleted, with main Hollywood targets below 11,800 ft. New Lindsey 109A #1R re-drill (FAR 4.64%, US$1.5m) planned July; NE Waller 3D (FAR 34%) surveying begins, 16,856 acres leased. Kicker awaits operator advice.

Value this in the calculator →Discuss in chat

7 June 2007capital raising announcement▲ GoodMajor

FAR will raise A$8.68m by placing 62 million shares at 14 cents, mainly to institutions and Hartleys clients, with allotment about 20 June. Funds back Senegal 3D interpretation, a 4-6 well China program from November, two Canning Basin wells from late July, Gulf Coast drilling and the NE Waller 3D.

What it means for a shareholder

62.0m new shares at A$0.140 to raise about A$8.7m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

5 June 2007flow test result▲ GoodMajor

Kicker's Marceaux #1 (FAR 5%, 3.75% after payout) tested up to 1,056 barrels of oil a day, confirming an oil discovery; fracture stimulation planned 11 June. Chairman urges caution until sustained production. Lake Long #9 is at 10,926 ft with residual shows; main targets are below 11,800 ft.

Discuss in chat

29 May 2007well test result▲ GoodMajor

Bujnoch-Bender #1 (FAR 20%) tested 170 barrels of oil and 388 mcf gas a day from the Middle Wilcox at 7,834 ft and goes to sales. Kicker's Marceaux #1 (FAR 5%) testing begins this week. Lake Long #9 is drilling at 9,020 ft.

Discuss in chat

28 May 2007investor presentation● Neutral

AGM presentation largely repeats the earlier investor deck. It lists a 15-well 2007 program (Australia 3, North America 10, China 4) and Canning Basin spuds of Stokes Bay and Valentine in July 2007. Text truncated; no new results.

Discuss in chat

23 May 2007investor presentation● Neutral

Upstream Energy 2007 presentation repeats known projects and calls Senegal the best prospect, with more than one billion barrels of potential. It cites cash of A$12.4m at 31 March and 413.8m shares. The text is truncated.

Discuss in chat

16 May 2007drilling progress report● Neutral

This is Sun Resources' announcement, not FAR's. The Lake Long SL 328 #9 well is drilling at 3,224 ft toward a first casing point at 3,500 ft. No new results; weekly updates continue until target zones are reached.

Value this in the calculator →Discuss in chat

15 May 2007drilling spud▲ GoodMajor

Lake Long SL 328 #9 (FAR 10.1875%) spudded 12 May and is drilling at 2,100 ft, with about 48 days planned to 13,555 ft. Senegal 3D acquisition ended 28 March (2,089 km2, about US$12.1m); data quality is excellent, with interpretation due to start in Q4 2007.

Value this in the calculator →Discuss in chat

9 May 2007asset acquisition disposition▲ GoodMajor

A rig is being mobilised for the Lake Long SL 328 #9 deep well (FAR 10.1875%), a 13,555 ft test targeting 21.7 BCF plus 760,000 barrels, costing about US$10m if completed. FAR also farmed out the Thunder River Prospect to Mustang for a 3% override convertible to 25% working interest after payout; Mustang must drill by 1 October 2007.

Discuss in chat

9 May 2007drilling scheduled● Neutral

This is Sun Resources' announcement, not FAR's. It says the barge rig moves onto the SL 328 #9 Hollywood well this week, with spud expected Friday. It repeats the 21.7 BCF and 760,000 barrel target and FAR's 10.1875% interest.

Value this in the calculator →Discuss in chat

26 Apr 2007other● Neutral

This is Amadeus Energy's announcement of its 21.90625% in the Lake Long #9 Hollywood Prospect. It repeats the earlier Sun release, again listing FAR at 10.1875% (it calls the company 'First Australian Resources NL'). Drilling is slated for mid May 2007.

Discuss in chat

26 Apr 2007other● Neutral

This is Sun Resources' announcement, not FAR's. It confirms FAR's 10.1875% in the Lake Long #9 Hollywood Prospect test (Kriti operator), targeting 21 BCF and 760,000 barrels of condensate, drilling mid May 2007. FAR's own cost share is not stated.

Discuss in chat

17 Apr 2007drilling result▲ GoodMajor

Kicker's Marceaux #1 reached 13,264 ft and found 33 ft of net pay in the Alliance 2 and 3 Sands, so production casing is being run (FAR 5%, 3.75% after payout). Bujnoch-Bender #1 is also cased for production, with Rainosek 3 at 50 barrels a day.

Value this in the calculator →Discuss in chat

11 Apr 2007drilling result▲ GoodMajor

Bujnoch-Bender #1 (FAR 20%) reached 9,000 ft with about 60 ft of net pay, mostly gas, in thin Upper and Middle Wilcox zones; the Lower Wilcox is wet. Kicker's Marceaux #1 recorded gas shows in a primary objective, to be logged at total depth.

Value this in the calculator →Discuss in chat

4 Apr 2007drilling progress report● Neutral

Bujnoch-Bender #1 (FAR 20%) is drilling at 4,448 ft after spudding 31 March. Kicker's Marceaux #1 has run intermediate casing at 12,024 ft before drilling to the target sands. No new results.

Value this in the calculator →Discuss in chat

28 Mar 2007annual report● Neutral

The 2006 annual report restates known items: Wei 6-12 at 19 MMBO most likely (27 upside), Senegal 3D under way, and about $12m raised from institutions. Oil and gas sales were $2,999,975, down from $3,518,683 in 2005 on lower production and gas prices. The text is truncated.

Discuss in chat

27 Mar 2007drilling scheduled● Neutral

A rig is secured for the Bujnoch-Bender #1 development well at Rainosek, Texas (FAR 20%), to spud about 31 March to 9,100 ft over 16 days. Kicker's Marceaux #1 is at 11,525 ft nearing intermediate casing.

Value this in the calculator →Discuss in chat

22 Mar 2007drilling progress report● Neutral

Kicker's Marceaux #1 is at 10,820 ft. In Alberta, shot hole drilling is done for the Wild River 3D survey (FAR about 36%), with processed data now expected by mid April rather than end of Q2.

Value this in the calculator →Discuss in chat

20 Mar 2007drilling progress report▲ Good

The Senegal 3D survey (2,050 km2, FAR 30%) should finish ahead of schedule on 25 March, with data quality described as good to excellent. Petrobras has bought 40% of the adjacent Rufisque Profond block from Edison, which FAR cites as a gauge of regional interest.

Value this in the calculator →Discuss in chat

8 Mar 2007material agreement▲ GoodMajor

FAR and a Canadian partner will shoot a 3D seismic survey in the Alberta Deep Basin from about 15 March, with FAR expected to hold around 36%. FAR also took an option for 15% of a 4,000 m Wabamun test (50 BCF plus) at Karr, exercisable once an operator is appointed.

Discuss in chat

1 Mar 2007drilling progress report▲ Good

Kicker's Marceaux #1 spudded 28 Feb and is at 395 ft. Clear Prairie 3-8-90-12 (FAR 15%) was drilled to 1,245 m; logs confirm hydrocarbon pay and production casing is run, an early positive for the Canadian program.

Value this in the calculator →Discuss in chat

21 Feb 2007drilling progress report● Neutral

Rig 172 is on location to spud the Kicker well (FAR 5%) within days, and the Clear Prairie 3-8-90-12 well (FAR 15%) began drilling 19 Feb and is at surface casing. Both continue previously announced plans; no results yet.

Value this in the calculator →Discuss in chat

15 Feb 2007drilling progress report▲ Good

The MV Symphony has started the Senegal 3D survey, now 2,050 km2 after sharing costs with Edison added 50 km2 to include prospect C1. FAR (30%, Hunt operator) says it plans to keep its equity despite industry interest.