Stockle - the stock oracle

CUE Energy Resources Ltd

ASX:CUE
A$0.105Close 7 Oct 2026 · delayed

Past year: ▼ 5%(9.90c – 14.5c AUD)

Market cap
A$73.8m
Shares on issue
703m
In-ground value
—
Risked multiple
under review
Story beats
249 since 2006
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

22 Sept 2008farm in farm out completion● NeutralMajor

Cue and Gascorp each declined to fund 5% of Zeus-1, so their combined 10% reverts to operator MEO, lifting MEO to 35%. This resolves the 10 September option: Cue's WA-361-P interest falls from 20% to 15%, still carried free.

Value this in the calculator →Discuss in chat

22 Sept 2008drilling spud● NeutralMajor

Stuart Petroleum spudded Bazzard-1 in Vic P53 (Gippsland Basin) on 20 September; it is at 154m, targeting 3,500m. Mean potential is 100 million barrels. Cue Petroleum holds 25%. This is the well flagged for September.

Value this in the calculator →Discuss in chat

12 Sept 2008drilling result▲ Good

Cue repeats Oil Search's 11 September result: Cobra-1A ST3 is being suspended as a gas condensate discovery with a 34m hydrocarbon zone. This is Cue's final drilling report. Further evaluation will decide the next steps.

Value this in the calculator →Discuss in chat

11 Sept 2008drilling result▲ GoodMajor

Cobra 1A ST3 is being suspended as a gas condensate discovery after a drill stem test recovered gas with condensate. A 34m hydrocarbon zone was found in the upper Hedinia, the first success for the sub-thrust play in PNG. Cue holds 10.947%.

Value this in the calculator →Discuss in chat

5 Sept 2008drilling progress report● Neutral

Cue repeats Oil Search's 4 September report: the first Cobra-1A ST3 drill stem test failed mechanically and a second test is being prepared. No new information.

Value this in the calculator →Discuss in chat

4 Sept 2008drilling progress report● Neutral

A first drill stem test of the upper Hedinia in Cobra 1A ST3 failed for mechanical reasons. Tools were serviced and re-run for a second test to confirm fluid type and reservoir quality.

Value this in the calculator →Discuss in chat

2 Sept 2008investor presentation● Neutral

Good Oil Conference presentation restating Cue's portfolio, reserves and production forecasts. It states a corporate plan to exceed A$500m market capitalisation and reports cash of A$15m and a US$20m project loan facility. Largely repeats known facts.

Discuss in chat

1 Sept 2008annual report▲ Good

Preliminary results for the year to 30 June 2008: net profit A$11.7m versus a A$27.6m loss in 2007 (which included a A$29.1m write-off, mainly Jeruk). Revenue was A$38.8m, driven by Oyong oil production. No dividend.

Discuss in chat

29 Aug 2008farm in farm out agreement▲ GoodMajor

Cue acquired a 20% interest in New Zealand permit PEP 38494 by farming in with operator Todd Exploration, funding 30% of the Matariki-1 well. Matariki could hold about 100 MMstb recoverable oil, with drilling planned in the second half of 2009.

Value this in the calculator →Discuss in chat

26 Aug 2008drilling progress report▲ Good

A formation fluid sample from the top of the Hedinia in Cobra 1A ST3 contained a significant proportion of oil. Pressure gradients were not defined, so a drill stem test is planned to confirm fluid type and reservoir quality.

Value this in the calculator →Discuss in chat

22 Aug 2008drilling scheduled▲ Good

Acquisition began on 22 August of the Rose 3D seismic survey, covering about 350 sq km of Cue's 100% WA-389-P. Mapping shows leads that may hold multiple TCF of gas. Cue says data could mature drilling opportunities in 2009/2010.

Value this in the calculator →Discuss in chat

22 Aug 2008drilling progress report● Neutral

Cue repeats Oil Search's 21 August report: Cobra-1A ST3 at 2,836m, logging under way, Hedinia thicker and better quality with elevated gas readings. No new information.

Value this in the calculator →Discuss in chat

21 Aug 2008drilling progress report▲ Good

Cobra 1A ST3 reached 2,836m and is being logged. The Hedinia is similar to ST2 and thicker and better quality than the earlier holes, with elevated gas readings. Fluid type is still to be determined.

Value this in the calculator →Discuss in chat

15 Aug 2008drilling progress report● Neutral

Cue repeats Oil Search's 14 August report: Cobra-1A ST3 at 2,766m, liner to be cemented, then upper Hedinia drilling and fluid evaluation. No new information.

Value this in the calculator →Discuss in chat

14 Aug 2008drilling progress report● Neutral

Cobra 1A ST3 is at 2,766m and preparing to cement a 5½-inch liner. It will then drill the upper Hedinia and evaluate fluid type. No result yet.

Value this in the calculator →Discuss in chat

5 Aug 2008drilling progress report● Neutral

ST2 reached 2,894m. Logs show a thicker, better-quality Hedinia with elevated gas readings, but the pipe stuck and no pressure data was obtained. A third sidetrack (ST3) will be drilled, possibly with a liner. Fluid type still unconfirmed.

Value this in the calculator →Discuss in chat

31 July 2008drilling progress report● Neutral

Cobra 1A ST2 was drilling ahead at 2,826m in 6-inch hole. The plan is to drill below the upper Hedinia lobe and log the sidetrack. No result yet.

Value this in the calculator →Discuss in chat

28 July 2008drilling progress report● Neutral

ST1 logs show the Hedinia has an upper lobe, thinner than expected but interpreted to hold hydrocarbons, and a water-bearing lower lobe. Pressure data was again unreliable, so a second sidetrack (ST2) is being drilled to find a thicker section.

Value this in the calculator →Discuss in chat

18 July 2008drilling progress report● Neutral

Cue repeats Oil Search's 17 July report: Cobra-1A ST1 at 2,701m, Iagifu water-bearing, Hedinia hydrocarbon column indicated, sidetrack planned to 2,903m for pressure sampling. No new information.

Value this in the calculator →Discuss in chat

17 July 2008drilling progress report● Neutral

Oil Search reports Cobra 1A ST1 drilling at 2,701m. Wireline logs show the Iagifu is water-bearing but a hydrocarbon column is indicated in the Hedinia. A roughly 300m sidetrack to 2,903m will take pressure readings and samples. No result yet.

Value this in the calculator →Discuss in chat

16 July 2008investor presentation▲ Good

Third-party release (MEO): rig contracts signed for the Songa Venus to drill Zeus-1 in WA-361-P in late October 2008. MEO cites bright-spot and AVO seismic responses and potential above 10 Tcf. Cue (20% if it funds 5%) has until 10 September to elect.

Discuss in chat

14 July 2008drilling result▼ BadMajor

Logging of Cobra-1A to 3,202m found the deeper Iagifu sandstone water-bearing, ending the primary target. The shallower Hedinia may hold a significant hydrocarbon column, but pressure readings were unreliable, so a short sidetrack (Cobra-1A ST1) began. Cue holds 10.947%.

Value this in the calculator →Discuss in chat

11 July 2008drilling progress report● Neutral

Cue repeats that Cobra-1A is at 3,202m; the wireline tool was recovered by 11 July and logging has resumed. A decision on the forward program follows. No result yet.

Value this in the calculator →Discuss in chat

10 July 2008drilling progress report● Neutral

Cobra-1A is at 3,202m total depth, recovering a stuck wireline logging tool. Final logging should finish in days, then a decision on the forward program. No result yet.

Value this in the calculator →Discuss in chat

4 July 2008drilling progress report● Neutral

Cue repeats that Cobra-1A reached its 3,202m final depth, having drilled through the Iagifu sandstone, with open hole logging next. No result yet.

Value this in the calculator →Discuss in chat

4 July 2008farm in farm out agreement▲ GoodMajor

MEO has irrevocably committed to drill the multi-TCF-potential Zeus-1 gas well in WA-361-P in October 2008. Cue is carried free for a 15% interest and may contribute up to 5% of the well cost to keep its 20%.

Value this in the calculator →Discuss in chat

3 July 2008drilling progress report● Neutral

Cobra-1A reached its final depth of 3,202m after drilling through the Iagifu sandstone in 6-inch hole. Open hole logging to evaluate the Hedinia and Iagifu is being prepared. No result yet.

Value this in the calculator →Discuss in chat

3 July 2008farm in farm out agreement▲ GoodMajor

Third-party release: MEO formed an alliance with Resource Development International, which will fund most of the Zeus-1 well in WA-361-P and leave MEO 25%. Cue (20%) may fund up to part of the well. Zeus-1 is planned for October 2008.

Value this in the calculator →Discuss in chat