Stockle - the stock oracle

CUE Energy Resources Ltd

ASX:CUE
A$0.105Close 7 Oct 2026 · delayed

Past year: ▼ 5%(9.90c – 14.5c AUD)

Market cap
A$73.8m
Shares on issue
703m
In-ground value
—
Risked multiple
under review
Story beats
249 since 2006
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

9 May 2012investor presentation● Neutral

May presentation repeats known figures: 2.7 mmbbl oil and 118 Bcf gas, A$42.3m cash, no debt, 698.1m shares. Market cap is A$188m at 27c. Shows the Maari appraisal well now Q4 2012 rather than Q1 2013.

Discuss in chat

7 May 2012farm in farm out agreement▲ GoodMajor

Woodside has agreed to farm BHP Billiton into WA-389-P for a 40% interest, with BHP paying up to a capped amount for 100% of Banambu Deep drilling. Cue stays at 35% (Woodside falls to 25%), subject to Cue's pre-emptive rights and approvals. Cue sees it as an endorsement.

Value this in the calculator →Discuss in chat

30 Apr 2012quarterly activities report● Neutral

March quarter: revenue receipts A$7.1m, cash A$42.3m, and final debt repayment (about A$2.5m) made, so Cue is debt free and unhedged. Maari output averaged about 8,000 bopd in March after a week-long shutdown. Banambu Deep is set for mid-May.

Discuss in chat

27 Apr 2012drilling scheduled▲ Good

Banambu Deep-1 in WA-389-P (Woodside operator, Cue 35%) is expected to start drilling mid-May, to 4,800m in about 60 days. Woodside carries Cue's costs. Confirms the well expected for Q2 2012; it targets a gas prospect.

Value this in the calculator →Discuss in chat

17 Apr 2012drilling spud● NeutralMajor

Naga Selatan-1, an oil prospect in the Mahakam Hilir PSC (Cue 40%, SPC operator 60%), was expected to spud on 17 April. Planned depth is 6,500 ft, about 33 days, then 15 days of evaluation. Follows the disappointing Naga Utara-1.

Value this in the calculator →Discuss in chat

4 Apr 2012regulatory community update● Neutral

Recording began on a 254 sq km Maari 3D seismic survey over PMP 38160 (Cue 5%) and PEP 51313 (Cue 20%), covering Maari, Manaia and the Pike and Paua prospects. It will help pick wells for the 2012/13 summer appraisal campaign; about 20 days.

Discuss in chat

26 Mar 2012well test result▼ BadMajor

Naga Utara-1 tests were inconclusive or poor. The open-hole test failed to flow stably, and the cased-hole test gave only small gas and probable water, judged tight and unlikely commercial. The well will be plugged and suspended, and the rig moves to Naga Selatan. Disappointing for the 80 Bcf prospect.

Discuss in chat

20 Mar 2012investor presentation● Neutral

March presentation repeats known figures: 2.7 mmbbl oil and 118 Bcf gas, A$50.7m cash and US$2.6m debt. Market cap is A$201m at 29c. 2012 forecast is 350,000 bbl oil and 4.0 Bcf gas. No new announcements.

Discuss in chat

16 Mar 2012well test result● Neutral

Naga Utara-1 reached 5,066 ft; a gas sample was recovered on wireline and an open-hole drill-stem test is under way. Results are being evaluated, so there is no flow rate or commercial conclusion yet.

Discuss in chat

9 Mar 2012drilling result▲ GoodMajor

Naga Utara-1 sidetrack was called at total depth of 5,066 ft because high-pressure gas influx was nearing the rig's pressure rating. Gas sands were found at 4,825-4,880 ft and 4,975-5,040 ft. An appraisal well with high-pressure equipment is planned.

Value this in the calculator →Discuss in chat

9 Mar 2012production update▲ GoodMajor

Wortel started gas on 31 January and is stable at about 50 BBTU/d. Combined with Oyong, it meets the 90 BBTU/d contract. Oyong-11 lifted field oil output above 3,000 bopd. Cue's net share is about 2,500 boepd before government production sharing.

Discuss in chat

8 Mar 2012joint venture update▲ GoodMajor

WA-360-P was renewed for five years from 6 March 2012. Cue's stake rises from 15% to 37.5% with MEO (operator) on 62.5%, after Petrobras and Rankin Trend left. This resolves the renewal and stake thread. Year 1 commits to buying existing 3D seismic.

Discuss in chat

28 Feb 2012half year report● Neutral

Half-year to December 2011: profit A$3.9m versus A$1.3m, mostly from a A$2.68m foreign exchange gain. Production income fell to A$20.0m and gross margin to A$12.2m. Cash was A$50.7m, project debt US$2.6m, and Wortel adds 14 Bcf net to Cue. No dividends.

Discuss in chat

27 Feb 2012drilling result▲ GoodMajor

The Naga Utara-1 sidetrack reached 4,653 ft; preliminary log interpretation shows three hydrocarbon-bearing sandstones with about 80 net feet. Detailed evaluation is pending, and drilling will continue to 5,500 ft. A first positive indication, not yet a confirmed discovery.

Value this in the calculator →Discuss in chat

17 Feb 2012drilling progress report● Neutral

Plugging the high-pressure gas zone in Naga Utara-1 was difficult, with the well flowing gas and producing 5-8 metre flares over seven days. Sidetrack equipment is on site, so drilling will resume immediately with no suspension, an improvement on the prior plan.

Value this in the calculator →Discuss in chat

13 Feb 2012drilling progress report▼ Bad

Naga Utara-1 hit a high-pressure gas zone (4,780-4,887 ft); gas was flared for three days and drill pipe is stuck. The well will be plugged and sidetracked to re-drill the gas zone after about three weeks' suspension, with no rig costs during the suspension.

Value this in the calculator →Discuss in chat

8 Feb 2012drilling progress report▲ Good

Naga Utara-1 is at 4,843 ft with multiple hydrocarbon shows below 3,040 ft. A high-pressure gas flow occurred at current depth, so mud weight is being raised before logging. Encouraging, but no result yet.

Value this in the calculator →Discuss in chat

1 Feb 2012production update▲ GoodMajor

Santos announced first gas from Wortel in the Sampang PSC (Cue 15%), the milestone expected since late 2011, a month later than first hoped. Combined Oyong and Wortel output is expected to be 90 TJ/day, sold for domestic power generation. Delivered on budget per Santos.

Discuss in chat

25 Jan 2012drilling progress report● Neutral

Naga Utara-1 is at 2,232 ft with 13 3/8 inch casing set at 982 ft. About 19 more days remain to reach 5,500 ft. No hydrocarbon result reported yet.

Value this in the calculator →Discuss in chat

24 Jan 2012quarterly activities report● Neutral

December quarter: revenue receipts A$9.1m, no hedges, and debt down 31.7% to A$2.8m with final repayment expected in Q1 2012. Naga Utara-1 is drilling, Wortel is due by end of January, and WA-360-P renewal is lodged with Cue rising to 37.5%. Woodside's WA-389-P well is expected in Q2 2012.

Discuss in chat

20 Jan 2012dividend declaration● Neutral

Octanex, a third-party shareholder, plans to distribute its 43.7m Cue shares to its own members as a special dividend (1 Cue share per 5 Octanex shares; record date 28 March 2012). Cue itself is not paying anything and no new money is involved. Cue shares were valued at 24c.

Discuss in chat

18 Jan 2012drilling progress report● Neutral

Naga Utara-1 (Cue 40%) is at 988 ft, with a pilot hole drilled to manage shallow gas hazards. About 25 more days remain to the 5,500 ft target, including testing. No result yet.

Value this in the calculator →Discuss in chat

12 Jan 2012production update▲ Good

Wortel-3 and 4 are drilled and completed as gas producers, and the rig has moved to the Oyong-11 infill oil well. First gas is expected by end of January 2012. Budget stays US$105.1m (Cue US$15.8m); Cue's net share is about 2,700 boepd after infill drilling.

Discuss in chat

11 Jan 2012drilling spud● NeutralMajor

Naga Utara-1 spudded on 5 January 2012 in the Mahakam Hilir PSC, Cue's first well under its Indonesian farm-in (40%). Target depth is 5,500 ft, about 30 days with testing. At 10 January it was at 223 ft.

Value this in the calculator →Discuss in chat

4 Jan 2012drilling scheduled● Neutral

Naga Utara-1, a gas prospect next to the Sambutan field in Mahakam Hilir PSC (Cue 40%), is expected to spud on 4 January 2012. Planned depth is 5,500 ft, taking about 30 days. Weekly progress reports will follow.

Value this in the calculator →Discuss in chat

21 Dec 2011production update▼ Bad

Wortel-4 is drilled and being completed; Wortel-3 follows. First gas export is now expected by end of January 2012, later than the late-December/early-January target. Budget still US$105.1m, Cue share US$15.8m.

Discuss in chat