Stockle - the stock oracle

CUE Energy Resources Ltd

ASX:CUE
A$0.105Close 7 Oct 2026 · delayed

Past year: ▼ 5%(9.90c – 14.5c AUD)

Market cap
A$73.8m
Shares on issue
703m
In-ground value
—
Risked multiple
under review
Story beats
249 since 2006
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

30 May 2014director officer appointment● Neutral

Rowena Sylvester appointed a director from 30 May 2014. She has earlier senior Treasury roles at Ampolex and Optus Vision. First of the two replacement directors Cue said it was recruiting.

Discuss in chat

16 May 2014director officer appointment● Neutral

Director Paul Moore resigned effective 15 May 2014, citing his workload as Chief Executive of Todd Energy, Cue's largest holder (27.1%). The board falls to two directors, and Cue says it is recruiting two new directors.

Discuss in chat

29 Apr 2014quarterly activities report● NeutralMajor

March quarter: revenue A$8.89m, cash A$43.32m, no debt. Maari development drilling has begun with Ensco 107, expected to add 550 bopd net to Cue. Cue is starting a sale process for its PNG assets and testing farmout of Mahakam Hilir with the operator.

Discuss in chat

31 Mar 2014investor presentation● Neutral

March/April 2014 presentation: cash A$50.1m, no debt, market cap A$90.76m at 13c. Cue says it is assessing acquisitions of production or near-development projects and farm-downs or exits of existing acreage. Largely repeats known strategy.

Discuss in chat

12 Mar 2014investor presentation● Neutral

March 2014 presentation restates the plan: Ensco 107 on location April 2014 for Maari development (4 producers, 1 injector), Whio-1 around May, Te Kiri North-1 in Q4. Cue says development is expected to double production by 2015. Farm-outs of WA-359-P and Mahakam Hilir under way.

Discuss in chat

7 Mar 2014other● Neutral

S&P Dow Jones index rebalance notice for the S&P/ASX indices. No substance specific to Cue in the text provided.

Discuss in chat

21 Feb 2014director officer appointment● Neutral

Director Timothy Dibb resigned effective 20 February 2014 to take a senior role overseas. He joined in November 2011; the board falls to three directors, with no replacement mentioned.

Discuss in chat

20 Feb 2014half year report▼ Bad

Half-year to December 2013: loss of A$1.14m against a A$3.22m profit a year earlier; production income fell 48% to A$14.78m because Maari was shut for repairs. Cash over A$50m, no debt, no dividend. Manaia-2 described as an oil discovery.

Discuss in chat

30 Jan 2014quarterly activities report● Neutral

December quarter: revenue A$7.41m, cash A$50.14m (from A$57.62m), no debt. Manaia-2 found Moki oil; Naga Utara-2 showed only gas indications. WA-360-P/361-P farmdown ended without an acceptable offer; Maari producing about 11,000 bopd; PEP 51149 renewed with a 2014 well.

Discuss in chat

3 Jan 2014drilling result▼ BadMajor

Naga Utara-2 sidetrack reached 1,847m and is being plugged and abandoned. Hydrocarbon indications were judged insufficient to justify testing, and hole condition prevented pressure and fluid sampling. Disappointing result for Cue's 40%; future exploration decision pending.

Value this in the calculator →Discuss in chat

20 Dec 2013drilling progress report● Neutral

Naga Utara-2 was successfully sidetracked around the stuck pipe and is drilling at 1,676m toward a revised total depth of 2,078m. Next report due 3 January 2014.

Value this in the calculator →Discuss in chat

19 Dec 2013production update▲ GoodMajor

Maari field restarted after a 145-day shut-in, with all wells back online by 17 December at about 11,600 barrels a day. Cue's share of repair cost is about US$4m, much expected from insurance; about 42,000 barrels net deferred. Resolves the Maari restart thread.

Discuss in chat

13 Dec 2013drilling progress report▼ Bad

Attempts to free the stuck drill string failed and it was cut at 1,482m. The operator is preparing to sidetrack around the obstruction. Second mechanical problem after the Naga Utara-1 difficulties.

Value this in the calculator →Discuss in chat

6 Dec 2013drilling progress report▼ Bad

Naga Utara-2 drill string became stuck at 1,817m because of the formation; recovery operations are under way. A setback for the Mahakam Hilir well in which Cue holds 40%.

Value this in the calculator →Discuss in chat

28 Nov 2013drilling progress report● Neutral

Naga Utara-2 is at 1,559m, drilling ahead in the final 8½ inch section toward a proposed total depth of 2,065m after casing was set at 1,497m. No results yet.

Value this in the calculator →Discuss in chat

15 Nov 2013drilling result● NeutralMajor

Manaia-2/2A is being plugged and abandoned as planned. Mangahewa results were in line with expectations; Moki oil samples were taken, but fluid analysis is ongoing, so no oil volume is yet confirmed. Last weekly report.

Value this in the calculator →Discuss in chat

14 Nov 2013agm notice● Neutral

AGM chairman address and presentation: recounts board changes, including director Steven Koroknay's death in June 2013, and the board staying at four. Backs CEO Biggs' reserve-replacement growth strategy. Mostly repeats known material.

Discuss in chat

14 Nov 2013agm notice● Neutral

AGM results: the remuneration report and Geoffrey King's re-election both carried. Admin outcome only.

Discuss in chat

8 Nov 2013drilling progress report● Neutral

Manaia-2/2A reached total depth of 2891m on 4 November and is being logged. Elevated gas readings and oil fluorescence were seen in the Mangahewa Formation. Significance to be evaluated.

Value this in the calculator →Discuss in chat

8 Nov 2013drilling progress report● Neutral

Partner Horizon Oil (10%) says Manaia-2/2A met its drilling objectives, with oil indications in Moki samples and cores. Mangahewa data will help optimise a planned additional development well. Mostly repeats Cue's own reports; analysis continues.

Value this in the calculator →Discuss in chat

1 Nov 2013drilling progress report● Neutral

Manaia-2 was sidetracked at 2005m after a cement plug and renamed Manaia-2A. It is drilling toward a deeper planned depth of 2886m. Potential is stated as at least 11 million barrels gross.

Value this in the calculator →Discuss in chat

28 Oct 2013quarterly activities report▼ Bad

September quarter: cash A$57.62m, no debt; revenue A$7.89m, down from A$16.96m. Maari has been shut in since 20 June for repairs, restart expected January 2014. Cue plans to start a WA-359-P farmdown in Q4 2013 and is reducing its WA-360-P/361-P interests. WA-389-P renewed at 40%.

Discuss in chat

25 Oct 2013drilling progress report● Neutral

Manaia-2 casing was cemented, but debris at the bottom halted drilling at 2008m; the debris has been cleared and drilling ahead toward 2,850m is being prepared. Minor setback.

Value this in the calculator →Discuss in chat

18 Oct 2013drilling progress report▲ Good

Manaia-2 logging finished; oil-indicating fluid samples and oil-stained cores were recovered from the Moki Formation, with analysis ongoing. Operator is preparing to run 9 5/8 inch casing. Early encouraging signs, not yet a confirmed result.

Value this in the calculator →Discuss in chat