Stockle - the stock oracle

CUE Energy Resources Ltd

ASX:CUE
A$0.105Close 7 Oct 2026 · delayed

Past year: ▼ 5%(9.90c – 14.5c AUD)

Market cap
A$73.8m
Shares on issue
703m
In-ground value
—
Risked multiple
under review
Story beats
249 since 2006
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

19 June 2008drilling progress report● Neutral

Poor hole conditions stopped logging tools reaching the reservoir at Cobra-1A. Logging-while-drilling indicated possible hydrocarbons in the Hedinia. The hole is being reamed and casing set, with more data expected in about two weeks.

Value this in the calculator →Discuss in chat

12 June 2008drilling progress report▲ Good

Cobra-1A reached 3,100m; the primary Iagifu sandstone was encountered with elevated gas readings. Logging will decide fluid content and quality. NW Paua 1 (not Cue's) is being abandoned.

Value this in the calculator →Discuss in chat

12 June 2008drilling progress report● Neutral

Cue repeats that Cobra-1A reached 3,100m, encountering the primary Iagifu sandstone with elevated gas readings. Wireline logging will assess fluid content; no result yet.

Value this in the calculator →Discuss in chat

5 June 2008drilling progress report▲ Good

Cobra-1A reached 2,946m. The secondary Hedinia target was penetrated with elevated gas readings. Not yet evaluated, but an early encouraging sign. The NW Paua 1 well reported is not Cue's.

Value this in the calculator →Discuss in chat

18 Apr 2008drilling progress report● Neutral

Cobra-1A top-drive repairs were completed and drilling restarted. The well was at 1,155m completing 11¾-inch casing. Target depth is 3,100m. No geological result yet.

Value this in the calculator →Discuss in chat

8 Apr 2008farm in farm out agreement▲ Good

Third-party release: MEO secured the Songa Venus rig to drill the Zeus prospect in WA-361-P late 2008 and reports positive AVO responses. Cue holds 20% before drilling; MEO plans to farm out for funding. Cue's cost share is not stated.

Value this in the calculator →Discuss in chat

3 Apr 2008drilling progress report▼ Bad

Oil Search reports Cobra-1A at 1,039m, waiting for parts to repair the rig's top-drive system after 506m of progress in the week. Other wells reported are not Cue's.

Value this in the calculator →Discuss in chat

20 Mar 2008drilling progress report● Neutral

Oil Search reports Cobra-1A began drilling on 19 March from a new cellar and was at 23m on 20 March. Other wells are not Cue's. Replacement well is under way.

Value this in the calculator →Discuss in chat

14 Mar 2008drilling progress report▼ Bad

Cue repeats the operator's report that Cobra-1 is abandoned after continued drilling difficulties, with Cobra-1A to start from a new cellar next week. Duplicate of the Oil Search release.

Value this in the calculator →Discuss in chat

13 Mar 2008drilling progress report▼ Bad

Because of continued drilling difficulties, the operator decided to abandon Cobra-1 and restart from a new cellar as Cobra-1A, due to start next week. Rig move is under way. A setback to the well Cue holds 10.947% in.

Value this in the calculator →Discuss in chat

7 Mar 2008drilling progress report● Neutral

Cobra-1 casing obstruction was cleared and the hole is being deviated around deeper obstacles while a pilot hole is enlarged. The plan is to drill ahead; target depth is unchanged at 3,100m.

Value this in the calculator →Discuss in chat

29 Feb 2008drilling progress report▼ Bad

Cobra-1 top hole was re-drilled and casing run to 166m. At 28 February the well was at 168m retrieving cementing equipment. Still very shallow against the 3,100m target.

Value this in the calculator →Discuss in chat

22 Feb 2008drilling progress report● Neutral

Cobra-1 lost tubing has now been fully recovered after the hole collapsed at 167m during cementing. Planned depth is still 3,100m. Still no geological result.

Value this in the calculator →Discuss in chat

21 Feb 2008drilling progress report▼ Bad

Oil Search's weekly report: Cobra-1 hole collapsed during cementing at 167m and lost tubing was over half recovered. Other wells (NW Paua, Dahgah-1) are not Cue assets. Cobra-1 setbacks continue.

Value this in the calculator →Discuss in chat

15 Feb 2008drilling progress report● Neutral

Cobra-1 was re-spudded on 12 February and by 14 February was at 65m, re-accessing the original hole drilled to 167m. Planned depth stays 3,100m. No geological result yet; continues the site-subsidence delay.

Value this in the calculator →Discuss in chat

8 Feb 2008drilling progress report● Neutral

Investigations into Cobra-1 site subsidence are complete and remedial works are done. The rig is being moved back, with drilling expected to resume in about a week. No new geological result.

Value this in the calculator →Discuss in chat

1 Feb 2008drilling progress report▼ Bad

Cobra-1 reached only 167 metres in its first week. Subsidence at the well site has stopped drilling while the operator investigates. Planned depth is now 3,100m.

Value this in the calculator →Discuss in chat

25 Jan 2008drilling spud● NeutralMajor

Cobra-1 began drilling on 25 January 2008, later than the mid-January plan. It targets 30-40 million barrels unrisked (Cue 10.947%, 3.3-4.4 million barrels) to 3,071m, taking about 60 days. This is the long-flagged Murray Deep well.

Value this in the calculator →Discuss in chat