Each one in plain English, with the numbers worked through for a shareholder.
10 Apr 2012drilling progress report● Neutral
Gazelle-P3 repairs to the rig's top drive are complete; crews are now fishing for the stuck pipe at 1,070 m, with drilling expected to resume within days. Continues the 2 April setback; no hydrocarbon indications yet.
Rialto published its AIM Admission Document on 5 April 2012, with admission expected around 12 April. No funds are raised; the whole share capital is admitted, making Rialto dual-listed on AIM and ASX. Follows the Q1 target slightly late.
Non-executive director Chaim Lebovits, founder of C&L Natural Resources (sold to Rialto, holder of the CI-202 interest), stood down from the board on 5 April 2012. Second non-executive departure in about two weeks.
Gazelle-P3 drill pipe stuck at 1,070 m; during freeing attempts the drill string parted and rig equipment failed. Transocean estimates two weeks of repairs and fishing before drilling resumes. First setback for the three-well programme; total days now prognosed at 59.
Gazelle-P3 drilled to 1,000 m after setting 20-inch casing at 545 m; no hydrocarbon indications yet. Prognosed total time is 45 days to drill. Next step is setting 13 3/8-inch casing at 1,540 m.
27 Mar 2012capital raising announcement▲ GoodMajor
IFC and its ALAC fund signed the subscription agreement for about US$20m: 63,707,267 shares at A$0.30 (A$19.1m) plus 15.9m options. IFC board approved 22 March; closing expected mid-April. This resolves the IFC funding thread opened in January.
What it means for a shareholder
63.7m new shares at A$0.300 to raise about A$19.1m. That's 9.3% dilution: every existing holder's slice gets 9.3% smaller. If you held A$1,000 of shares (3,333 at the issue price), your slice goes from 0.000539% to 0.000489% of the company. To keep it you'd need 343 more shares - about A$103 at the issue price.
Non-executive director Glenn Whiddon resigned immediately, only weeks after becoming a non-executive director when Bruce Burrows became chair. Joint Company Secretary Neil Hackett joins the board as non-executive director while a replacement is sought.
Half-year report to 31 December 2011 shows a gross loss of A$3.35m (prior year A$3.91m). It restates the RPS resource estimates and Gazelle development progress. Text provided is truncated, so no further figures are confirmed.
Gazelle-P3 spudded 12 March 2012 on the GSF Monitor, first of three CI-202 wells (85% Rialto, operator). Planned depth about 3,400 m, 60-70 days to drill and test. FID now targeted Q3 or Q4 2012; first production by end 2013.
Rialto issued 144,750,000 shares on 8 March 2012 to directors and institutional and sophisticated investors, with the required compliance notice. This matches Tranche 2 of the A$60m placement at A$0.30 (inference on link), completing the placement after shareholder approval.
Euroz conference presentation repeats known points: A$200m pro forma market cap, enterprise value A$71m, three-well CI-202 programme, RPS resource figures, and AIM listing by end of Q1. Still says drilling expected to start in February. No new information.
Rialto will move to amend the 6 March meeting resolution so the IFC placement of up to 63,707,267 shares (with 1 option per 4 shares) can be issued to IFC or associates. Half is intended for IFC's ALAC Fund, subject to finalising the subscription.
2 Mar 2012director officer appointment● NeutralMajor
Non-executive director Bruce Burrows becomes Non-Executive Chairman from 7 March 2012, with Glenn Whiddon moving to non-executive director. Linked to the London relocation and planned AIM listing. The company says the three-well programme is now fully funded.
Transocean's GSF Monitor rig has been released to Rialto and will be towed from Nigeria to CI-202. The Gazelle-P3 well is expected to spud before mid-March 2012, taking 60-70 days to drill and test. The three-well programme should take about six months; the rig has been delayed from the earlier February plan.
Rialto issued 56,250,000 shares to employees and institutional investors on 2 February 2012, with the required compliance notice. This appears to be the first tranche of the placement (announced as about 55.25m shares), plus some employee shares (inference).
Invitation letter to eligible shareholders for the share purchase plan: up to $15,000 each at $0.30 per share, capped at $8m in total, closing 15 February 2012. Terms already announced on 27 January.
Required cleansing notice for the share purchase plan, which offers up to 26,666,667 shares at $0.30 to raise up to $8m, opening 1 February 2012. Administrative; no new substance.
27 Jan 2012capital raising announcement▲ GoodMajor
Raising A$60m at A$0.30 per share (about 200m shares, a 14% discount to last close) in two tranches, plus an up to A$8m share purchase plan. The IFC investment is now set at about 63.7m shares at A$0.30 plus 15.9m options at A$0.50. Funds the three-well CI-202 programme; AIM listing targeted by end of quarter.
What it means for a shareholder
63.7m new shares at A$0.300 to raise about A$19.1m. That's 15% dilution: every existing holder's slice gets 15% smaller. If you held A$1,000 of shares (3,333 at the issue price), your slice goes from 0.000889% to 0.00076% of the company. To keep it you'd need 566 more shares - about A$170 at the issue price.
Equity raising presentation repeats the A$60m placement at 30c, the A$8m purchase plan and the IFC placement. Pro forma shares are about 665m, with pro forma cash of A$129m (31 Dec 2011) and market cap about A$200m at 30c.
January 2012 operations update repeats known facts: three-well CI-202 campaign from February, Gazelle FDP approval, IFC US$20m proposal, and an AIM listing intended by end of Q1 2012. Accra 18% still awaits approvals. No new information.
Block-wide 3D seismic survey of 891 km2 over CI-202 (Rialto 85%, operator) is complete, with contractor Polarcus. Processing starts shortly to refine prospect maps and the five existing discoveries' resources. No new resource numbers yet.
16 Jan 2012capital raising announcement▲ GoodMajor
Agreement in principle for the World Bank's IFC to invest about US$20m via a private placement of shares and warrants, to fund the CI-202 drilling due February 2012. It needs IFC board approval after a 60-day disclosure period, plus shareholder approval. This answers the funding need flagged earlier.
Issued 9,645,000 performance rights and 4,050,000 options (exercisable at $0.43, expiring 21 Dec 2016) to employees under plans approved at the 29 Nov 2011 AGM, including to MD Schrull and COO Nieto. Routine staff incentive issue; 1,791,667 options cancelled.
Côte d'Ivoire approved the Gazelle field development plan, with a 25-year exploitation area, and a gas sales MOU was signed for up to 100 mmscfd. Production is targeted for Q4 2013 at 8,000 bopd, later than earlier targets. Drilling starts February 2012; FID is expected mid-2012.
Gazelle field development plan was submitted on 4 November, with approval expected by year end. The GSF Monitor rig is expected to be available in late Q1 2012, and long-lead drilling items are arriving in Abidjan. A new Deputy General Manager has been hired.
October 2011 presentation at the RBC African Oil Conference in Toronto repeats the September deck: 85% of CI-202, cash about A$53m, market cap A$169m, and RPS resources. No new information.
2011 Annual Report repeats known facts: A$59.1m cash at 30 June and no debt, two raisings totalling A$88m in the year, the RPS resource figures, and a 3-well (2 firm) programme from Q1 2012. AIM listing is still being pursued.
Financial report for the year to 30 June 2011: net loss A$7.98m (A$3.44m prior year) on revenue of A$1.45m. The 25% C+L Natural purchase cost A$17.9m including costs. Cash was A$59.1m with no debt, per the annual report highlights.