Stockle - the stock oracle

Bounty Oil & Gas NL

ASX:BUY
A$0.008Close 7 Oct 2026 · delayed

Past year: ▲ 167%(0.15c – 3.10c AUD)

Market cap
A$7.9m
Shares on issue
985m
In-ground value
A$2.13bn
Risked multiple
under review
Story beats
150 since 2006
Last event
19 June 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

7 Feb 2007farm in farm out agreement▲ GoodMajor

India's BPCL farms into AC/P32 for 20%, paying US$1.42M towards past seismic costs (Bounty's share US$227,200). Bounty's stake falls from 16% to 12.8%. One well is required in the 12 months from 27 May 2007, optional for all parties.

Value this in the calculator →Discuss in chat

21 Dec 2006drilling scheduled● Neutral

Parrot Hill-2 in EP 435 has government approval and a rig contract with DCA Rig 7, but spudding slips from November 2006 to January 2007. Bounty is listed at 5% in the joint venture. It tests updip of a 1987 well that found a 6.2m oil column.

Value this in the calculator →Discuss in chat

23 Nov 2006farm in farm out agreement● Neutral

Empire's Rough Range signed a farm-in with Jurassica for $2.2M towards three Carnarvon wells, planned for DCA Rig 7. Not Bounty's permits (EP 439 and others); Bounty is not named as a party in this text.

Value this in the calculator →Discuss in chat

25 Oct 2006farm in farm out completion▲ GoodMajor

Bounty obtained a 12-month PEP 11 extension (to August 2007 to drill one well) and signed the farm-in with MEC's Asset Energy: 25% for seismic, a further 60% for funding a well. Bounty is free-carried; Peak Group is engaged to secure a rig. Resolves the PEP 11 thread.

Value this in the calculator →Discuss in chat

28 Sept 2006farm in farm out agreement● NeutralMajor

Operator Empire farmed out 25% of EP 435 to Phoenix Resources for $800,000 towards the Parrot Hill-2 well, planned for November 2006 with ~750,000 barrels potential. Bounty's EP 435 interest remains 5% per the table, with Empire falling to 45%.

Value this in the calculator →Discuss in chat

13 June 2006drilling result▼ BadMajor

Dune-1 was a dry hole: it reached 1,401 metres, hit excellent-quality Birdrong sandstone at 1,369 metres but found no oil. It was plugged and the rig released. Operator is weighing Parrot Hill-2 next. Bounty's 5% interest earned nothing.

Value this in the calculator →Discuss in chat

13 June 2006drilling result▼ Bad

Bounty confirms Dune-1 (5%) found no commercial hydrocarbons at 1,401 metres and has been plugged. The joint venture will evaluate further drilling in EP 435 and EP 412, where AOC's option and Rough Range's well obligation remain.

Value this in the calculator →Discuss in chat

9 June 2006drilling progress report● Neutral

Bounty's repeat of the Dune-1 report: 1,367 metres, gas increasing in the Muderong seal, Birdrong target at about 1,379 metres. No new information.

Value this in the calculator →Discuss in chat

9 June 2006drilling progress report● Neutral

Dune-1 at 1,367 metres in the Muderong Shale, with gas rising to 300 ppm methane (total gas 3 units) just above the Birdrong reservoir predicted near 1,379 metres. An encouraging sign, though not a result.

Value this in the calculator →Discuss in chat

8 June 2006drilling progress report● Neutral

Dune-1 reached 1,344 metres and entered the Muderong Shale seal. The secondary Windalia target was hit at 1,300 metres with no reservoir sand, consistent with nearby wells. Birdrong, the main target, is prognosed at 1,380 metres.

Value this in the calculator →Discuss in chat

7 June 2006drilling progress report● Neutral

Dune-1 drilled to 1,287 metres in claystone, with a small gas peak of 12 units at 1,276 metres. Not a reservoir result; the Birdrong target is near.

Value this in the calculator →Discuss in chat

6 June 2006drilling progress report● Neutral

Dune-1 reached 1,234 metres in claystone with background methane of 120-275 ppm. Windalia objective is next, then the Birdrong target. No reservoir result yet.

Value this in the calculator →Discuss in chat

5 June 2006drilling progress report● Neutral

Dune-1 reached 1,111 metres after a bit change. Background methane rose slightly to 50-350 ppm, a modest gas reading but not a reservoir result. Reservoir targets still lie ahead.

Value this in the calculator →Discuss in chat

2 June 2006drilling progress report● Neutral

Empire's Dune-1 report: drilling at 936 metres in the Lower Gearle Siltstone, trace methane only. Reservoir targets still lie ahead near 1,300 metres. Bounty holds 5%.

Value this in the calculator →Discuss in chat

1 June 2006drilling progress report● Neutral

Dune-1 reached 812 metres. Tops were revised: Korojon Calcarenite at 710 metres and Upper Gearle siltstone at 780 metres, a thicker tertiary section, but reservoir objectives remain as predicted. Trace gas only.

Value this in the calculator →Discuss in chat

1 June 2006drilling progress report● Neutral

Bounty's repeat of the Dune-1 report: 812 metres after a bit change, drilling ahead slowly through compact Gearle section, trace methane only. No new information.

Value this in the calculator →Discuss in chat

31 May 2006drilling progress report● Neutral

Dune-1 changed to a new bit and completed a blowout preventer test, then drilled to 783 metres through claystone. Trace background methane only.

Value this in the calculator →Discuss in chat

31 May 2006drilling progress report● Neutral

Bounty's repeat of the Dune-1 report: 783 metres after a bit change and blowout preventer test, trace methane only. No new information; letterhead now shows a Sydney office.

Value this in the calculator →Discuss in chat

29 May 2006drilling progress report● Neutral

Dune-1 reached 722 metres after a delay fishing slip dye from the hole; the problem appears resolved. Only trace methane. Penetration rates are similar to nearby wells.

Value this in the calculator →Discuss in chat

29 May 2006drilling progress report● Neutral

Bounty's repeat of the Dune-1 report: 722 metres, drilling delayed by a fishing job, trace methane only. Participant table now correctly shows Asia Pacific Energy at 20% and Bounty at 5%.

Value this in the calculator →Discuss in chat

25 May 2006drilling progress report▼ Bad

Dune-1 drilled only 612–620 metres of marl; a technical problem with slip pieces in the borehole needed resolving before drilling could continue.

Value this in the calculator →Discuss in chat