Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

8 Mar 2006well test result▲ Good

Final Middleton-1 test result: gas flowed at 11.8 mmcf/d through a 5/8-inch choke at 1170 psi, with 0.1 barrels of condensate and no water. Slightly above the 11 mmcf/d preliminary figure.

Discuss in chat

7 Mar 2006flow test result▲ GoodMajor

Middleton-1's second test flowed gas at 11 million cubic feet a day over 2653-2663 m, with about 7 m of net gas pay. The well will be cased and suspended. This resolves the earlier misrun with a strong gas result.

Discuss in chat

7 Mar 2006well test result▲ GoodMajor

Beach confirms Middleton-1 DST 2 flowed gas at 11 mmcf/d at 1170 psi, with about 7 m net pay and a likely 3-9 m more in other sands. The well will be cased and suspended.

Discuss in chat

7 Mar 2006other▲ Good

Beach's media release calls Middleton-1 one of the Cooper Basin's strongest gas flows (11 mmcf/d), calling it a new discovery. Managing Director Reg Nelson says more evaluation is needed to size the reserves. Repeats the known test result.

Discuss in chat

7 Mar 2006other▲ Good

Great Artesian's media release repeats the Middleton-1 gas result (11 mmcf/d, 50:50 with Beach) and calls it its third success in three wells. It also notes Kiana oil, Smegsy gas starting. Nothing new on Beach.

Discuss in chat

6 Mar 2006drilling progress report● Neutral

Beach says Middleton-1 is preparing a second drill stem test (DST 2) over 2653-2663 m in the Patchawarra Formation. Results will follow; the earlier test had misrun.

Value this in the calculator →Discuss in chat

6 Mar 2006drilling progress report● Neutral

Great Artesian says weekend wireline logs on Middleton-1 indicate several possible gas zones in the Patchawarra. An inflate-straddle test (DST-2) will run over 2653-2663 m. No result yet.

Value this in the calculator →Discuss in chat

6 Mar 2006security holder rights change● Neutral

Beach writes to holders of options expiring 30 June 2006 (A$0.60 exercise). To receive the 1-for-10 bonus options and 0.5c dividend, they must exercise with payment by 31 March 2006.

Discuss in chat

3 Mar 2006drilling progress report● Neutral

Great Artesian repeats Beach's update: Middleton-1 at 2841 m, preparing to log, with several sands showing elevated gas readings. Routine, no result yet.

Value this in the calculator →Discuss in chat

3 Mar 2006joint venture update▲ Good

Anzon says Manta-2A has been tested and suspended for future production, and the rig has moved to Basker to batch-drill Basker-3, 4 and 5. Basker-2 produced 165k barrels in February (~5,900 bopd); about 380k barrels to be sold around 23 March.

Discuss in chat

2 Mar 2006drilling progress report● Neutral

Great Artesian repeats that Middleton-1 reached total depth of 2841 m in the Merrimelia Formation, with several sands showing elevated gas readings. Wireline logs are about to run; no test result yet.

Value this in the calculator →Discuss in chat

2 Mar 2006drilling progress report● Neutral

Middleton-1 reached total depth of 2841 m, shy of the planned 2895 m, and Beach is preparing to run wireline logs. Whether the well found hydrocarbons is not yet stated.

Value this in the calculator →Discuss in chat

1 Mar 2006security holder rights change▲ Good

Beach will give shareholders one bonus option per 10 shares held at 31 March 2006, exercisable at A$1.00 until 30 September 2006, alongside a 0.5c dividend paid 26 April with a 5% discount reinvestment plan.

Discuss in chat

1 Mar 2006investor presentation● Neutral

Beach's March investor presentation restates known facts: about 458.2m shares and 73.7m options, fully diluted market cap about A$570m at A$1.15, cash A$72.2m and debt A$1.1m at 31 Dec. It also notes the ATP633P award after an eight-year native title delay.

Discuss in chat

1 Mar 2006half year report▲ GoodMajor

Beach's half-year to 31 Dec 2005: revenue A$78.8m (up 159%) and net profit A$31.3m (up 227%). Cash 'other revenue' of A$34.7m includes the Anzon share sale and revaluation. Interim dividend 0.5 cents.

Discuss in chat

1 Mar 2006admin correction● Neutral

Amended re-release of the 1 March profit release, with the Gippsland equity wording changed per the title. The visible text matches the original (A$31.2m profit, 0.5c dividend, 1-for-10 bonus option); the exact amendment is not visible.

Discuss in chat

1 Mar 2006half year report▲ Good

Beach reports record half-year profit of A$31.2m, including a one-off A$19.4m from the Anzon share sale; excluding it, profit rose 24% to A$11.8m. Declares a 0.5c dividend and a 1-for-10 bonus option at A$1.00. P+P reserves 28.1 mmboe.

Discuss in chat

28 Feb 2006drilling result● Neutral

Middleton-1's first drill stem test over 2653.0-2666.6 m was misrun because the tool plugged, so there is no flow result. The sand will be evaluated from wireline logs instead, and drilling resumes.

Value this in the calculator →Discuss in chat

28 Feb 2006drilling progress report● Neutral

Great Artesian repeats Beach's report that Middleton-1's DST-1 misran due to tool plugging. Drilling ahead resumes at 2667 m, with the sand to be evaluated from logs.

Value this in the calculator →Discuss in chat

27 Feb 2006drilling progress report● Neutral

Great Artesian reports Middleton-1 at 2667 m after Patchawarra sandstones showed elevated gas readings. A drill stem test is planned over 2653.0-2666.6 m. Routine progress, no result yet.

Value this in the calculator →Discuss in chat

23 Feb 2006well test result▲ GoodMajor

Manta-2A tested at a stabilised 6,370 bopd of oil and 4.4 MMscf/d of gas with no water, with 32.9 m of net oil pay. Anzon calls it confirmation of a second oil field. The well stays shut in until Q3 2006; the rig moves on to Basker-3, 4 and 5. Beach holds 50%.

Discuss in chat

21 Feb 2006flow test result▲ Good

Magellan repeats Beach's Kiana-1 result: the second Patchawarra sand lifts combined flow to about 750 bopd, with 1,000 bopd expected in coming weeks. Magellan holds 30% of the joint venture. Nothing new.

Discuss in chat