Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

28 Apr 2006admin correction● Neutral

Cooper amends its earlier Silver Sands-1 update to give more detail on the oil fluorescence in the basal Birkhead/top Hutton section (1,628-1,637 m). No change in depth or direction.

Discuss in chat

27 Apr 2006well test result▲ Good

Cooper reports the Silver Sands-1 Namur open-hole test flowed about 860 bopd and 340 bwpd. Drilling continues to the main Birkhead and Hutton targets. Beach operates with 75%.

Discuss in chat

27 Apr 2006well test result▲ GoodMajor

Beach reports Silver Sands-1 DST-1 in the upper Namur flowed 859 bopd with 340 bwpd through a quarter-inch choke. Drilling continues to deeper targets. Beach operates with 75%, Cooper 25%.

Discuss in chat

27 Apr 2006security holder rights change● Neutral

Prospectus dated 17 March 2006 for the free 1-for-10 bonus options at $1.00, expiring 30 Sept 2006, up to about 53 million. Funds would go to exploration, production and working capital. Restates terms already announced.

Discuss in chat

26 Apr 2006other● Neutral

Bow Energy says a native title agreement clears the way for permit ATP 752P and a farm-in by Avery Resources. Bow plans Banff-1 in June using Beach's Hunt Rig 2. Third-party news; no direct change to Beach's holdings.

Discuss in chat

26 Apr 2006drilling progress report▲ Good

Cooper reports Silver Sands-1 at 1,358 m with strong oil fluorescence in the Namur. An open-hole production test is next. Beach operates with 75%.

Value this in the calculator →Discuss in chat

26 Apr 2006drilling progress report● Neutral

Beach weekly report: Silver Sands-1 at 1358 m with Namur oil shows; Harpoono-3 cased as a future injection well; Basker-3 at 3855 m; six Tipton West wells done. Repeats known results.

Value this in the calculator →Discuss in chat

26 Apr 2006drilling progress report● Neutral

Beach says Silver Sands-1 reached 1358.3 m with oil shows at the top of the Namur, and is pulling out to run DST-1. Result to follow. Same information as Cooper's release.

Value this in the calculator →Discuss in chat

21 Apr 2006drilling spud● Neutral

Cooper reports Silver Sands-1 spudded on 20 April, a near-field exploration well 1.5 km southeast of Christies, targeting Namur and Birkhead/Hutton oil to 1920 m. Beach operates with 75%.

Value this in the calculator →Discuss in chat

20 Apr 2006drilling result▼ Bad

Stuart reports the second Harpoono #3 Murta test recovered 25 bbl water and 1 bbl oil. The well will be cased and suspended as a future injection well for pressure maintenance. Final drilling release; Beach holds 33%.

Value this in the calculator →Discuss in chat

20 Apr 2006production update▲ Good

Stuart says Harpoono #2 is on stream, flowing over 200 bopd naturally from the new McKinlay pool, with a pump due next month. Rimfire and Revenue wildcats follow in late May or June. Beach holds 33.3%.

Discuss in chat

19 Apr 2006admin correction● Neutral

Beach confirms 50,595,409 bonus options were allotted on 18 April and lists the top holders and holder distribution. Administrative detail on the option issue already announced.

Discuss in chat

19 Apr 2006material agreement▲ GoodMajor

Arrow announces a Heads of Agreement for Australian Pipeline Trust to fund, own and operate Tipton West gas processing facilities (est. A$50m, up to 17 PJ a year). Beach holds 40%. Final documents targeted before June; first gas early 2007.

Discuss in chat

18 Apr 2006drilling progress report● Neutral

Beach weekly report: Christies-5 cased as an oil producer after tests of 85 and 318 bopd; Silver Sands-1 rigging up; Harpoono-3 at 1490 m with a water-bearing first test; Basker-3 at 3730 m. Mostly repeats known results.

Value this in the calculator →Discuss in chat

18 Apr 2006security holder rights change● Neutral

Beach despatched the 50,595,409 bonus options (1 for 10, $1.00, expiring 30 Sept 2006); quotation requested from 1 May. Shares on issue are 508,546,049, with 23.4m 60c options still outstanding. Completes the issue announced in March.

Discuss in chat

18 Apr 2006well test result▲ Good

Cooper reports Christies-5 reached 1,853 m; tests flowed 85 bopd (Birkhead) and 318 bopd (Namur) with water. The well was cased as a producer and the rig moved to Silver Sands. Beach operates with 75%.

Discuss in chat

18 Apr 2006admin correction● Neutral

Beach clarifies that its 60c options do not expire until 30 June 2006; about 23 million remain and can still be converted. Clarifies the 13 April release; no new information.

Discuss in chat

18 Apr 2006drilling result● Neutral

Stuart reports Harpoono #3 reached 1490 m; the first Murta test recovered water with a trace of oil. The well defines the eastern edge of the McKinlay oil pool found in Harpoono-2. Second test to follow; Beach holds 33%.

Value this in the calculator →Discuss in chat

13 Apr 2006capital raising announcement▲ GoodMajor

About 57 million of 80 million 60c options were exercised, raising over A$38m for Beach; shares on issue rise to 508.5m. About 23m 60c options remain to 30 June, plus 50m new $1.00 bonus options. Full conversion would add $64m by 30 Sept.

Discuss in chat

12 Apr 2006drilling spud● Neutral

Stuart reports Harpoono #3 spudded 11 April and is drilling surface hole at 81 m, targeting Murta and McKinlay oil to 1480 m. Beach holds 33%. Follow-up to the Harpoono-2 discovery; no result yet.

Value this in the calculator →Discuss in chat

11 Apr 2006production update● Neutral

Anzon reports Basker-3 at 2915 m and Basker-5 cased awaiting completion. Basker-2 made 183,077 bbl in March (5905 bopd), cumulative 757,316 bbl; its extended test runs to 14 May. Crystal Ocean then sails to Singapore for a gas compressor.

Discuss in chat

11 Apr 2006drilling progress report● Neutral

Beach weekly report: Christies-5 at 1647 m nearing total depth; Harpoono-3 about to spud; Basker-3 drilled to 2915 m; Tipton West wells progressing (four of 85 done). Repeats known activity, no new result.

Value this in the calculator →Discuss in chat

11 Apr 2006drilling progress report● Neutral

Cooper reports Christies-5 at 1,742 m, with Top Hutton at 1,637 m and fluorescence in the Birkhead target. Total depth of 1840 m expected that day, then logging. No test result yet.

Value this in the calculator →Discuss in chat

11 Apr 2006other● Neutral

Bow Energy, Beach's Hunt Rig #2 sharing partner, won 100% of Queensland permit ATP 809P and plans Banff-1 on the rig, spud June 2006. Third-party news; no direct change to Beach's interests.

Discuss in chat

10 Apr 2006drilling progress report● Neutral

Cooper reports Christies-5 repaired and drilling resumed on 9 April, now at 1,468 m. Namur showed good oil fluorescence; total depth about 1850 m is expected in two days.

Value this in the calculator →Discuss in chat

5 Apr 2006drilling progress report▼ Bad

Cooper reports Christies-5 drilling suspended at 1376 m after a rig hoisting-system fault, awaiting repairs and safety inspection. The Namur was reached as expected. A delay, not a result.

Value this in the calculator →Discuss in chat

4 Apr 2006drilling result▲ Good

Stuart reports the Harpoono 2 Murta test flowed 240 bopd. The well will be cased as a dual McKinlay and Murta oil producer and tied into existing facilities. Final drilling report; Beach holds 33.33%.

Value this in the calculator →Discuss in chat

4 Apr 2006drilling progress report● Neutral

Beach weekly report: Christies-5 at 1270 m; Harpoono-2 discovery and dual completion; Basker-5 cased and suspended, Basker-3 at 1163 m; two more Tipton West wells completed. Repeats known results.

Value this in the calculator →Discuss in chat