Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

13 Oct 2006security holder rights change● Neutral

Beach's subsidiary Delhi Holdings lodged a prospectus offering new shares at A$0.90 (up to A$85.1m) to FIELDS holders, closing 11 December. It follows the Delhi acquisition. Prospectus warns the unlisted shares are illiquid and the price exceeds net tangible assets per share.

Discuss in chat

13 Oct 2006capital raising announcement▲ GoodMajor

Beach says 97% of its last 50.6 million options were exercised, adding A$49m of working capital. Shares on issue are now about 664 million. The A$247m rights issue at A$1.39 for the Delhi acquisition is still to come.

Discuss in chat

13 Oct 2006dividend declaration● Neutral

Beach sets the dividend reinvestment plan discount at 5% for the 2006 final dividend (1.0c), giving a share issue price of A$1.320375. Confirms the previously announced discount.

Discuss in chat

12 Oct 2006drilling progress report● Neutral

Magellan (30% partner) reports Kiana-2 at 1,962 m in basement on 11 October, with logging and possible testing to follow. Repeats known information.

Value this in the calculator →Discuss in chat

12 Oct 2006investor presentation● Neutral

Beach presents at a Karratha conference, repeating known points: the A$590m Delhi acquisition (~21% of Cooper Basin JVs), FY06 profit of A$44m, Basker-Manta start in early November, and Tipton West first gas in early 2007. Also lists Hurricane-2 (10%) for Q2 2007.

Discuss in chat

11 Oct 2006drilling progress report▲ Good

Champagne Creek 2 reached 2,633 m. Logs show a zone of interest in the Clematis Sandstone, and a drill stem test is planned for 12 October. Beach holds the 50% earn-in option.

Value this in the calculator →Discuss in chat

11 Oct 2006security holder rights change● Neutral

Beach reports 1,646,220 of its 2006 bonus options expired unexercised on 30 September. Issued capital is 663,649,067 ordinary shares, before the rights issue.

Discuss in chat

11 Oct 2006drilling progress report● Neutral

Kiana-2 is at 1,962 m, drilling in basement. About 30 m more is planned, then logging to pick sandstones for possible testing. No results yet.

Value this in the calculator →Discuss in chat

11 Oct 2006drilling progress report● Neutral

Weekly report: Kiana-2 was at 1,968 m drilling in basement, and the Glenaire-1 sidetrack was at 3,119 m awaiting rig repairs. Champagne Creek-2 reached 2,633 m and was preparing a test. Yanda-17's first test was a misrun from packer damage and the well was suspended. Cutter-1 was at 131 m setting the surface conductor.

Value this in the calculator →Discuss in chat

10 Oct 2006drilling spud● NeutralMajor

Beach confirms Cutter-1, a high-risk offshore well in New Zealand's Canterbury Basin, spudded 9 October. It targets ~70-80 million barrels of oil at about 3,000 m, with Beach holding 20%, a first result due in about 30 days.

Value this in the calculator →Discuss in chat

10 Oct 2006drilling spud● Neutral

AWE says Cutter-1 spudded 9 October in New Zealand's Canterbury Basin, targeting 70-80 million barrels of oil to about 3,000 m in ~30 days. Beach holds 20% in the PEP 38259 permit. Repeats the partner-side news of the spud.

Value this in the calculator →Discuss in chat

10 Oct 2006drilling spud● Neutral

Anzon confirms Cutter-1 spudded, targeting 70-80 million barrels. Anzon is earning its 15% by funding part of the well; Beach holds 20%. Repeats known information.

Value this in the calculator →Discuss in chat

10 Oct 2006drilling spud● Neutral

Operator Tap Oil confirms Cutter-1 spudded 9 October; the rig is on location and a pilot hole is drilled to 538 m. Target about 3,000 m in roughly 30 days. Beach holds 20%.

Value this in the calculator →Discuss in chat

9 Oct 2006drilling progress report● Neutral

Sunshine Gas reports Champagne Creek 2 drilling at 2,630 m in Triassic sediments, near the 2,700 m planned depth. Beach has the option to earn 50% after the well.

Value this in the calculator →Discuss in chat

4 Oct 2006drilling progress report▼ Bad

Weekly report: Glenaire-1 plugged back to 3,028 m and preparing to sidetrack due to deviation problems. Kiana-2 at 788 m; Champagne Creek at 2,505 m; Cutter-1 not yet drilling; Tipton West wells continuing.

Value this in the calculator →Discuss in chat

4 Oct 2006drilling progress report● Neutral

Great Artesian reports Kiana-2 at 788 m, preparing to cement surface casing. No results yet; repeats known well details (Beach 40% operator, 520,000-870,000 barrels potential).

Value this in the calculator →Discuss in chat

4 Oct 2006drilling progress report▲ Good

Sunshine Gas says Champagne Creek 2 is at 2,505 m, about 500 m below the original depth, with encouraging gas shows in the Triassic. A planned sidetrack was abandoned after equipment failure. Beach retains its option to earn 50% after the well.

Value this in the calculator →Discuss in chat

3 Oct 2006capital raising announcement● NeutralMajor

Beach lodged the prospectus for its 2-for-7 renounceable rights issue at A$1.39, raising about A$247m from ~178m new shares, underwritten by Euroz and CommSec. Closes 31 Oct; proceeds repay part of the debt used for the Delhi acquisition.

Discuss in chat

3 Oct 2006other● Neutral

Administrative notice: Beach's weekly drilling report moves from Tuesdays to Wednesdays, starting 4 October 2006. No operational substance.

Discuss in chat

3 Oct 2006drilling progress report● Neutral

Magellan (30% partner) confirms Kiana-2 spudded 1 October and was at 307 m, with about 14 days to drill and evaluate. Kiana-1 had produced over 81,000 barrels to end August. Repeats known information.

Value this in the calculator →Discuss in chat

2 Oct 2006drilling spud● Neutral

Kiana-2 appraisal well spudded 1 October and is at 307 m after a bit change at 157 m. It is the first of five back-to-back wells in PEL 107 (Beach 40% operator).

Value this in the calculator →Discuss in chat

29 Sept 2006drilling scheduled● Neutral

Great Artesian says Kiana-2 (Beach 40% operator) will spud around 30 September to 1 October to 2,020 m, appraising a sub-culmination with 520,000-870,000 barrels potential. Kiana-1 currently flows about 400 bopd, below the 443 bopd earlier reported.

Value this in the calculator →Discuss in chat

28 Sept 2006production update▼ BadMajor

Anzon reports the Basker manifold installed, but the FPSO Crystal Ocean is still in Singapore. It is now expected back in the first week of November, with full 25,000 bopd production later that month. This pushes back the mid-October start previously expected.

Discuss in chat

26 Sept 2006drilling result▼ BadMajor

Somerton-1 reached 1,835 m with no shows in the Birkhead, Hutton or Poolowanna, and logs show all objectives water-bearing. It will be plugged and abandoned. A second dry hole in PEL 92 after Snowden-1 (Beach 75%, Cooper 25%).

Value this in the calculator →Discuss in chat