15 Nov 2006drilling result▼ BadMajor
Keeley-1 will be plugged and abandoned on Beach's recommendation after logs and side-wall cores. It was a dud for the 40% operator against a roughly 10 Bcf mean prospect. The rig moves to Talia-1, an oil prospect, starting late this week.
Beach weekly report: Keeley-1 is running abandonment plugs after two tight tests. Yanda-23 was cased as a Murta oil producer. Cutter-1 is plugged and abandoned. Might and Power-1 is completed. Rising Fast-1 is at 605 m.
Stuart spudded Rising Fast 1 in PEL 113 on 13 November, planned depth 1,550 m, now at 125 m. Beach holds 33.3%. Follows Might and Power 1 in the same permit; no result yet.
Beach books gross proved and probable sales gas reserves of 6.3 PJ at Middleton and 3.4 PJ at Udacha, from extended testing. Development needs gas sales or access deals. A 180 sq km 3D seismic survey is planned for early 2007.
Press release says Beach's market value now exceeds A$1 billion after the A$247m rights issue, with about 790 million shares on issue. Restates FY06 profit of A$43.99m and the A$590m Delhi purchase; no new operating news.
Great Artesian repeats that Keeley-1 reached 3,059 m and is running wireline logs, with elevated gas and fluorescence in some sands still being assessed. Beach operates with 40%. Repeats known facts.
Keeley-1 reached 3,059 m, deeper than planned. A second test (2,978-2,996.5 m) found the zone tight, with no flow. Gas readings and fluorescence in other sands will be assessed by logs. Beach operates with 40%.
Great Artesian reports Keeley-1 at 2,982 m, drilling ahead after a wiper trip following the aborted test. Planned depth is 3,023 m. Beach operates with 40%. No new result.
Keeley-1's first drill stem test (2,941-2,968 m) was aborted for mechanical reasons, but indicated the zone has low permeability. Drilling continues toward 3,023 m. Beach operates with 40%. A discouraging early sign.
Anzon repeats that Cutter-1 reached 2,930 m, with water-wet primary sandstones and poor-quality shallow gas sands not commercially significant. The well is being plugged and abandoned. Beach holds 20%. Repeats the Tap and AWE announcements.
Magellan's weekly report puts Keeley-1 at 2,968 m on 8 November and says its first test failed for mechanical problems. Magellan earns 30% only on a commercial discovery; Beach operates with 40%. Repeats known facts.
Beach weekly report: Cutter-1 at 2,930 m with water-wet sands, being abandoned; Byrock-2, Glenaire-1ST1 and Pasticcio-1 cased and suspended; Might and Power-1 cementing casing after one 2-barrel oil recovery; Keeley-1 at 2,968 m preparing a test.
Tap confirms Cutter-1 was water wet in the main Shag Point sandstones; the shallow gas shows are not likely to be economic at Cutter. The well will be plugged and abandoned. Beach holds 20%. Tap will study the Barque prospect.
Keeley-1 reached 2,968 m and a drill stem test of the lower Patchawarra (2,941-2,968 m) was about to start, after a sand showed fluorescence, elevated gas and reasonable porosity. Beach operates with 40%. Result pending.
Great Artesian reports Keeley-1 at 2,953 m, still drilling in the Patchawarra with elevated gas readings noted in several sands. Beach operates with 40%. No test result yet.
Beach clarifies in response to shareholder enquiries that proved and probable reserves at 1 July 2006 were 101.0 mmboe (Cooper/Eromanga 69.8, Gippsland 19.6, Surat 11.7). A further 36 mmboe Basker-Manta-Gummy contingent resource needs a gas contract and development approval.
Cutter-1 reached target depth: the main Shag Point sands were water wet, with gas shows in shallower rocks. A disappointment against the earlier 70-80 mmbbl potential; Tap sees implications for the nearby Barque prospect. Beach holds 20%.
AWE confirms Cutter-1 reached 2,930 m with water-wet primary sands. Shallow gas shows have poor reservoir quality and are unlikely to be commercially significant. Beach holds 20%. The rig moves to Taranaki.
6 Nov 2006capital raising announcement● NeutralMajor
Beach's 2-for-7 rights issue (about A$247m, A$1.39 per share) left a shortfall of 50,069,714 shares, with about 72% of rights taken up. The underwriters cover the shortfall. This completes the funding for the Delhi acquisition debt paydown.
Great Artesian reports Keeley-1 at 2,876 m, with several Patchawarra sands showing elevated gas readings to be assessed after logging. Beach operates with 40%. Encouraging signs only, not a confirmed result.
Might and Power 1: a McKinlay test recovered 2 barrels of oil; other Murta tests were misruns. Casing will be run for possible completion as an oil well, with the Murta evaluated later. Beach holds 33.3%. Modest result, not yet a commercial discovery.
Great Artesian reports Keeley-1 drilling ahead at 2,640 m in the Patchawarra Formation toward planned 3,023 m. Beach operates with 40%. No results yet.
Byrock-2 (Beach 46.95% operator) flowed 10 barrels of oil with no water from the Toolachee Formation, confirming an oil discovery. Byrock-1 found oil in the same formation in 1986. The well will be cased as a future producer.
Stuart now says Might and Power 1's second test was a misrun and the first Murta test is considered invalid, so the Murta will be retested. A McKinlay test follows. Beach holds 33.3%. Still no valid result.
Great Artesian reports Keeley-1 drilling ahead at 2,513 m in the Patchawarra Formation toward planned 3,023 m. Beach operates with 40%. No results yet.
Magellan's weekly report repeats Keeley-1 at 2,425 m on 1 November, with a 10 Bcf best-estimate and 29 Bcf high-estimate prospect. Magellan earns 30% only if commercial; Beach operates with 40%. No new information.
Stuart reports the first drill stem test at Might and Power 1 (Murta, 1,158-1,168.5 m) recovered no hydrocarbons, a setback after earlier oil shows. A second test in the McKinlay is being prepared. Beach holds 33.3%.
Might and Power 1 has run logs at 1,507 m and is preparing a drill stem test of 1,158-1,168.5 m in the Murta Member. Follows earlier oil shows. Beach holds 33.3%. No test result yet.
Great Artesian reports Keeley-1 at 2,425 m in the Patchawarra Formation, the main gas target, changing drill bit. Planned depth 3,023 m; Beach operates with 40%. No result yet.