Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

31 July 2007quarterly activities report● Neutral

Beach's June quarter media release reported sales of 2.5 mmboe and revenue of $125m, with sales revenue of $93.03m. FY07 sales were 10.55 mmboe, 2P reserves were 93.4 mmboe, and Cooper/Eromanga oil reserves rose to 12.3 mmb.

Discuss in chat

31 July 2007quarterly activities report● NeutralMajor

June quarter: sales 2.54 mmboe, revenue A$125.3m; FY07 revenue A$472.2m, up from A$124m. 2P reserves were reassessed at 93.4 mmboe at 30 June 2007, down from 101 mmboe a year earlier, though Cooper oil reserves rose 1.0 mmb to 12.3 mmb.

Discuss in chat

27 July 2007investor presentation● Neutral

Beach's July 2007 corporate presentation restates known facts: 2P reserves of 101 mmboe at 1 July 2006, more than 65 mmboe upside over 3-5 years, FY07 production around 10 mmboe, and the Cooper Oil Project plan of 100+ wells. No new information.

Discuss in chat

26 July 2007drilling progress report● Neutral

Drillsearch reports Naccowlah West 20 (Beach 38.5%) cased and suspended for future testing after Hutton oil shows, and Naccowlah West 21 spudded with Murta oil shows. Talgeberry 20 is in the Tintaburra block, not a Beach block.

Value this in the calculator →Discuss in chat

25 July 2007drilling result▼ BadMajor

Beach confirms Hurricane-2 (10%) found about 9 m net oil pay, an 18 m gross column, too small to develop now, and will be plugged and abandoned. Warragon-1's Toolachee test misran and it will be cased for testing. Beach declined to join Naccowlah West-20.

Value this in the calculator →Discuss in chat

25 July 2007contract award● NeutralMajor

The Basker-Manta JV (Beach 50%) contracted the Havila Harmony vessel to repair the mooring, mobilising mid-September, with full production back late September/early October. It also secured the Kan Tan IV rig for 135 days from mid-2008, in addition to Basker-6 in Q1 2008.

Discuss in chat

23 July 2007drilling result● NeutralMajor

Hurricane-2 (Beach 10%) found about 20 m gross oil column (about 10 m net pay, 30 API) and is classed a new field discovery. Mosaic's MD says it is unlikely to be commercial stand-alone now. Falls well short of the 16-40 MMB hoped for.

Value this in the calculator →Discuss in chat

19 July 2007drilling progress report● Neutral

Mosaic reports Hurricane-2 (Beach 10%) reached total depth of 3,253 m. Hydrocarbon shows in the main reservoir are being evaluated by wireline logging; no result yet.

Value this in the calculator →Discuss in chat

18 July 2007drilling progress report▲ Good

Beach weekly report: Warragon-1 (46.95%) reached 1,996 m with Toolachee hydrocarbon shows and is under drill stem test. Hurricane-2 also shows hydrocarbons in its primary target. Mudlalee-4 is cased for completion.

Value this in the calculator →Discuss in chat

17 July 2007drilling progress report▲ Good

Mosaic reports Hurricane-2 (Beach 10%) hit the Eliassen reservoir near prognosis at 3,206 m, with elevated gas readings and up to 80% hydrocarbon fluorescence. Significance awaits logging; planned depth is about 3,280 m.

Value this in the calculator →Discuss in chat

12 July 2007drilling progress report● Neutral

Mosaic reports Hurricane-2 (Beach 10%) is cementing casing at 2,169 m and about to reach its Eliassen target. Hurricane is described as having 40-50 million barrels of recoverable oil potential. No new result yet.

Value this in the calculator →Discuss in chat

11 July 2007drilling progress report▲ Good

Beach reports three successful Cooper Oil Project wells: Naccowlah South-15, Gambero-1 (12 m oil column) and Mudlalee-4 (15 m column). Program total is 38 wells at 76% success, with wells due online in August. Warragon-1 is drilling; Hurricane-2 nears its 3,280 m target.

Value this in the calculator →Discuss in chat

11 July 2007production update▼ BadMajor

The Basker-Manta mooring failure was a dislodged shackle pin; the mooring is otherwise sound. A specialist vessel is expected in late August. Meanwhile ship-to-ship shuttling should hold about 3,000 bopd, well below full capacity. Follows the 5 July mooring failure.

Discuss in chat

6 July 2007production update▼ BadMajor

Basker-Manta (Beach 50%) vessels reconnected 5 July, but the Basker Spirit's single point mooring parted that evening and the tanker drifted. No injuries or spill. Production is expected to be curtailed for weeks; business interruption insurance is available.

Discuss in chat

6 July 2007director officer appointment● Neutral

Glenn Davis, a lawyer experienced in capital raisings and listing rules, and Dr Neville Alley, previously an alternate director, are appointed to Beach's board from 6 July 2007.

Discuss in chat

6 July 2007drilling spud● Neutral

Entek reports Warragon-1 (ATP 269P, Beach 46.95% operator) spudded 5 July, the third and final well of the program. Planned depth is 1,992 m, with a mean 1.33 MMB Basal Jurassic oil target, after the Marcoola-1 discovery.

Value this in the calculator →Discuss in chat

4 July 2007other● Neutral

Red Sky Energy (ROG), listed 23 May 2007 after a $6m raise, profiles itself as a junior explorer with farm-ins from Beach and others. It lists four leads in Beach's PEL 110. Beach is only a counterparty; nothing new for Beach.

Discuss in chat

4 July 2007drilling progress report● Neutral

Beach weekly report: Marcoola 1 (46.95%) is cased and suspended as a potential oil producer at 1,349 m after two test recoveries (6 bbl and 2 bbl oil). Big Lake 84 and Hurricane 2 continue drilling.

Value this in the calculator →Discuss in chat

2 July 2007drilling result▲ Good

Entek reports Marcoola-1 (Beach 46.95% operator) recovered oil on a second test in the Murta (about 2.4 bbl), after the Hutton misrun. The well is cased and suspended pending a completion plan. Warragon-1 is next, with a 1.33 MMB mean target.

Value this in the calculator →Discuss in chat

28 June 2007production update▼ Bad

Basker-Manta-Gummy (Beach 50%) production resumed after the Manta swivel was corrected. Severe 7 m seas then forced both production vessels to disconnect from their moorings, with reconnection expected that Sunday. This is the first such weather disconnection in over 12 months.

Discuss in chat

28 June 2007drilling result▲ Good

Drillsearch reports Naccowlah South 16 (Beach 38.5%) found Hutton oil pay and was cased and suspended as a future oil producer, a Cooper Oil Program success. Talgeberry 19 in Tintaburra is not a Beach block.

Value this in the calculator →Discuss in chat

27 June 2007drilling progress report● Neutral

Beach weekly report: Marcoola 1 is pulling test tools after the misrun Hutton test (6 bbl oil, no water). Naccowlah South 16 is being cased as an oil producer. Hurricane 2 has stuck pipe at 153 m, and Tipton-128 is on weather standby.

Value this in the calculator →Discuss in chat

27 June 2007drilling result▲ GoodMajor

Beach announces Marcoola-1 (ATP 269P, Beach 46.95% operator) as a new field oil discovery. A Hutton test recovered 6 barrels of oil with no water before the packers failed. It is a first success after the dry Nudgee-1, but flow rates are not yet known.

Value this in the calculator →Discuss in chat

26 June 2007drilling result▲ Good

Entek reports Marcoola-1 (ATP 269P, Beach 46.95% operator) reached 1,348 m with multiple oil shows, including 50-100% fluorescence at the basal Birkhead and Hutton. Logging and testing follow. This is encouraging after the dry Nudgee-1.

Value this in the calculator →Discuss in chat

26 June 2007material agreement termination▼ BadMajor

The Basker-Manta-Gummy JV (Beach 50%) deferred the gas-phase investment decision, so the 15-year Alinta gas sales agreement of 16 March lapses. Oil expansion continues, with Basker-6 scheduled for Q1 2008. A gas commitment is expected within 12 months. This reverses the Q2 2007 gas plan.

Discuss in chat

26 June 2007material agreement termination▼ Bad

Anzon's cover release of the same joint announcement: the Basker-Manta-Gummy gas decision is deferred and the Alinta gas agreement lapses. Oil expansion continues, with Basker-6 in Q1 2008. It duplicates Beach's release.

Discuss in chat

26 June 2007material agreement termination▼ Bad

Alinta says the lapse of the Basker-Manta-Gummy gas agreement, on 28 June, is a significant setback to its proposed 200 MW Tamar Valley power station in Tasmania. It is assessing staging the project or deferring it. It confirms the effect on Beach's gas customer.

Discuss in chat

25 June 2007drilling spud● NeutralMajor

Beach reports Hurricane-2 spudded 24 June in WA-208-P, offshore Carnarvon Basin, testing for an oil leg beneath the Hurricane-1 gas discovery of 2005. Beach holds 10%. The mean prospect is 16 million barrels gross, with a 40 million barrel high side. Drilling is expected to take about 15 days.

Value this in the calculator →Discuss in chat

20 June 2007drilling progress report● Neutral

Beach's weekly report showed Nudgee 1 plugged and abandoned and Marcoola 1 drilling surface hole at 130 m. Bodalla South 17 was completed at an initial 882 bopd with 4% water cut, with a pump due next week. Moomba 178 and Big Lake 85 were cased as potential gas producers.

Value this in the calculator →Discuss in chat

18 June 2007drilling result▼ Bad

Entek reports Nudgee-1 (ATP 269P, Beach 46.95%), the first of three exploration wells, was plugged and abandoned after logging. The rig moved to Marcoola-1, expected to spud 19 June.

Value this in the calculator →Discuss in chat