Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

30 June 2008production update▲ GoodMajor

Preliminary FY08 Cooper/Eromanga oil production hit a record 2.0 mmb (+18%), and oil reserves rose 27% to above 15 mmb. Beach also says Arrow expects a substantial Tipton West 2P gas reserve increase in the September quarter.

Discuss in chat

30 June 2008other● Neutral

Beach told Great Artesian it will vote its 29m shares (about 15.77%) for the Drillsearch merger, absent a superior proposal. The vote is on 28 July 2008. This resolves Beach's stance on its Great Artesian holding.

Discuss in chat

27 June 2008asset acquisition disposition▲ GoodMajor

BP has waived its pre-emptive rights over Beach's US$110m purchase of 20% of North Shadwan. The deal still needs Egyptian government approval and an EGPC pre-emption waiver. Removes one hurdle noted in the 30 May announcement.

Discuss in chat

25 June 2008drilling progress report● Neutral

Weekly report: Santos-operated Big Lake-87 (Beach 20.21%) was cased and suspended as a future Hutton oil producer. Granchio-3 is drilling, and rain slowed operations early in the week.

Value this in the calculator →Discuss in chat

23 June 2008security holder rights change● Neutral

Share purchase plan application form: eligible holders can buy A$1,001 to about A$5,000 of shares at A$1.43, with applications closing 18 July 2008. Administrative document for the previously announced offer.

Discuss in chat

18 June 2008joint venture update● Neutral

Great Artesian announced about 137 sq km of 3D seismic in PEL 91 (Beach 40% operator, Great Artesian 60%), part of the Modiolus 3D survey with PEL 92. It follows the dry Ballaparudda-1 and Murrippi-1 wells and aims to find new drilling targets.

Discuss in chat

18 June 2008drilling progress report▲ Good

Parsons-1 (Beach 75%) began free-flow production on 16 June at a stabilised 2,640 bopd, in line with the expected start-up. Santos-operated Mama-1 was a successful well and is being cased; Big Lake-87 is drilling.

Value this in the calculator →Discuss in chat

13 June 2008security holder rights change● Neutral

Beach confirmed the 133,637,474 placement shares are now issued, with the standard compliance notice. Shares on issue are now 1,024,553,970. Administrative step completing the A$191m raising.

Discuss in chat

11 June 2008drilling progress report● Neutral

Weekly report: Santos-operated Mama-1 (Beach 20.21%) is drilling out cement at 542 m. Cowralli-9 was cased and suspended as a future gas producer, and Tipton CSG drilling continues.

Value this in the calculator →Discuss in chat

6 June 2008capital raising announcement▲ GoodMajor

Beach completed its oversubscribed placement: 133,637,474 shares at A$1.43 raised A$191m. Eligible holders on the 16 June record date can buy up to A$5,000 of shares at the same price, and a 1-for-10 bonus option issue at A$2.00 follows.

Discuss in chat

6 June 2008capital raising announcement▲ Good

Media release on the completed placement: 133,637,474 shares at A$1.43 raised A$191m, to fund the three Egyptian acquisitions (about A$150m including development; potential 8 mmb net 2P in FY09). Repeats the 6 June raising news; BP pre-emption expires 28 June.

What it means for a shareholder

134m new shares at A$1.43 to raise about A$191m. That's 13% dilution: every existing holder's slice gets 13% smaller. If you held A$1,000 of shares (699 at the issue price), your slice goes from 0.0000785% to 0.0000683% of the company. To keep it you'd need 105 more shares - about A$150 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

4 June 2008drilling progress report● Neutral

Weekly report: Mitchie-2 (Santos-operated, Beach 20.21%) was cased and suspended for completion as a Tirrawarra oil and Patchawarra/Toolachee gas well. Mia-1 is preparing to plug and abandon. Tipton CSG work was on wet weather standby.

Value this in the calculator →Discuss in chat

4 June 2008listing compliance notice● Neutral

Beach requested a trading suspension pending announcement of the capital raising, with trading expected to resume by 6 June 2008. This is a procedural step in the placement.

Discuss in chat

2 June 2008capital raising announcement● NeutralMajor

Beach announced a roughly A$190m placement to fully fund its three Egyptian acquisitions, about A$150m including development costs, plus a share purchase plan (up to A$5,000 each) and a 1-for-10 bonus options issue at A$2.00. Other Middle East/North Africa deals are being evaluated.

Discuss in chat

2 June 2008investor presentation● Neutral

Roadshow presentation for the raising: 133.6m shares at A$1.43. It covers uses of proceeds (about A$135m for North Shadwan, A$55m for other Egypt interests) and an FY08 production estimate of 9.3 mmboe. Mostly repeats the capital raising announcement.

Discuss in chat

30 May 2008asset acquisition disposition▲ GoodMajor

Beach agreed to buy a 20% interest in the North Shadwan concession (Gulf of Suez) from Tri-Ocean for US$110m. It holds three undeveloped discoveries with about 40 million barrels of proved and probable reserves. Subject to pre-emption waivers and Egyptian approval, up to about six months.

Discuss in chat

28 May 2008drilling result▼ Bad

Weekly report: Glenaire-1 ST1 (PEP 160, Beach 50% operator) was plugged and abandoned with subcommercial oil. Mitchie-2 and Cowralli-9 (Santos-operated, Beach 20.21%) continue.

Value this in the calculator →Discuss in chat

22 May 2008drilling result▲ Good

Bodalla South-19 and -20 (Beach 100%) succeeded, and Bodalla South-20 was cased as a future oil producer. Tipton West CSG produces about 20 TJ/day (Beach 40%). The report also restates the Tanzania and Basker-6 news.

Value this in the calculator →Discuss in chat

22 May 2008farm in farm out agreement▲ GoodMajor

Beach agreed with Santos Egypt to farm in for 20% of the South East July concession (Gulf of Suez), with a July South-1 well in Q4 2008. It will also buy Santos's 25% of onshore North Qarun. Both need Egyptian approvals; Beach's first Egypt entry.

Value this in the calculator →Discuss in chat

15 May 2008regulatory community update● Neutral

Update on the three-year Save the Children youth program in remote South Australian communities, funded by Beach's A$600,000 grant. A coordinator is hired and groundwork is under way; no financial or operational impact.

Discuss in chat

14 May 2008drilling progress report● Neutral

Weekly report: Bodalla South-20 (Beach 100%) is drilling ahead at 1,284 m. Santos-operated Cook-14 and Bindah-2 are being cased and suspended as future oil producers.

Value this in the calculator →Discuss in chat

13 May 2008regulatory community update● Neutral

Media release repeating the Tanzania Lake Tanganyika South Block news, with Reg Nelson citing oil seeps and similarity to Ugandan discoveries. Describes it as Beach's first move into Africa; a production sharing agreement must still be negotiated.

Discuss in chat

13 May 2008regulatory community update▲ GoodMajor

Beach won exclusive rights, after a contested tender, to negotiate a production sharing agreement to explore the southern half of Lake Tanganyika, Tanzania (about 5,400 sq km). It is Beach's first Africa move; no work can start until terms are agreed.

Discuss in chat

7 May 2008drilling result▲ Good

Bodalla South-19 (Beach 100%) is being cased as a future oil producer. Basker-6 ST1 flowed 3,980-4,800 bopd per zone, with production expected in the third quarter of 2008.

Value this in the calculator →Discuss in chat

6 May 2008well test result▲ GoodMajor

Basker 6 ST1's third and final test over zones 2 and 7 flowed a stable 4,800 bpd with zero water, bringing the three zones to nearly 13,000 bpd, far above what the JV expected. Anzon said this supported a south-eastern field extension, with the well to be connected in July 2008.

Discuss in chat

2 May 2008drilling progress report▲ Good

Anzon reports the Basker 6 ST1 completion and subsea tree are installed and tested. Cleanup flow tests on each zone are due over the weekend, then the well is suspended awaiting tie-back to the Crystal Ocean FPSO.

Value this in the calculator →Discuss in chat

30 Apr 2008production update▲ Good

Anzon reports the BMG joint venture sold about 570,000 bbl of crude at an expected value above US$118/bbl, and marked a year of operations without lost-time incidents. Beach holds 30%.

Discuss in chat

30 Apr 2008drilling progress report● Neutral

Weekly report: Bodalla South-19 (Beach 100%) spudded 30 April, and Santos-operated McKinlay-9 (Beach 20.21%) was a success. No major new result.

Value this in the calculator →Discuss in chat

28 Apr 2008asset acquisition disposition▲ GoodMajor

Beach completed the sale of 10% of the BMG joint venture to Sojitz, receiving A$123m on 24 April 2008. Beach retains 30%. Regulatory approval is still required. This is the second such A$123m sale, after Itochu's in October 2007.

Discuss in chat

28 Apr 2008drilling progress report● Neutral

Anzon reports Basker 6 ST1 has been perforated in four sands with a three-packer completion. Cleanup flow testing awaits better weather, then it will be tied to the Crystal Ocean FPSO in mid July.

Value this in the calculator →Discuss in chat