Each one in plain English, with the numbers worked through for a shareholder.
30 June 2008production update▲ GoodMajor
Preliminary FY08 Cooper/Eromanga oil production hit a record 2.0 mmb (+18%), and oil reserves rose 27% to above 15 mmb. Beach also says Arrow expects a substantial Tipton West 2P gas reserve increase in the September quarter.
Beach told Great Artesian it will vote its 29m shares (about 15.77%) for the Drillsearch merger, absent a superior proposal. The vote is on 28 July 2008. This resolves Beach's stance on its Great Artesian holding.
27 June 2008asset acquisition disposition▲ GoodMajor
BP has waived its pre-emptive rights over Beach's US$110m purchase of 20% of North Shadwan. The deal still needs Egyptian government approval and an EGPC pre-emption waiver. Removes one hurdle noted in the 30 May announcement.
Weekly report: Santos-operated Big Lake-87 (Beach 20.21%) was cased and suspended as a future Hutton oil producer. Granchio-3 is drilling, and rain slowed operations early in the week.
23 June 2008security holder rights change● Neutral
Share purchase plan application form: eligible holders can buy A$1,001 to about A$5,000 of shares at A$1.43, with applications closing 18 July 2008. Administrative document for the previously announced offer.
Great Artesian announced about 137 sq km of 3D seismic in PEL 91 (Beach 40% operator, Great Artesian 60%), part of the Modiolus 3D survey with PEL 92. It follows the dry Ballaparudda-1 and Murrippi-1 wells and aims to find new drilling targets.
Parsons-1 (Beach 75%) began free-flow production on 16 June at a stabilised 2,640 bopd, in line with the expected start-up. Santos-operated Mama-1 was a successful well and is being cased; Big Lake-87 is drilling.
13 June 2008security holder rights change● Neutral
Beach confirmed the 133,637,474 placement shares are now issued, with the standard compliance notice. Shares on issue are now 1,024,553,970. Administrative step completing the A$191m raising.
Weekly report: Santos-operated Mama-1 (Beach 20.21%) is drilling out cement at 542 m. Cowralli-9 was cased and suspended as a future gas producer, and Tipton CSG drilling continues.
6 June 2008capital raising announcement▲ GoodMajor
Beach completed its oversubscribed placement: 133,637,474 shares at A$1.43 raised A$191m. Eligible holders on the 16 June record date can buy up to A$5,000 of shares at the same price, and a 1-for-10 bonus option issue at A$2.00 follows.
Media release on the completed placement: 133,637,474 shares at A$1.43 raised A$191m, to fund the three Egyptian acquisitions (about A$150m including development; potential 8 mmb net 2P in FY09). Repeats the 6 June raising news; BP pre-emption expires 28 June.
What it means for a shareholder
134m new shares at A$1.43 to raise about A$191m. That's 13% dilution: every existing holder's slice gets 13% smaller. If you held A$1,000 of shares (699 at the issue price), your slice goes from 0.0000785% to 0.0000683% of the company. To keep it you'd need 105 more shares - about A$150 at the issue price.
Weekly report: Mitchie-2 (Santos-operated, Beach 20.21%) was cased and suspended for completion as a Tirrawarra oil and Patchawarra/Toolachee gas well. Mia-1 is preparing to plug and abandon. Tipton CSG work was on wet weather standby.
Beach requested a trading suspension pending announcement of the capital raising, with trading expected to resume by 6 June 2008. This is a procedural step in the placement.
2 June 2008capital raising announcement● NeutralMajor
Beach announced a roughly A$190m placement to fully fund its three Egyptian acquisitions, about A$150m including development costs, plus a share purchase plan (up to A$5,000 each) and a 1-for-10 bonus options issue at A$2.00. Other Middle East/North Africa deals are being evaluated.
Roadshow presentation for the raising: 133.6m shares at A$1.43. It covers uses of proceeds (about A$135m for North Shadwan, A$55m for other Egypt interests) and an FY08 production estimate of 9.3 mmboe. Mostly repeats the capital raising announcement.
30 May 2008asset acquisition disposition▲ GoodMajor
Beach agreed to buy a 20% interest in the North Shadwan concession (Gulf of Suez) from Tri-Ocean for US$110m. It holds three undeveloped discoveries with about 40 million barrels of proved and probable reserves. Subject to pre-emption waivers and Egyptian approval, up to about six months.
Bodalla South-19 and -20 (Beach 100%) succeeded, and Bodalla South-20 was cased as a future oil producer. Tipton West CSG produces about 20 TJ/day (Beach 40%). The report also restates the Tanzania and Basker-6 news.
Beach agreed with Santos Egypt to farm in for 20% of the South East July concession (Gulf of Suez), with a July South-1 well in Q4 2008. It will also buy Santos's 25% of onshore North Qarun. Both need Egyptian approvals; Beach's first Egypt entry.
Update on the three-year Save the Children youth program in remote South Australian communities, funded by Beach's A$600,000 grant. A coordinator is hired and groundwork is under way; no financial or operational impact.
Weekly report: Bodalla South-20 (Beach 100%) is drilling ahead at 1,284 m. Santos-operated Cook-14 and Bindah-2 are being cased and suspended as future oil producers.
Media release repeating the Tanzania Lake Tanganyika South Block news, with Reg Nelson citing oil seeps and similarity to Ugandan discoveries. Describes it as Beach's first move into Africa; a production sharing agreement must still be negotiated.
Beach won exclusive rights, after a contested tender, to negotiate a production sharing agreement to explore the southern half of Lake Tanganyika, Tanzania (about 5,400 sq km). It is Beach's first Africa move; no work can start until terms are agreed.
Bodalla South-19 (Beach 100%) is being cased as a future oil producer. Basker-6 ST1 flowed 3,980-4,800 bopd per zone, with production expected in the third quarter of 2008.
Basker 6 ST1's third and final test over zones 2 and 7 flowed a stable 4,800 bpd with zero water, bringing the three zones to nearly 13,000 bpd, far above what the JV expected. Anzon said this supported a south-eastern field extension, with the well to be connected in July 2008.
Anzon reports the Basker 6 ST1 completion and subsea tree are installed and tested. Cleanup flow tests on each zone are due over the weekend, then the well is suspended awaiting tie-back to the Crystal Ocean FPSO.
Anzon reports the BMG joint venture sold about 570,000 bbl of crude at an expected value above US$118/bbl, and marked a year of operations without lost-time incidents. Beach holds 30%.
Beach completed the sale of 10% of the BMG joint venture to Sojitz, receiving A$123m on 24 April 2008. Beach retains 30%. Regulatory approval is still required. This is the second such A$123m sale, after Itochu's in October 2007.
Anzon reports Basker 6 ST1 has been perforated in four sands with a three-packer completion. Cleanup flow testing awaits better weather, then it will be tied to the Crystal Ocean FPSO in mid July.