1 Apr 2009drilling progress report● Neutral

Weekly report: South July-1 sidetrack (Beach 33.33%) is at 3,386 m, running in hole with a new assembly. Nephrite South-5 is cased and suspended as a future gas producer.

Value this in the calculator →Discuss in chat

1 Apr 2009dividend declaration● Neutral

Directors set a 5% discount for the dividend reinvestment plan on the 0.75 cent interim dividend, giving a share issue price of A$0.866.

Discuss in chat

31 Mar 2009drilling scheduled▲ Good

Beach plans a six-well exploration program in PEL 92 (Beach 75%) from May, testing prospects with 7.0 million barrels of unrisked mean recoverable oil. Prior record is 12 wells at 50% success, finding over 8 million barrels.

Value this in the calculator →Discuss in chat

26 Mar 2009investor presentation● Neutral

Managing Director's talk to the Australian Shareholders' Association is a general industry primer on how oil and gas deposits form, supply, demand and prices, ending with a Beach snapshot. No new company announcements evident in the readable text.

Discuss in chat

25 Mar 2009drilling progress report● Neutral

Weekly report: South July-1 sidetrack (Beach 33.33%) is drilling ahead at 3,058 m targeting oil in the Yusr sands. Tindilpie-7 and Nephrite South-5 gas wells in the Cooper Basin (Beach 20.21%) also progress.

Value this in the calculator →Discuss in chat

19 Mar 2009dividend declaration● Neutral

Interim dividend of 0.75 cents per share: record date 31 March 2009, payment 20 April 2009. Dividend reinvestment plan share price to be announced 1 April.

Discuss in chat

18 Mar 2009drilling progress report● Neutral

South July-1 in Egypt reached 3,927 m, with hydrocarbon shows at the top of the Yusr sandstone. A sidetrack is now drilling updip. Beach's sidetrack share is 33.33% (Santos not participating), up from 20% in the original well.

Value this in the calculator →Discuss in chat

17 Mar 2009joint venture update● Neutral

BMG operator ROC says the joint venture cut 2009 rig commitments, saving over US$100m, and relaxed the flaring end-date of 16 March 2009. Focus shifts to Phase-1 oil production; Phase-2 gas commitments reduced. Beach holds 30%.

Discuss in chat

13 Mar 2009half year report▲ Good

Shareholder update restating half-year results to 31 Dec 2008: net profit up 117% to A$128m, oil and gas sales up 34% to A$334m, record production of 5,004 kboe, 86% Cooper Basin drilling success. Debt A$197m, cash A$139m; no new figures.

Discuss in chat

11 Mar 2009drilling progress report● Neutral

Weekly report: South July-1 in Egypt (Beach 20%) is drilling ahead at 3,898 m after the stuck pipe was cleared. Fly Lake-26 (Beach 20.21%) reached 2,952 m and is preparing to log.

Value this in the calculator →Discuss in chat

10 Mar 2009resource reserve update▲ GoodMajor

Beach clarifies its Cooper Basin contingent resource: best estimate 262 mmboe net (low 132, high 492), split into conventional 83 and unconventional 179. Converting all of it to reserves would more than double its 63 mmboe Cooper reserves. These are not booked reserves.

Value this in the calculator →Discuss in chat

5 Mar 2009joint venture update▲ Good

Petratherm registered the Paralana joint venture's interest in the federal A$435m Renewable Energy Demonstration Program, proposing a 30 MW demonstration project. Grants could cover up to one-third of eligible costs, expected at A$50-100m, with applications due 15 April 2009.

Discuss in chat

4 Mar 2009production update▲ GoodMajor

Cooper Energy says Callawonga-5 and -6 cleaned up at a combined 6,600 bbl/d, lifting PEL 92 production to a record 6,100 bbl/d. Perlubie-1 flowed 2,600 bbl/d of clean oil and will be tied in during the June quarter. Beach holds 75%.

Discuss in chat

4 Mar 2009joint venture update▼ Bad

Petratherm says the Paralana 2 deep well spud is now 15 June 2009, later than the May 2009 previously planned. The drilling rig leaves Dubai on 15 April and is due in South Australia on 10 May. Beach is earning into the project.

Discuss in chat

4 Mar 2009flow test result▲ Good

Perlubie-1 (Beach 75%) completed as an oil producer, free-flowing 2,600 bbl/d without water. Callawonga-5 and -6 flowed a combined 6,600 bbl/d. South July-1 in Egypt is at 3,773 m, with the drill pipe stuck.

Discuss in chat

26 Feb 2009drilling progress report▲ Good

Drillsearch says Chilla-3A (Beach 38.5%) found oil shows in the Murta Formation, was cased and suspended as a potential producer, and completes the Naccowlah drilling program. Planet Downs-1 spudded, with no Beach interest.

Value this in the calculator →Discuss in chat

25 Feb 2009drilling progress report● Neutral

Weekly report: Muteroo-6 (Beach 20.21%) was plugged and abandoned, while Chilla-3A (Beach 38.5%) is being cased as a future oil producer. South July-1 in Egypt is at 3,757 m, completing wireline logging.

Value this in the calculator →Discuss in chat

24 Feb 2009dividend declaration● Neutral

Interim dividend of 0.75 cents per share, record date 31 March 2009. Payment date and dividend reinvestment plan pricing are still to be advised.

Discuss in chat

24 Feb 2009half year report▲ Good

For the half-year to 31 December 2008, Beach's net profit rose 117% to A$127.5m and revenue rose 41% to A$480.5m. It declared an interim dividend of 0.75 cents per share, the same as a year earlier, with a record date of 31 March 2009.

Discuss in chat

24 Feb 2009asset acquisition disposition● NeutralMajor

With its half-year result, Beach says it has sought expressions of interest for a sale of part or all of its Tipton West coal seam gas and associated assets, after a strategic review. Further details are expected in coming months. Net profit rose 117% to A$127.5m.

Discuss in chat

24 Feb 2009investor presentation● Neutral

Half-year results presentation repeating known figures: net profit up 117% to A$127.5m, cash A$139m, net debt gearing 4.6%, and debt down 16% to A$197m. Cooper contingent resource of 262 mmboe is restated.

Discuss in chat

23 Feb 2009joint venture update▼ Bad

Essential Petroleum says the period to fix its default on the December VIC/P46 cash call has expired. It has asked for an extension and is negotiating with a Hong Kong investor group, with an update promised by 24 February. Beach operates with 50%.

Discuss in chat

20 Feb 2009joint venture update▼ Bad

Beach confirms it received notice of BW Offshore's Federal Court claim of about US$90.1m against the Basker-Manta-Gummy participants, over costs from the terminated FPSO letter of intent. The participants dispute it and will defend. Beach holds 30%.

Discuss in chat

20 Feb 2009joint venture update▼ BadMajor

ROC, on behalf of operator Anzon, says BW Offshore has sued the Basker-Manta-Gummy participants in the Federal Court for about US$90.1m of costs after the cancelled FPSO letter of intent. The participants dispute it and will defend. Beach holds 30%.

Discuss in chat

19 Feb 2009drilling progress report● Neutral

Drillsearch reports Chilla-3 (Beach 38.5%) was abandoned at 230 m after a failed casing pressure test; Chilla-3A was spudded nearby targeting the Murta Formation. Planet Downs-1 does not involve Beach.

Value this in the calculator →Discuss in chat

18 Feb 2009drilling progress report▲ Good

Perlubie-1 (Beach 75%) is cased and suspended as a future oil producer, tied in via Parsons, with production scheduled from end of June. South July-1 in Egypt is at 3,647 m, preparing to log before intermediate casing.

Value this in the calculator →Discuss in chat

11 Feb 2009drilling progress report● Neutral

Weekly report: logging tools are still being recovered at Perlubie-1 (Beach 75%) before it is cased as an oil producer. Jackson East-2 (Beach 38.5%) was cased as an oil producer. South July-1 in Egypt (Beach 20%) is drilling at 3,324 m.

Value this in the calculator →Discuss in chat

6 Feb 2009resource reserve update▲ GoodMajor

Independent assessment lifts Beach's Tipton West coal seam gas reserves at 31 December 2008: 3P up 34% to more than 1,115 PJ (192 mmboe), 2P 467 PJ (80 mmboe), 1P 111 PJ (19 mmboe). This updates the 2P of 443 PJ previously noted.

Value this in the calculator →Discuss in chat

6 Feb 2009resource reserve update▲ Good

Media version of the Tipton West upgrade: Beach's 3P rose 34% to over 1,115 PJ (192 mmboe). Converting the new possible reserves to 2P could lift reserves about 77%. Converting the 262 million boe Cooper contingent resource could add more; both are potential, not booked.

Value this in the calculator →Discuss in chat

5 Feb 2009drilling progress report● Neutral

Drillsearch says Jackson East 2 (Beach 38.5%) spudded 30 January, is at 1,616 m with oil shows in three formations, and is heading for logging. Planet Downs-1 remains weather-delayed and does not involve Beach.

Value this in the calculator →Discuss in chat