Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

17 Mar 2006drilling spud● Neutral

Beach confirms Christies-4 spud on 17 March, targeting the Birkhead/Hutton oil pool south-east extension to 1684 m. Beach is switching to weekly drilling reports on Tuesdays.

Value this in the calculator →Discuss in chat

17 Mar 2006drilling spud● Neutral

Christies-4 spudded at midnight on 17 March and has drilled to 47 m. Beach holds 75% and Cooper Energy 25%. Routine appraisal well in the existing Christies oil field.

Value this in the calculator →Discuss in chat

15 Mar 2006drilling scheduled● Neutral

Cooper Energy says Christies-4, an oil appraisal well in the Christies field, should spud 17 March using Century 3. Planned depth is 1684 m, taking 8-10 days.

Value this in the calculator →Discuss in chat

10 Mar 2006drilling scheduled● Neutral

Beach's final Middleton-1 report: rig being released and moving about 30 km west to Christies-4, expected to spud around 17 March. Beach holds 75% of Christies, Cooper Energy 25%.

Value this in the calculator →Discuss in chat

9 Mar 2006drilling progress report● Neutral

Great Artesian's final Middleton-1 report: casing is being run before rig release. Gas zones, including the 11.8 mmcf/d interval, may get cased-hole testing within 2-3 months depending on equipment.

Value this in the calculator →Discuss in chat

6 Mar 2006drilling progress report● Neutral

Beach says Middleton-1 is preparing a second drill stem test (DST 2) over 2653-2663 m in the Patchawarra Formation. Results will follow; the earlier test had misrun.

Value this in the calculator →Discuss in chat

6 Mar 2006drilling progress report● Neutral

Great Artesian says weekend wireline logs on Middleton-1 indicate several possible gas zones in the Patchawarra. An inflate-straddle test (DST-2) will run over 2653-2663 m. No result yet.

Value this in the calculator →Discuss in chat

3 Mar 2006drilling progress report● Neutral

Great Artesian repeats Beach's update: Middleton-1 at 2841 m, preparing to log, with several sands showing elevated gas readings. Routine, no result yet.

Value this in the calculator →Discuss in chat

2 Mar 2006drilling progress report● Neutral

Great Artesian repeats that Middleton-1 reached total depth of 2841 m in the Merrimelia Formation, with several sands showing elevated gas readings. Wireline logs are about to run; no test result yet.

Value this in the calculator →Discuss in chat

2 Mar 2006drilling progress report● Neutral

Middleton-1 reached total depth of 2841 m, shy of the planned 2895 m, and Beach is preparing to run wireline logs. Whether the well found hydrocarbons is not yet stated.

Value this in the calculator →Discuss in chat

28 Feb 2006drilling result● Neutral

Middleton-1's first drill stem test over 2653.0-2666.6 m was misrun because the tool plugged, so there is no flow result. The sand will be evaluated from wireline logs instead, and drilling resumes.

Value this in the calculator →Discuss in chat

28 Feb 2006drilling progress report● Neutral

Great Artesian repeats Beach's report that Middleton-1's DST-1 misran due to tool plugging. Drilling ahead resumes at 2667 m, with the sand to be evaluated from logs.

Value this in the calculator →Discuss in chat

27 Feb 2006drilling progress report● Neutral

Great Artesian reports Middleton-1 at 2667 m after Patchawarra sandstones showed elevated gas readings. A drill stem test is planned over 2653.0-2666.6 m. Routine progress, no result yet.

Value this in the calculator →Discuss in chat

20 Feb 2006drilling progress report● Neutral

Great Artesian repeats Beach's 20 February Middleton-1 report: 1543 m, drilling ahead in the Oodnadatta Formation, targeting 2895 m. Prospect could hold up to 3 million barrels of oil or 15 BCF of gas (P10). Routine progress.

Value this in the calculator →Discuss in chat

20 Feb 2006drilling progress report● Neutral

Anzon reports Manta-2A was perforated over 34 m of oil zones and fitted with 4.5-inch tubing. It will be flowed briefly, then closed in until Q3 2006, when it is tied back to the FPSO. Beach holds 50%.

Value this in the calculator →Discuss in chat

16 Feb 2006drilling spud● NeutralMajor

Beach spudded Middleton-1 on 15 February, now at 360 m, planned to 2895 m in about 20 days. It is 6 km southeast of the Udacha-1 gas discovery; Beach funds it and holds 50%, Great Artesian 50%.

Value this in the calculator →Discuss in chat

16 Feb 2006drilling progress report● Neutral

Great Artesian reports Middleton-1 spudded at 1530 hrs on 15 February and is at 360 m drilling ahead. The prospect could hold up to 3 million barrels of oil or 15 BCF of gas (P10).

Value this in the calculator →Discuss in chat

13 Feb 2006drilling result▲ GoodMajor

Manta-2A, the replacement for the failed Manta-2, reached 3113 m and found 32.6 m of oil sand and 27.4 m of gas sand. That is about 25% more oil sand than Manta-1; the 7-inch liner is set and completion is next. Beach holds 50%.

Value this in the calculator →Discuss in chat