19 Aug 2011material agreement● Neutral
Senex announces an agreement with Beach to build two flowlines carrying Growler oil to Moomba, at about $20m net to Senex. Beach will construct and operate them, targeting completion by June 2012, subject to Cooper Basin JV approval of the Moomba tie-in.
Somerton Energy says it has begun preliminary merger talks with Adelaide Energy, with no agreed price or terms and no certainty of a deal. It cites Beach, a major Somerton shareholder, agreeing to take a placement in Adelaide Energy.
15 Aug 2011capital raising announcement▲ GoodMajor
Beach commits $12.1m to Adelaide Energy: 14m shares at 16.5c now, then a further 59.5m shares and 75m options (40c strike, to 2016) if shareholders approve. This would give Beach 19.95%, deepening ties in the Nappamerri Trough shale gas play.
Cooper Energy reports Elliston-1 in PEL 92 found a 3m net oil column in the Namur, about 0.11 million barrels recoverable (P50). It will be tied in as a production well. Beach operates with 75%; the rig moves to Perlubie-2.
Drillsearch reports Searcy-1, the fifth and final PEL 91 well (Beach 40% operator), spudded 10 August. Mean prospective resource is 1.1 million bbl in the Birkhead, high side 2.2 million bbl. Drilling expected to take 10-14 days.
Beach booked an initial 2 Tcf gross contingent shale gas resource in PEL 218 (Beach 90%), over 330 MMboe or about five times its June 2010 reserves. It rests on 100 sq km around each of Holdfast-1 and Encounter-1. Independent review to follow.
Petratherm released a Paralana project update presentation and video, covering the fracture stimulation results and a planned Paralana 2 flow test this quarter. Beach is a joint venture partner. Mostly repeats the 19 July results.
Media release repeating the 2 Tcf PEL 218 shale gas booking (1 Tcf per well, 100 sq km each), with comparisons to Cooper Basin history of about 6 Tcf produced. Two horizontal pilot wells planned for 2012. No new figures.
July report: Wheatons-1 in PEL 92 was dry, Rincon-1 and Bauer-1 succeeded, and Arno-1 was judged sub-commercial and not cased, so the earlier Arno hopes did not pan out. Holdfast-1 flowed 1.8 MMscf/d and will be shut in for pressure build-up. Al Ahmadi-1 in Egypt is drilling.
Drillsearch (60% of PEL 91) restates the Bauer-1 discovery: 15m oil column, up to 2 million bbl gross recoverable, calling it the largest McKinlay-Namur find in the permit. Production expected December quarter 2011; Searcy-1 is next.
Cooper Energy (25% of PEL 92) confirms the Rincon-1 discovery, a 5m gross oil column in the Namur, versus a pre-drill estimate of 0.551 million bbl P50. It will be a production well tied into the PEL 92 system. Elliston-1 is next.
Beach announced two oil discoveries: Bauer-1 in PEL 91 (15m column, up to ~2 million bbl gross, online Q4 2011) and Rincon-1 in PEL 92 (5m column, up to 500,000 bbl gross). Bauer is the third PEL 91 well to succeed, after Hanson-1 and Snellings-1.
Drillsearch reports Bauer-1, fourth of five PEL 91 wells (Beach 40% operator), spudded 24 July. Mean prospective resource is 840,000 bbl in the Namur, high side 1.36 million bbl. Drilling expected to take 10-14 days.
Petratherm reports the Paralana 2 fracture stimulation succeeded, with the stimulated zone reaching about 900m east of the well at 3,500-4,000m depth, beyond the 500m target. This helps site Paralana 3. Beach holds 21% (inferred from earlier context).
Beach and Icon settled the ATP 855P dispute, dropping the Federal Court case. Icon transfers 40% to Beach (subject to Ministerial approval); Beach funds Icon's share of a ~A$16m gross horizontal pilot well bar Icon's A$1.75m. Icon gets 33.333% of PEL 218 Post Permian.
Beach's own release confirms the ATP 855P settlement: court case discontinued, 40% transferred from Icon (subject to approval), Beach to drill a horizontal shale pilot well. Resolves the dispute set for trial 18 July. Repeats Icon's release.
Holdfast-1 flowed gas at an average of 1.8 MMscf/d, reaching about 2 MMscf/d, from 3,100-3,500m, beating expectations for a vertical data-gathering well. A material shale resource booking is due in late July/early August, and Encounter-1 stimulation is expected in the December quarter.
Adelaide Energy (10% of PEL 218) repeats Beach's Holdfast-1 result of about 2 MMscf/d, with no formation water seen so far. It expects to progress the material resource booking in coming months. Third-party restatement.
Media release on Holdfast-1's flow of up to 2 MMscf/d, steady at about 1.8 MMscf/d. Management calls it significant and expects higher rates from horizontal wells. The 2012 pilot program is two horizontal wells, one per location. Repeats the ASX release.
Petratherm reports the Paralana 2 fracture stimulation has begun, expected to finish by the end of the following week. It aims to create fractures beyond 500m and will help site the Paralana 3 production well. Beach, with 21%, is a partner.
June report: Turton-1 and Westall-1 in PEL 92 were dry; Parsons-5 succeeded. Snellings-1 was cased as a discovery and Arno-1 is drilling. Holdfast-1 clean-up began. Wandilo South-1 was dry; ZZ-4 in Egypt was cased and suspended for later flow testing.
The PEL 92 joint venture approved a 12-month program to June 2012 of nine exploration wells plus 3D and 2D seismic, costing over A$24 million. It targets a risked mean gross reserve addition of about 1.8 million bbl. Beach holds 75%.
Beach's Asian roadshow presentation repeats known points: FY11 production guidance of about 6.5 MMboe, 2P reserves of 66 MMboe and total 363 MMboe at June 2010, and growing east coast gas demand. No new results in the readable text.
Arno-1, the third of five PEL 91 wells (Beach 40% operator, Drillsearch 60%), spudded 30 June. Mean prospective resource is 790,000 bbl in the Namur and 280,000 bbl in the Birkhead, high side up to 1.3 million bbl and 530,000 bbl. Drilling takes 10-14 days.
Beach replaced its A$35 million working capital facility with a A$150 million revolving corporate credit facility backed by Commonwealth Bank. It does not expect to use it immediately; it is meant to support the planned exploration and development campaign for FY2012. Beach was previously debt free.
Parsons-5 in PEL 92 (Beach 75%) found a six-metre oil column, the program's fifth success. Beach's preliminary work points to a Parsons Field reserve increase of more than 800,000 barrels. Tie-in is expected in the second half; Wheatons-1 is next.
Cooper Energy (25% of PEL 92) reports Parsons-5 reached 1,384m and found about 6m of oil in good Namur sandstone. It will be cased and suspended. Confirms Beach's release; Cooper gives no reserve figure.
Holdfast-1 fracture stimulation was completed in seven stages and the shales fractured vertically, which favours horizontal production wells. Flow testing starts early July for about three months, with a resource booking in early August. Encounter-1 stimulation slips to the December quarter.
24 June 2011asset acquisition disposition▲ GoodMajor
Beach sold its entire Ramelius Resources shareholding for A$25 million cash, a further A$3.3 million profit. Beach once held 22.7%. It calls the gold stake non-core and says the cash will help fund oil and gas programs.