Each one in plain English, with the numbers worked through for a shareholder.
4 Apr 2012capital raising announcement● Neutral
Retail offer booklet: eligible holders can buy 1 new share per 8 held at $1.40, closing 20 April 2012, to raise about $78m. Entitlements cannot be traded and lapse if unused. Repeats terms already announced, including the $150m notes at 3.95%.
Letter telling shareholders outside Australia and New Zealand, and other ineligible holders, that they cannot join the retail entitlement offer. Notes the institutional part raised about $117m and retail about $78m. Administrative notice.
March report: Salwa-1 and Hawalli-1 in Egypt were plugged and abandoned with no significant hydrocarbons, ending the six-well campaign. Haslam-1 reached 2,913m. Encounter-1 fracture stimulation moves to late April. Moonta-1 needed a sidetrack. Bullamakanka-1 was dry.
Senex, Beach's 60% partner and operator, reports certified reserves at Growler up 90% (2P) after the drilling success. Senex's net 2P rose 27% to 8.1 MMbbl. This is the operator's figure, not Beach's own booking.
Senex and Beach add three appraisal wells (Growler-10, Snatcher-4 and -5) to take the campaign to 14 wells. Growler-10 spudded 27 March. Snatcher oil field, offline since the January 2010 flood, is due to restart production in April. Beach holds 40%.
29 Mar 2012capital raising announcement▲ GoodMajor
Beach completes the institutional offer, raising about A$117m at A$1.40, and prices A$150m of five-year convertible notes at 3.95%, convertible at A$2.00. Both were heavily oversubscribed per management. A retail offer of about A$78m follows, closing 20 April.
Preliminary offering circular for Beach's convertible notes, sold outside the United States via Citi, Goldman Sachs and Macquarie. Coupon, size and conversion price are still blank; Beach's last close was A$1.575. Final terms follow on pricing.
Investor presentation supporting the A$345m entitlement offer and convertible note raise announced the same day. Presentation text is mostly legal notices in the extract; the raise terms are covered in the main announcement.
27 Mar 2012capital raising announcement● NeutralMajor
Beach launches a A$345m raise: a fully underwritten 1-for-8 entitlement offer at A$1.40 (about A$195m, 11.1% discount to last close) plus about A$150m of convertible notes due 2017. Funds capex over 2-3 years across Cooper Basin, Egypt and Tanzania.
Senex reports Thunderchief-1, the next exploration well after Growler's successes, was plugged and abandoned with minor oil shows and poor reservoir in the target. Beach holds 40% of PEL 104. The rig moves to Growler-10.
Beach paid its interim dividend of 0.75 cents per share, fully franked, on 23 March 2012. The dividend reinvestment plan issue price was $1.430 after a 5% discount. The dividend was not underwritten. Confirms the dividend flagged with the half-year result.
Haslam-1, the fourth well of the PEL 106B wet gas program (Beach 50% operator), spudded 20 March, targeting the Patchawarra to 2,828m. High-case prospective recoverable gas is 19.6 BCF. It follows the Coolawang-1 discovery and will core up to 30m.
First Egyptian oil from Beach's 20% North Shadwan concession, from the NS377 field, initially restricted to about 1,000 bopd by pipeline. Trucking is expected in Q2 2012, and a second field (NS385) could lift output to 5,000 bopd gross by Q1 2013.
February report: Encounter-1 fracture stimulation (PEL 218) slips again, to early April. Moonta-1 at 2,924m, waiting on weather. Coolangatta-2 (ATP 633P) was dry. Spitfire-1 plugged as sub-commercial. Growler-8 cased as producer. Salwa-1 and Hawalli-1 reached total depth.
Beach announces it joins the S&P/ASX 100 index from 16 March 2012, citing a market capitalisation of about $1.7 billion. Management frames it as recognition of converting exploration into production. Confirms the index change; no operating news.
El Salmiya-1 in Egypt's Abu Sennan concession (Beach 22%) is the fourth straight discovery. It flowed a combined 5,600 boepd, including 17 MMscfd of gas from Abu Roash C. Commercial production awaits approvals. Salwa-1 and Hawalli-1 have reached total depth, with results being analysed.
Strike reports Marsden 1 (PEL 95, Beach 50% operator) reached 1,908m of a planned 2,640m before heavy rain closed access roads and suspended drilling. Coring and logging resume once roads reopen. A weather delay to the unconventional program.
S&P Indices' March rebalance lists Beach Energy as an addition to the S&P/ASX 100 from 16 March 2012. Senex and Drillsearch also appear among additions to other indices. Index change only, not a company operating event.
Beach's March presentation to Citi and Goldman Sachs conferences repeats known points: 2P reserves of 77 MMboe at 30 June 2011, FY12 production guidance of 7.5 MMboe, and FY12 2P reserves likely to rise over 20% (about 95 MMboe, estimate only).
Drillsearch (PEL 106B partner, 50%) reports Coolawang-1 as a wet gas discovery. A test flowed 4.5 MMscfd with high-value liquids. The well is cased for extended testing and may be combined with the nearby Canunda field. Rig moves to Haslam-1 next.
Beach confirms Coolawang-1 (PEL 106B, Beach 50% operator) as a gas and liquids discovery, flowing 4.5 MMscfd from 2,656-2,661m with 50° API liquids. It is 2.3km from Canunda and could be developed with it if commercial. Extended production testing follows.
Half-year results presentation repeats the reported figures: record underlying NPAT of $51.8m, sales revenue $294m (up 11%), liquids price $113/bbl. Highlights the Esso royalty deal, the 2 Tcf contingent gas booking, Bauer discovery and Adelaide Energy takeover. No new information.
Half-year to 31 December 2011: revenue $294.6m (up 11%), net profit after tax $56.1m (up 164%). Interim dividend 0.75 cents fully franked, with a 5% discount on the dividend reinvestment plan. Confirms the guided profit lift, mainly from the Esso royalty deal and higher oil prices.
Icon says a 425km 2D seismic survey is under way in ATP855P, finishing mid to late March. It lists interests as Icon 40%, Beach 60% including related companies. Drilling of a horizontal pilot well is expected to start in June. Icon's 20 Tcf recoverable figure is its own estimate.
Growler-8 appraisal well reached 1,843m with at least 18.5m net reservoir in the Birkhead Formation. It will be cased as a producer, online in March 2012. It extends the Growler oil field (Beach 40%), following Growler-7. The rig moves to Thunderchief-1.
Strike says Beach, as operator of PEL 95 (Beach 50%/Strike 50%), will spud the Marsden 1 unconventional coal and shale well on 22 February, to 2,640m. Davenport 1 in PEL 94 follows back-to-back. Continues the Southern Cooper Basin unconventional evaluation.
Beach expects first-half FY12 reported NPAT of $50-55m and underlying NPAT around $50m, against $18.5m underlying a year earlier. It cites the Esso royalty renegotiation, a roughly 30% higher oil price ($113/bbl), better Cooper access and the Tantanna pipeline. Second-half underlying NPAT is expected to be higher.
Somerton Energy (Beach ~57%) gets options to take up to 18% of the onshore and 8.25% of the offshore Bonaparte Basin tenements, on the same terms as Beach's TOAG farm-in. Firm spend would be up to $1.5m on 2012 surveys. Beach's own firm commitment is up to $5m.
Senex spudded Growler-8, the seventh well in the 11-well program, on 11 February (Beach 40%). It is an appraisal well 1,200m west of Growler-1 and will also test a possible lower Birkhead sand. Seven Growler wells are now on production.