Each one in plain English, with the numbers worked through for a shareholder.

15 Nov 2006resource reserve update▲ Good

Great Artesian relays Beach's preliminary reserves: Middleton 5.2 Bcf (6.3 PJ) and Udacha 2.8 Bcf (3.4 PJ) sales gas at proved plus probable. Adds a 500 sq km 3D seismic plan, with Beach funding about 140 sq km and Energy Investments about 300 sq km.

Value this in the calculator →Discuss in chat

15 Nov 2006drilling result▼ BadMajor

Keeley-1 will be plugged and abandoned on Beach's recommendation after logs and side-wall cores. It was a dud for the 40% operator against a roughly 10 Bcf mean prospect. The rig moves to Talia-1, an oil prospect, starting late this week.

Value this in the calculator →Discuss in chat

15 Nov 2006drilling progress report● Neutral

Beach weekly report: Keeley-1 is running abandonment plugs after two tight tests. Yanda-23 was cased as a Murta oil producer. Cutter-1 is plugged and abandoned. Might and Power-1 is completed. Rising Fast-1 is at 605 m.

Value this in the calculator →Discuss in chat

14 Nov 2006drilling spud● Neutral

Stuart spudded Rising Fast 1 in PEL 113 on 13 November, planned depth 1,550 m, now at 125 m. Beach holds 33.3%. Follows Might and Power 1 in the same permit; no result yet.

Value this in the calculator →Discuss in chat

14 Nov 2006resource reserve update▲ GoodMajor

Beach books gross proved and probable sales gas reserves of 6.3 PJ at Middleton and 3.4 PJ at Udacha, from extended testing. Development needs gas sales or access deals. A 180 sq km 3D seismic survey is planned for early 2007.

Value this in the calculator →Discuss in chat

14 Nov 2006drilling progress report● Neutral

Great Artesian repeats that Keeley-1 reached 3,059 m and is running wireline logs, with elevated gas and fluorescence in some sands still being assessed. Beach operates with 40%. Repeats known facts.

Value this in the calculator →Discuss in chat

10 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 at 2,982 m, drilling ahead after a wiper trip following the aborted test. Planned depth is 3,023 m. Beach operates with 40%. No new result.

Value this in the calculator →Discuss in chat

9 Nov 2006drilling result▼ Bad

Anzon repeats that Cutter-1 reached 2,930 m, with water-wet primary sandstones and poor-quality shallow gas sands not commercially significant. The well is being plugged and abandoned. Beach holds 20%. Repeats the Tap and AWE announcements.

Value this in the calculator →Discuss in chat

9 Nov 2006drilling progress report● Neutral

Magellan's weekly report puts Keeley-1 at 2,968 m on 8 November and says its first test failed for mechanical problems. Magellan earns 30% only on a commercial discovery; Beach operates with 40%. Repeats known facts.

Value this in the calculator →Discuss in chat

8 Nov 2006drilling progress report● Neutral

Beach weekly report: Cutter-1 at 2,930 m with water-wet sands, being abandoned; Byrock-2, Glenaire-1ST1 and Pasticcio-1 cased and suspended; Might and Power-1 cementing casing after one 2-barrel oil recovery; Keeley-1 at 2,968 m preparing a test.

Value this in the calculator →Discuss in chat

8 Nov 2006drilling result▼ Bad

Tap confirms Cutter-1 was water wet in the main Shag Point sandstones; the shallow gas shows are not likely to be economic at Cutter. The well will be plugged and abandoned. Beach holds 20%. Tap will study the Barque prospect.

Value this in the calculator →Discuss in chat

8 Nov 2006drilling progress report● Neutral

Keeley-1 reached 2,968 m and a drill stem test of the lower Patchawarra (2,941-2,968 m) was about to start, after a sand showed fluorescence, elevated gas and reasonable porosity. Beach operates with 40%. Result pending.

Value this in the calculator →Discuss in chat

7 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 at 2,953 m, still drilling in the Patchawarra with elevated gas readings noted in several sands. Beach operates with 40%. No test result yet.

Value this in the calculator →Discuss in chat

7 Nov 2006resource reserve update● NeutralMajor

Beach clarifies in response to shareholder enquiries that proved and probable reserves at 1 July 2006 were 101.0 mmboe (Cooper/Eromanga 69.8, Gippsland 19.6, Surat 11.7). A further 36 mmboe Basker-Manta-Gummy contingent resource needs a gas contract and development approval.

Value this in the calculator →Discuss in chat

6 Nov 2006drilling result▼ BadMajor

Cutter-1 reached target depth: the main Shag Point sands were water wet, with gas shows in shallower rocks. A disappointment against the earlier 70-80 mmbbl potential; Tap sees implications for the nearby Barque prospect. Beach holds 20%.

Value this in the calculator →Discuss in chat

6 Nov 2006drilling result▼ Bad

AWE confirms Cutter-1 reached 2,930 m with water-wet primary sands. Shallow gas shows have poor reservoir quality and are unlikely to be commercially significant. Beach holds 20%. The rig moves to Taranaki.

Value this in the calculator →Discuss in chat

6 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 at 2,876 m, with several Patchawarra sands showing elevated gas readings to be assessed after logging. Beach operates with 40%. Encouraging signs only, not a confirmed result.

Value this in the calculator →Discuss in chat

3 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 drilling ahead at 2,640 m in the Patchawarra Formation toward planned 3,023 m. Beach operates with 40%. No results yet.

Value this in the calculator →Discuss in chat

3 Nov 2006drilling result▲ GoodMajor

Byrock-2 (Beach 46.95% operator) flowed 10 barrels of oil with no water from the Toolachee Formation, confirming an oil discovery. Byrock-1 found oil in the same formation in 1986. The well will be cased as a future producer.

Value this in the calculator →Discuss in chat

3 Nov 2006drilling progress report● Neutral

Stuart now says Might and Power 1's second test was a misrun and the first Murta test is considered invalid, so the Murta will be retested. A McKinlay test follows. Beach holds 33.3%. Still no valid result.

Value this in the calculator →Discuss in chat

2 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 drilling ahead at 2,513 m in the Patchawarra Formation toward planned 3,023 m. Beach operates with 40%. No results yet.

Value this in the calculator →Discuss in chat

2 Nov 2006drilling progress report● Neutral

Magellan's weekly report repeats Keeley-1 at 2,425 m on 1 November, with a 10 Bcf best-estimate and 29 Bcf high-estimate prospect. Magellan earns 30% only if commercial; Beach operates with 40%. No new information.

Value this in the calculator →Discuss in chat

1 Nov 2006drilling progress report● Neutral

Might and Power 1 has run logs at 1,507 m and is preparing a drill stem test of 1,158-1,168.5 m in the Murta Member. Follows earlier oil shows. Beach holds 33.3%. No test result yet.

Value this in the calculator →Discuss in chat

1 Nov 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 at 2,425 m in the Patchawarra Formation, the main gas target, changing drill bit. Planned depth 3,023 m; Beach operates with 40%. No result yet.

Value this in the calculator →Discuss in chat

1 Nov 2006drilling progress report● Neutral

Beach weekly report: Keeley-1 at 2,425 m; Glenaire-1ST1 at 3,701 m cementing liner; Byrock-2 preparing DST; Yanda-19 cased as future oil producer; Cutter-1 at 2,045 m; Might and Power 1 preparing DST. No new results.

Value this in the calculator →Discuss in chat

31 Oct 2006drilling progress report● Neutral

Great Artesian reports Keeley-1 at 2,229 m, drilling ahead in the Nappamerri Group toward planned 3,023 m. Beach operates with 40%. No results yet.

Value this in the calculator →Discuss in chat

31 Oct 2006drilling progress report● Neutral

AWE reports Cutter-1 at 2,027 m with 13-3/8 inch casing set, about one week from the target depth of about 2,800 m. Prospect potential 70 to 80 million barrels; Beach holds 20%. No result yet.