Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

17 Nov 2008drilling spud● Neutral

Canunda-1 spudded 14 November in PEL 106, 11 km north of Brownlow-1; Beach's second well to earn 50%. Beach estimates mean 7.4 BCF, P10 13.5 BCF, reaching the target in 8-10 days.

Value this in the calculator →Discuss in chat

13 Nov 2008drilling progress report● Neutral

Drillsearch update: Canunda-1 expected to spud 14 November, second well for Beach to earn 50% of the PEL 106 block. Watson-3 (Beach 38.5%) found oil shows and is preparing to run logs.

Value this in the calculator →Discuss in chat

12 Nov 2008drilling progress report▲ Good

Weekly report: West Triton repairs are complete and the rig is back at PeeJay-1, jacking up. Canunda-1 (Beach earning 50%) is due to spud around 14 November. Watson-3 (38.5%) in progress.

Value this in the calculator →Discuss in chat

7 Nov 2008resource reserve update● Neutral

Drillsearch addendum to its quarterly report adds omitted reserves for Kiana, Middleton and Udacha, based on Beach reports. A minor correction for Drillsearch, with no change to Beach's own figures.

Value this in the calculator →Discuss in chat

6 Nov 2008drilling progress report● Neutral

Drillsearch update: Brownlow-1 cased and suspended; Jackson South-16 (Beach 38.5%) found oil pay and was suspended as a future producer. Watson-3 spudded 6 November. Nothing new for Beach.

Value this in the calculator →Discuss in chat

5 Nov 2008drilling progress report▲ Good

Weekly report: Brownlow-1 cased and suspended as a future gas/condensate producer; Ensign 30 moves to Canunda-1. Tickalara-20 and Jackson South-16 successful. West Triton repairs are progressing, with PeeJay-1 expected to resume by mid November.

Value this in the calculator →Discuss in chat

5 Nov 2008drilling result● Neutral

Drillsearch: Brownlow-1 will be cased and suspended as a future gas producer. The deeper sand tested tight with no flow (8.4 bbl of gas-cut water). The 7 m gas pay is not tested yet; it awaits a later cased-hole test.

Value this in the calculator →Discuss in chat

3 Nov 2008drilling result▲ Good

Media release on the Brownlow-1 discovery: Beach estimates 7 to 14 BCF, consistent with pre-drill estimates. Management sees potential for fields up to 100 BCF in similar subtle traps on the Cooper's western flank.

Value this in the calculator →Discuss in chat

3 Nov 2008drilling result▲ GoodMajor

Beach reports a gas discovery at Brownlow-1 (PEL 106, Beach 50% operator): a 7 m gas sand at 2,583-2,590 m, with up to 30 m gas column. It resolves the pending well, which is 2 km north of Middleton-1.

Value this in the calculator →Discuss in chat

3 Nov 2008drilling progress report▲ Good

Drillsearch update: Brownlow-1 reached 2,785 m on 1 November. Logs confirmed gas pay in a 7 m Patchawarra sand; a drillstem test of a deeper sand was planned for 4 November.

Value this in the calculator →Discuss in chat

30 Oct 2008resource reserve update▲ GoodMajor

Media release on record A$182.8m quarterly revenue. Tipton West 2P gas reserves at 30 June 2008 rose 382% to 1,107 PJ; Beach's 40% share is 443 PJ (76 mmboe) after an independent recertification by Netherland Sewell.

Value this in the calculator →Discuss in chat

29 Oct 2008drilling progress report● Neutral

Weekly report: Brownlow-1 (Beach 50%) drilling ahead at 2,520 m in the Patchawarra Formation. PeeJay-1 rig repairs continue, with drilling expected to resume mid November. Tickalara-20 and Jackson South-16 (38.5%) in progress.

Value this in the calculator →Discuss in chat

29 Oct 2008drilling progress report● Neutral

Drillsearch update: Brownlow-1 at 2,514 m drilling ahead. Jackson South-14 (Beach 38.5%) was plugged and abandoned on 22 October; Jackson South-16 spudded 24 October. Little new for Beach.

Value this in the calculator →Discuss in chat

22 Oct 2008drilling progress report● Neutral

Weekly report: Tickalara-19 (30%) cased as a future oil producer; Jackson South-14 to be plugged and abandoned. Brownlow-1 running surface casing; West Triton moved to shallower water for repairs at PeeJay-1.

Value this in the calculator →Discuss in chat

22 Oct 2008drilling progress report▼ Bad

Drillsearch update: Brownlow-1 at 924 m running surface casing. Jackson South 14 (Beach 38.5%) reached 1,591 m and is being plugged and abandoned, a dry hole.

Value this in the calculator →Discuss in chat

20 Oct 2008drilling spud● Neutral

Brownlow-1 spudded 19 October in PEL 106 (Beach operator, to earn 50% by funding two wells). It targets Patchawarra gas/condensate with a mean estimate of 6.9 BCF; Canunda-1 follows immediately.

Value this in the calculator →Discuss in chat

17 Oct 2008drilling progress report▼ BadMajor

The West Triton rig was damaged on 16 October during pre-load at PeeJay-1; damage is to leg bracing, with no injuries. Work on PeeJay-1 is halted and the drilling schedule awaits repair timing, a setback to the three-well offshore program.

Value this in the calculator →Discuss in chat

16 Oct 2008drilling progress report● Neutral

Drillsearch update: Brownlow-1 expected to spud 16-17 October; Jackson South 14 (Beach 38.5%) spudded 11 October and drilling at 978 m. Nothing new for Beach.

Value this in the calculator →Discuss in chat

15 Oct 2008drilling scheduled▲ GoodMajor

Beach launches its offshore campaign: three back-to-back wells with the West Triton rig, PeeJay-1 and Spikey Beach-1 (Bass Basin) then Fermat-1 (Otway, gas potential over 1 TCF), running to end of January. Also mentions joining a Burtocal appraisal well in Egypt.

Value this in the calculator →Discuss in chat

15 Oct 2008drilling progress report● Neutral

Weekly report: Jackson South-15 and Iliad-6 successful; Brownlow-1 (50%) rigging up to spud. West Triton rig arrived at PeeJay-1 and is pre-loading. Jackson South-14 and Tickalara-19 drilling.

Value this in the calculator →Discuss in chat

9 Oct 2008drilling progress report● Neutral

Drillsearch update: Ensign-30 moving to Brownlow-1 in PEL 106, first of two wells for Beach to earn 50%. Jackson South 15 (Beach 38.5%) to be cased and suspended after a test recovered 20.8 bbl oil. Little new.

Value this in the calculator →Discuss in chat

8 Oct 2008drilling progress report● Neutral

Weekly report: Ensign-30 rig moving to Brownlow-1 (Beach 50%), first of at least five Beach-operated Cooper wells. West Triton rig due next week for PeeJay-1 (target mean 27 mmbbl). Jackson South-15 and Iliad-6 in progress.

Value this in the calculator →Discuss in chat

1 Oct 2008drilling progress report● Neutral

Weekly report: Iliad-5 (Beach 30%) cased as a future oil producer; Jackson South-15 (38.5%), Big Lake-90 and Munkah-12 drilling. Tipton-137 coal seam gas well completed as a producer.

Value this in the calculator →Discuss in chat

26 Sept 2008drilling progress report● Neutral

Drillsearch (2% holder) update: Jackson 57 (Beach 38.5%) cased and suspended as a future Hutton oil producer; rig moves to Jackson South 15. Nothing new for Beach.

Value this in the calculator →Discuss in chat

24 Sept 2008drilling progress report● Neutral

Weekly report: Galex-2 (gas, 23.2%) and Jackson-57 (oil, 38.5%) cased as future producers; Big Lake-90 (20.21%) drilling. Tipton CSG drilling continues.

Value this in the calculator →Discuss in chat

17 Sept 2008drilling progress report● Neutral

Weekly report: Big Lake-89 (gas, 20.21%) and Iliad-4 (oil, 30%) cased as future producers; Galex-2 and Jackson-57 drilling. Tipton CSG wells completed.

Value this in the calculator →Discuss in chat

10 Sept 2008farm in farm out agreement▲ Good

Beach agreed with Drillsearch (which absorbed Great Artesian) to drill two PEL 106 gas/condensate wells, Brownlow-1 and Canunda-1, from October 2008, earning 50% of the Beach Farmin Block. Beach hands gas marketing to Drillsearch.

Value this in the calculator →Discuss in chat