Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

1 Oct 2009drilling progress report● Neutral

Weekly report: Wakefield-1 (Beach 23.33%) is cased and suspended for further evaluation, and the rig was released 26 September, ending a nine-well Eromanga exploration campaign. Egypt's NS394-3 is at 2,117 m; Paralana-2 is at 2,851 m.

Value this in the calculator →Discuss in chat

29 Sept 2009drilling result● NeutralMajor

Wakefield-1 (Beach 23.33%, operator) hit oil and gas shows at many levels but wireline logs were inconclusive over the key zones. It was cased and suspended at 2,297 m; the joint venture will consider cased-hole testing. Not yet a discovery.

Value this in the calculator →Discuss in chat

23 Sept 2009drilling progress report● Neutral

Weekly report: Wakefield-1 (Beach 23.33%) reached total depth of 2,298 m with fair oil shows in several formations and is about to run wireline logs. Egypt's NS394-3 is at 1,315 m; NS377-3 development well due to spud.

Value this in the calculator →Discuss in chat

17 Sept 2009drilling progress report▲ Good

Bounty reports Wakefield-1 at 1,873 m in the Namur Sandstone with oil shows in several intervals, though their significance awaits logging and testing. Birkhead and Hutton objectives not yet reached. Beach operates with 23.33%.

Value this in the calculator →Discuss in chat

16 Sept 2009drilling progress report● Neutral

Weekly report: Spikey Beach-1 reached 2,100 m with no significant shows and is being abandoned; Egypt NS394-3 drilling at 672 m; Wakefield-1 (Beach 23.33%, free carried) at 1,467 m; NS377-3 development well to spud 19 September.

Value this in the calculator →Discuss in chat

14 Sept 2009drilling result▼ Bad

Beach confirms Spikey Beach-1 reached 2,100 m with no hydrocarbon shows and will be plugged and abandoned, repeating the partner's earlier release. Dry hole for the T/38P target.

Value this in the calculator →Discuss in chat

14 Sept 2009drilling result▼ BadMajor

Spikey Beach-1 in the Bass Basin reached 2,100 m with no hydrocarbon shows and is being plugged and abandoned. The well had targeted a mean 16 mmbbl. A dry hole for Beach (80%), Cue's Galveston (10%) and Exoil (10%).

Value this in the calculator →Discuss in chat

10 Sept 2009drilling progress report● Neutral

Cue repeats Beach's update that Spikey Beach-1 spudded 5 September and is at 816 m. Top of the primary target is expected at 1,461 m within the week; planned total depth 2,062 m. No result yet.

Value this in the calculator →Discuss in chat

9 Sept 2009drilling progress report● Neutral

Weekly report: Spikey Beach-1 (Beach earning 80%) spudded 5 September and is at 816 m running casing; Wakefield-1 to spud 10 September; Egypt's NS394-3 rig is jacking up with drilling due to start. Paralana-2 is at 2,253 m.

Value this in the calculator →Discuss in chat

3 Sept 2009drilling progress report● Neutral

Weekly report: Marino-1 plugged and abandoned; Basker-7 cased as a Latrobe oil producer; Spikey Beach-1 (Beach 80%) rig released with spud expected early next week; Egypt's NS394-3 (Beach 20%) due to spud; Wakefield-1 spud mid next week.

Value this in the calculator →Discuss in chat

3 Sept 2009drilling scheduled● Neutral

Cue Energy repeats Beach's update that Spikey Beach-1 in T/38P is expected to spud early next week, targeting mean 16 mmbbl and high 41 mmbbl. Beach 80%, Cue's Galveston 10%, Exoil 10%. Nothing new.

Value this in the calculator →Discuss in chat

2 Sept 2009drilling scheduled● Neutral

Adelaide Energy says Wakefield-1 in PEL 218 is due to spud next week, planned to 2,380 m, with Adelaide free carried. After the well, Beach's post-Permian interest will be 23.33%. Unrisked potential over 11 million barrels.

Value this in the calculator →Discuss in chat

31 Aug 2009drilling result▼ BadMajor

Drillsearch says Marino-1 in PEL 91 will be plugged and abandoned as a sub-commercial oil discovery: the Birkhead zone tested (about 3.5 barrels, 48.2 API) is too tight to flow commercially. Resolves the pending suspend-or-abandon decision. Beach holds 40%, Drillsearch 60%.

Value this in the calculator →Discuss in chat

28 Aug 2009drilling progress report● Neutral

Marino-1 found oil shows in the Birkhead Formation (up to 70% fluorescence over 12 m) at 1,842 m, after no shows in the Namur. Significance awaits logs and possible testing. Beach 40%.

Value this in the calculator →Discuss in chat

27 Aug 2009drilling result▼ Bad

Marino-1 penetrated the primary Namur Sandstone with no hydrocarbon shows, a miss on the main target, unlike Chiton-1 nearby. Drilling continues at 1,489 m to test the secondary Birkhead objective. Beach 40%.

Value this in the calculator →Discuss in chat

27 Aug 2009drilling scheduled● Neutral

Cue Energy repeats Beach's statement that Spikey Beach-1 in T/38P (Bass Basin) is expected to get its rig around 30 August. Targets mean 16 mmbbl, high 41 mmbbl. Participants: Beach 80%, Cue subsidiary 10%, Exoil 10%.

Value this in the calculator →Discuss in chat

26 Aug 2009drilling progress report● Neutral

Weekly report: Marino-1 at 1,003 m nearing the Namur target. Basker-7 cased and suspended; Ocean Patriot rig expected to drill Spikey Beach-1 (T/38P, Beach 80%, mean 16 mmbbl, high 41 mmbbl) around 30 August. Comet rig assigned to Egypt's NS394-3 (Beach 20%).

Value this in the calculator →Discuss in chat

26 Aug 2009drilling progress report● Neutral

Drillsearch update: Marino-1 at 1,003 m drilling in the Toolebuc Formation, with the primary Namur Sandstone expected within 24 hours. No result yet. Beach 40%.

Value this in the calculator →Discuss in chat

24 Aug 2009drilling spud● Neutral

Marino-1 in PEL 91 spudded 22 August, second well after the Chiton-1 oil discovery. At 672 m, running surface casing; target depth 1,948 m in about 12 days. Beach operates with 40%, Drillsearch 60%.

Value this in the calculator →Discuss in chat

21 Aug 2009drilling scheduled● Neutral

Drillsearch's amended notice says Marino-1 in PEL 91 will spud Saturday 22 August, correcting the earlier 8 August date. It targets mean 2.0 mmbbl, high 4.4 mmbbl, 31% chance of success. Beach operates with 40%.

Value this in the calculator →Discuss in chat

21 Aug 2009drilling scheduled● Neutral

Drillsearch says Marino-1 in PEL 91 is about to spud, planned TD 1,948 m over about 12 days. It targets mean 2.0 mmbbl, high 4.4 mmbbl, 31% chance of success. The release gives a spud date of 8 August, apparently an error for 22 August. Beach 40%.

Value this in the calculator →Discuss in chat

19 Aug 2009drilling progress report● Neutral

Weekly report: Chiton-1 cased and suspended as a future oil producer; Marino-1 (mean 2.0 mmbbl) to spud about 22 August. Burnside-1ST1 plugged and abandoned. Basker-7 cased and being completed as a Latrobe oil producer.

Value this in the calculator →Discuss in chat

19 Aug 2009drilling scheduled● Neutral

Drillsearch says Chiton-1 is cased and suspended as a future oil producer and the rig is moving to Marino-1, spudding about 22 August. Marino-1 targets mean 2.0 mmbbl, high 4.4 mmbbl. Beach 40%.

Value this in the calculator →Discuss in chat

17 Aug 2009drilling result▲ GoodMajor

Drillsearch reports Chiton-1 (PEL 91) is an oil discovery with a 5.5 m oil zone in the Namur Sandstone. Estimated recoverable oil is 0.04-0.39 mmbbl, P50 0.12, well below the 0.7 mmbbl pre-drill mean. Beach holds 40%.

Value this in the calculator →Discuss in chat

17 Aug 2009drilling result▲ GoodMajor

Beach confirms Chiton-1 in PEL 91 as an oil discovery: 5.5 m oil zone in the Namur Sandstone, recoverable oil 0.04-0.39 mmbbl with P50 0.12 mmbbl. TD 2,010 m; to be cased for production. Beach 40%. First oil in PEL 91.

Value this in the calculator →Discuss in chat

13 Aug 2009farm in farm out agreement● Neutral

Icon says Wakefield-1 in PEL 218 should spud about 6-7 September with Beach as operator, targeting up to 11 mmbbl across eight reservoirs. Drilling lifts Icon's Mesozoic interest from 10% to 33.3%. Icon's value claims are its own; follows Beach's July farm-in.

Value this in the calculator →Discuss in chat

13 Aug 2009drilling progress report● Neutral

Drillsearch update: Chiton-1 at 1,136 m in the Wallumbilla Formation, expected to reach the Namur Sandstone on Friday. No result yet; Beach 40%.

Value this in the calculator →Discuss in chat