Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

18 Nov 2014admin correction● Neutral

Corrected version of the AGM webcast notice: the recording will be available from 28 November rather than 2 December 2014. Administrative only.

Discuss in chat

14 Nov 2014material agreement termination▼ Bad

Petratherm says the $13m ERP grant and the $24.5m REDP grant for Paralana geothermal have been terminated, with no funds paid, after it could not raise the extra $5m equity. Beach (21% partner) has no further obligations beyond a closure report. Beach already wrote off its Paralana investment.

Discuss in chat

13 Nov 2014well test result● Neutral

Icon says Redland-1 stimulation in ATP 855 (Beach 46.9% operator) is done, and Geoffrey-1 stimulation began 12 November. Stimulated wells are awaiting stabilised flow rates; none reported yet from Hervey-1 or Etty-1.

Discuss in chat

13 Nov 2014regulatory community update● Neutral

3D Oil (80% operator) says the Flanagan 3D seismic survey is under way in T/49P, with Beach holding 20%. About 970 sq km, due to finish mid-December. Leads are said to hold 7.8 Tcf gas in place (best estimate, prospective). Follows the late-2014 seismic plan.

Discuss in chat

11 Nov 2014drilling result▲ Good

Bauer-15 in PEL 91 (Beach 40% operator, Drillsearch 60%) found 5.1m net Namur oil pay against 3.5m predicted, and was cased as a producer. It may lift the field's ultimate recovery; four more Bauer wells are drilling. Beach calls it an upside, with no reserve figure yet.

Value this in the calculator →Discuss in chat

6 Nov 2014drilling progress report● Neutral

Drillsearch's October report confirms Bauer-14 cased as a future producer and Pennington-3 plugged and abandoned for insufficient pay. Bauer-15 and -16 are drilling in PEL 91 (Beach 40% operator). Canunda-2 cased as a future producer. Pennington-3 resolves the earlier open drilling thread.

Value this in the calculator →Discuss in chat

5 Nov 2014drilling progress report● Neutral

October report: 13 wells completed at a 92% success rate. Bauer-14 oil development well (Beach 40% operator) was cased for tie-in in December; Pennington-3 was plugged and abandoned, and Canunda-2 gas well was cased as a future producer. Ten Santos-operated gas wells cased.

Value this in the calculator →Discuss in chat

29 Oct 2014well test result● Neutral

Icon says stimulation of Etty-1 in ATP 855 (Beach 46.9% operator) is complete and flow testing will follow in coming weeks. Equipment moved to Redland-1, where stimulation began 28 October. Still no flow rates from the Nappamerri Trough gas wells.

Discuss in chat

24 Oct 2014annual report● Neutral

Beach's 2014 Annual Report restates FY14 results already released, including sales revenue of $1,052m. It sets the AGM for 27 November 2014. No new information in the visible text.

Discuss in chat

14 Oct 2014investor presentation● Neutral

Citi conference presentation repeats known FY14 results, FY15 guidance and the international asset review. It states market cap of about A$1.7bn at 13 October 2014 (against ~A$2.2bn in August) and says the balance sheet could fund capex until end FY16.

Discuss in chat

13 Oct 2014well test result● Neutral

Icon reports the ATP 855 joint venture (Beach 46.9% operator) finished fracture stimulation of Hervey-1, with flow testing to follow over coming weeks. Stimulation of Etty-1 began 11 October. No flow rates yet.

Discuss in chat

1 Oct 2014drilling progress report▼ Bad

Drillsearch's September report: PEL 91 (Beach 40% operator) appraisal Stunsail-2 and gas exploration well Karrata-1 were plugged and abandoned. Pennington-3 is drilling. Mixed month for the Western Flank, with two dry holes after the Balgowan and Burners discoveries.

Value this in the calculator →Discuss in chat

1 Oct 2014drilling progress report▲ Good

September report: Egypt's El Salmiya-6 flowed 2,880 bopd and 9.7 MMscfd of gas, and ASA-1X ST3 flowed 2,130 bopd from one zone and 1,332 bopd from another (Beach 22%). Martlet-1 was cased. Stunsail-2 and Karrata-1 were plugged and abandoned.

Value this in the calculator →Discuss in chat

17 Sept 2014dividend declaration● Neutral

Beach sets the DRP issue price for the 2.0 cent final dividend at $1.482, after a 2.5% discount. Record date 5 September, payment 26 September. Administrative follow-up to the earlier dividend notice.

Discuss in chat

16 Sept 2014well test result● Neutral

Icon says the ATP 855 JV (Beach 46.9% operator) has started fracture stimulation of Hervey-1, five Upper Patchawarra zones. The four-well program, including Geoffrey-1, Redland-1 and Etty-1, is expected to take about six weeks. Starts the delayed NTNG flow testing; no results yet.

Discuss in chat

12 Sept 2014drilling result▲ Good

Senex reports an oil discovery at Martlet-1 in PEL 104 (Senex 60% operator, Beach 40%), with up to 6m net pay, to be cased and put on production next quarter. Its Squire-1 well, outside Beach's interest, was dry.

Value this in the calculator →Discuss in chat

12 Sept 2014drilling result▲ GoodMajor

Beach announces the first Namur Sandstone oil discovery in the PEL 104/111 joint venture (Beach 40%, Senex 60% operator): Martlet-1 found 6m net pay. It offsets the run of dry holes there; Beach also plans Eastern Flank wells in H1 2015.

Value this in the calculator →Discuss in chat

11 Sept 2014security holder rights change● Neutral

Beach's A$150m 3.95% convertible notes due 2017 had their conversion price adjusted from A$1.910 to A$1.88 from 3 September 2014, following the dividend. A mechanical adjustment.

Discuss in chat

4 Sept 2014drilling progress report▲ Good

Drillsearch's August report says Burners-1 in PEL 91 (Beach 40% operator) is the 15th discovery there, cased as a future producer. Stunsail-2 appraisal is next, and 18 wells are planned in PEL 91 this financial year.

Value this in the calculator →Discuss in chat

3 Sept 2014drilling progress report● Neutral

August report: Cullen-1 in the Bonaparte was cased and suspended at 3,325m after about 1,600m of gas-prospective shale, for later testing. Balgowan-1 was cased, and Burners-1 found oil, recovering 5.1 barrels in a test. Small result, not commercial yet.

Value this in the calculator →Discuss in chat

3 Sept 2014drilling result▼ Bad

Senex reports Warthog-1 in PEL 111 (Senex 60% operator, Beach 40%) found good sands but no oil or gas shows and was plugged and abandoned at 1,887m. Another dry hole in this joint venture after Tornado-1, Sabre-1 and Mustang-3.

Value this in the calculator →Discuss in chat

28 Aug 2014investor presentation● Neutral

Roadshow presentation repeats the FY14 results: $411m cash, $1.05bn revenue, FY15 production guidance of 8.6-9.4 MMboe, and the review of international assets. No new information.

Discuss in chat

27 Aug 2014resource reserve update● Neutral

Drillsearch, Beach's 60% partner in PEL 91, reports 2P reserves steady at 28.3 MMboe. Its Western Flank oil reserves rose to 7.8 MMboe, excluding the Balgowan-1 discovery. Mostly its own figures; it supports confidence in the PEL 91 oil fairway Beach operates.

Value this in the calculator →Discuss in chat

25 Aug 2014dividend declaration● Neutral

Beach details its 2.0 cent fully franked final dividend: record date 5 September, payment 26 September, dividend reinvestment plan (DRP) discount 2.5%. It corrects the last DRP election date to 8 September, not 5 September as in the full-year report.

Discuss in chat

25 Aug 2014investor presentation● NeutralMajor

Results presentation shows record production of 9.6 MMboe, sales revenue of $1.05bn, cash of $411m and an undrawn $300m facility. Beach is reviewing its international assets, with some possibly to be sold, after the Egyptian impairment. Inference: a possible strategy shift toward Australia.

Discuss in chat

25 Aug 2014resource reserve update● NeutralMajor

At 30 June 2014, Beach reports 2P reserves of 85.6 MMboe, down from 92.7, and 2C contingent resources of 466.5 MMboe, up from 448.9. Unconventional 2C is 362.4 MMboe, including a 55 MMboe net Nappamerri increase.

Value this in the calculator →Discuss in chat

25 Aug 2014annual report▲ GoodMajor

FY14 statutory profit was $101.8m, down 34% after $162.2m of non-cash writedowns, on revenue up 51% to $1.06bn. Final dividend is 2.0 cents, fully franked, paid 26 Sep 2014. Confirms the figures flagged on 22 August.

Discuss in chat

22 Aug 2014financial restatement▼ BadMajor

Beach will book non-cash writedowns of $162.2m for FY14: $148.6m on Egyptian exploration assets and $13.6m writing off Paralana geothermal. Statutory NPAT is expected at $101.8m against a record underlying $259.2m.

Discuss in chat

21 Aug 2014asset acquisition disposition▲ Good

3D Oil confirms Beach completed buying a 20% interest in T/49P, offshore Otway Basin, for A$3m. This finishes the previously announced deal; a 755 km2 3D seismic survey is planned late 2014.

Discuss in chat

21 Aug 2014well test result▲ Good

Strike reports Davenport-1 in PEL 94 (Beach 50% operator) completed preliminary testing of two Patchawarra coal seams, with good permeability and gas shows at surface. The well is shut in; pump testing of the Vm3 seam will follow. No flow rate given.

Discuss in chat