Stockle - the stock oracle

AXP Energy Limited

ASX:FPLASX:AXP
A$0.007Latest close held · delayed

Past year: ▼ 69%(0.40c – 1.80c AUD)

Market cap
—
Shares on issue
0
In-ground value
A$658m
Risked multiple
under review
Story beats
281 since 2006
Last event
2 Sept 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

3 July 2007drilling result● Neutral

Further analysis of the PEL 73 Gravestock #1 well shows an 8 m hydrocarbon show at 691-699 m, with a stated 50% chance of producible hydrocarbons. This revisits the earlier uneconomic result; Austin (16.666%) will review next steps over coming months.

Value this in the calculator →Discuss in chat

29 June 2007drilling scheduled● Neutral

SW Edwards site work is complete; the rig is due to move in 4 July with operations starting 10 July. Austin's Aus-Tex is carried through completion, then holds 25%. Stated potential reserve is 2.86 Bcf gas and 1.096m barrels of oil.

Value this in the calculator →Discuss in chat

21 June 2007drilling result▲ GoodMajor

Halliburton's final analysis identifies 55 feet of pay in zones above the original target at Gueymard #1, resolving the earlier ambiguity. Austin is running 5 inch casing to test them; reserves and phase two timing are still to come.

Value this in the calculator →Discuss in chat

19 June 2007drilling result● NeutralMajor

Gueymard #1 could not reach the targeted P sand and below, because of an obstruction and about 300 feet of fractured casing, so a sidetrack is not achievable. Logs suggest possible hydrocarbons in upper zones, but the data is ambiguous pending further analysis.

Value this in the calculator →Discuss in chat

14 June 2007drilling progress report● Neutral

Austin says it cleared the sand obstruction in Gueymard #1 and expects production log results within 48 hours. This follows the earlier logging tool problem; no results yet.

Value this in the calculator →Discuss in chat

12 June 2007drilling progress report● Neutral

Austin re-entered the old Shell Gueymard #1 well and drilled to 9,420 feet, but the logging tool stuck at 1,960 feet. The sand is being washed to check for casing problems. Austin holds 50% before payout, 40% after.

Value this in the calculator →Discuss in chat

10 Apr 2007drilling scheduled▲ Good

Site works began for re-entering the Gueymard well (formerly St Gabriel 2), with re-entry expected within 30 days. AUS-TEX holds 40%, with Rio Bravo, Verus and private Australian interests 20% each. Resource potential is up to 9.0 Bcf gas and 370,000 barrels of oil.

Value this in the calculator →Discuss in chat

19 Feb 2007drilling progress report● Neutral

St Gabriel 1 hit a gas kick at 9,472 ft and intermediate casing was set, with drilling continuing toward 10,800 ft. Drilling also began at PEL 73 (Yorketown), where Austin holds a one-sixth interest.

Value this in the calculator →Discuss in chat

24 Jan 2007farm in farm out agreement▲ Good

Partner Verus proceeded with farm-ins to St Gabriel 2 and SW Edwards after due diligence. St Gabriel 2 is expected to spud in late February 2007 and SW Edwards in late April. It confirms the sell-down funding Austin announced earlier.

Value this in the calculator →Discuss in chat

3 Jan 2007farm in farm out agreement▲ GoodMajor

Austin arranged A$11.5 million of non-dilutive US-dollar funding by selling down interests in prospects, giving carried drilling at St Gabriel II, Jeter Branch and SW Edwards. It sold 20% of St Gabriel I, buys 5% more, and gains a 30% Jeter Branch interest.

Value this in the calculator →Discuss in chat

3 Jan 2007farm in farm out agreement● Neutral

Partner Verus announced its farm-in to St Gabriel I via a Master Participation Agreement with Austin's subsidiary AUS-TEX. It earns 12.5% by paying 25% of drilling costs, reverting to 10% after payout. This confirms part of Austin's January sell-down.

Value this in the calculator →Discuss in chat

11 Sept 2006drilling progress report▲ Good

Ezell #4-H reached 4,174 ft vertical and began drilling horizontally, with 1,565 ft drilled by 10 September. It encountered gas and flared it off, an early encouraging sign.

Value this in the calculator →Discuss in chat

31 Aug 2006drilling spud▲ GoodMajor

Drilling has started on the Ezell #4-H sidetrack at Polecat Creek, Texas, the company's first well since listing. It re-enters an abandoned well, targeting about 4,000 ft vertical and 3,000 ft horizontal in the Georgetown Limestone; four wells are planned for 2006-07.

Value this in the calculator →Discuss in chat

20 July 2006drilling progress report● Neutral

Work has begun on Austin's first well at the Polecat Creek Prospect in Limestone County, Texas, with a rig preparing the existing borehole. Estimated potential is 180,000 barrels of oil and 180mmcf of gas per well; the drilling rig is due within 28 days.

Value this in the calculator →Discuss in chat