Each one in plain English, with the numbers worked through for a shareholder.
29 Nov 2011drilling progress report● Neutral
Krueger #1 found hydrocarbon shows in the Austin Chalk (8,403-8,829 feet) and is now entering the Eagle Ford. Drilling through the soft, fractured chalk was slower than expected because of circulation problems, which were remedied. Completion of drilling now expected the following week.
Krueger #1 has reported gas shows in the shallow Taylor Sand (6,594-6,615 feet), described as consistent with nearby productive Taylor gas wells. This is not the main oil target; logs and core analysis are still to come. Target depth now expected by the following weekend.
Krueger #1 is progressing well: surface casing cemented at 4,323 feet and drilling resumed toward the 9,200-foot target, expected to be reached the following week. No hydrocarbon results yet.
Notice that broker Hartleys has released a research update on the company, available on its website. The report content is not in the announcement, so its conclusions cannot be confirmed.
Company appoints Casimir Capital to help list its shares on the OTCQX market in New York within two weeks, and hires a US PR firm. A corporate name change to Arapahoe Energy is flagged, with details at the 29 November AGM.
Krueger #1, the first Eagle Ford well on the ~5,000-acre project (93.5% interest), spudded 8 November, ending the delays since the original 19 September date. Planned depth is 9,200 feet, with drilling expected to take 12-15 days. Weekly updates promised.
Kentucky JV oil production has stabilised above 30 bopd, up from about 1 bopd average in 2010 and from about 20 bopd in the September quarter. Company expects 40 bopd by December, as previously targeted.
Rig on site and Krueger #1, the first Eagle Ford well, set to spud this week after a weeks-long wait for a rig. Coastal Rig #7 will drill it; Eagle Ford expected at about 8,700 feet. Three verticals first, then a horizontal.
September quarter report: US operations still cash flow positive. Kentucky stable at about 20 bopd, targeting 40 by December. Eagle Ford verticals due October with horizontals early 2012; Niobrara first horizontal Q1 2012. Armstrong wells and North Carrizo continue producing.
Re-release of the FY2011 annual report already summarised on 30 September. Chairman repeats about A$10m raised, 93.5% Texas and 85% Colorado interests, a 50/50 Kentucky JV with A$1.75m investment, and Kentucky at about 20 bopd. No new information in the visible text.
Notice that the 146.5m listed 10c options expire 19 November 2011. The share price was 2.8c, below the 10c exercise price, so the options would lapse unless exercised. ASX waived individual notices.
Cooper Basin PEL 105 has dried out after flooding and rig selection is starting. Pirie-1 is now expected in Q1 2012, with Adelaide funding the first A$1.75m. This ends the flood suspension; the company cites a chance of over one million barrels.
The first Eagle Ford well, Krueger #1, is now expected to spud before end of October after a minor rig delay; the original 19 September date slipped. It will be a vertical well to about 8,700 feet, one of three initial verticals.
FY2011 annual report. The chairman says about A$10m was raised and the Newtak dispute is resolved via a 50/50 Kentucky JV, with Austin investing A$1.75m and clearing a A$4.5m liability. Kentucky produces about 20 bopd; US operations cash flow positive.
Says Eagle Ford drilling is imminent. Text is largely unreadable, so rig, timing and depth details cannot be confirmed; the 19 September spud date was set earlier.
Independent expert report on the Niobrara (Pathfinder) acreage, said to confirm prospectivity. Text is mostly unreadable; the later quarterly cites 200,000–500,000 barrels per horizontal well and spacing for about 70 wells.
Final director's interest notice for James Edwards on ceasing as director: 1,000,000 shares, 1,000,000 listed options and 5,000,000 further options. Confirms his departure; administrative.
Institutional roadshow presentation on the US shale assets, including Pathfinder Niobrara and Eagle Ford. Text is largely garbled; it appears to repeat previously announced projects with no new figures that can be confirmed.
Notice of a director's resignation. Text is mostly unreadable. A Form 3Z filed 14 September for James Edwards suggests he is the director who left (inference).
Initial director's interest notice: Christopher Hodge, appointed 6 September 2011, holds 900,000 ordinary shares through his superannuation fund. Administrative.
24 Aug 2011asset acquisition disposition▲ GoodMajor
Settlement completed on the Niobrara (about 11,000 acres, 65% NRI) and Eagle Ford (about 5,000 acres, 70% NRI) shale acreage, described as fully funded. The first Eagle Ford well is set to spud 19 September 2011. Guy Goudy is named as the new CEO.
3 Aug 2011director officer appointment● NeutralMajor
Announces a new director and a change of Chairman and CEO. Text is mostly unreadable; a later release shows Guy Goudy as CEO and Mark Hart as Chairman. Details of the new director cannot be confirmed.
26 July 2011asset acquisition disposition▲ GoodMajor
Sells its option to farm into up to 4% of Seychelles licences to WHL Energy for A$420,000, versus A$340,000 paid in 2010. Closes the Seychelles thread and refocuses funds on the new Eagle Ford and Niobrara shale projects.
Full NI 51-101 resource evaluation of the Birch Prospect, Burleson County, dated 6 July 2011, by independent evaluators for Aus-Tex. Excerpt shows only contents pages, so no volumes appear here. Duplicate of the same-day report.
Independent expert report on the Birch Eagle Ford acreage; text is mostly garbled. Later releases cite 179,000–810,000 barrels per well and potential for 32 development wells. This is the reserves report due in early July.
27 June 2011asset acquisition disposition▲ GoodMajor
Agrees terms with Newmont, Cimarex and Prize Energy to buy 10,486 acres of Niobrara mineral rights (Pathfinder, Fremont County, Colorado) for about A$2m, with at least 85% WI and 65% NRI. Title checks and final contract still pending; Birch reserves report due early July.
Eagle Ford presentation repeating known facts. Birch is described as 1,566 acres secured with an option on all 5,000 by July 2011; three horizontal wells, each with potential 200,000 bbl EUR, planned from Q4 2011. Lists Pellicano as chairman, although he resigned in November 2010.