13 Dec 2016drilling result▲ GoodMajor
Final 32 of the 50 holes at Bermingham returned 7.16 m at 4,375 g/t and 3.98 m at 6,477 g/t silver in the Bear Vein, and first metallurgical work indicated 94-96% silver and lead recoveries producing a lead concentrate over 60% lead and 30,000 g/t silver, using the existing Keno Hill district mill flowsheet.