The story before 10 Dec 2007
The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.
shares on issue market cap (log scale)
2007138m shares · A$32.7m market cap
- 26 Nov
Alpine and Kairiki agreed to buy Stratic's 40% of South Craiova (Romania) and 100% of Chorbane (Tunisia), each for US$1m cash split 50/50. Alpine would get 20% of South Craiova. Both deals are conditional; the first projects from the Alpine tie-up.
asset acquisition disposition
138m shA$32.7m - 22 Nov
Enterprise Energy confirmed a confidential farm-in to PEL-182 with AOC and AuDAX. It is conditional on Eagle Bay's pre-emptive rights (deadline 28 November) and ministerial approval. No terms are given, so the effect on AuDAX's 49.9% is unclear.
farm in farm out agreement
138m shA$32.7m - 9 Nov
AuDAX agreed to buy Alpine Oil and Gas for 16m shares, adding a free-carried Romanian study interest and a Tunisian exploration partnership. Dr Wolfgang Zimmer is proposed as managing director, Gary Roper chairman, with Leith Beal leaving. A shift beyond its Cooper Basin and WA base.
business combination
138m shA$32.7m - 28 Aug
View Resources announced a farm-in to AuDAX's Karra tenements at Bronzewing South, Western Australia. View can earn 51% by spending $1.5m over four years, and a further 19% (70% total) by spending another $1m. This adds to the existing View relationship at West Yandal.
farm in farm out agreement
138m shA$16.3m - 18 July
Vanessa-1 ST-1 was cased with 7-inch casing and suspended as a future gas producer; the rig was released 17 July. Sidetrack logs show extra Patchawarra gas sands, to be tested later. The operator says the pre-drill 15 Bcf objective appears achieved and may be exceeded.
drilling result
121m shA$8.6m - 17 July
AuDAX placed 17.35m shares at 7 cents to sophisticated investors, raising about $1.2m with no fees. Funds cover its share of the extra Vanessa completion costs and working capital, the same 7c price as the February placement.
capital raising announcement
121m shA$8.6m - 26 June
Vanessa-1 is a gas discovery. Drill stem tests flowed an estimated 4.4 MMscfd from the Epsilon and 2.8 MMscfd from the Toolachee; a third test failed, suspected tool malfunction. Casing will be run and the well suspended as a possible gas producer. AuDAX holds 49.9%.
drilling result
121m shA$7.7m - 14 May
Vanessa-1, the gas prospect with a 3,250m planned depth, spudded 12 May 2007 and was at 770m in surface hole. It follows the Sarahlyn-1 dry hole.
drilling spud
121m shA$8.7m - 7 May
Sarahlyn-1 is a dry hole: logs show no economic hydrocarbons, with zones water wet or too tight. It was plugged and abandoned. The rig moves to Vanessa-1 around 12 May, and the JV approved a $500,000 ISIS Petroleum review.
drilling result
121m shA$8.7m - 16 Apr
Sarahlyn-1 spudded 16 April 2007, the first PEL-182 well since Emily-1 in January 2006. It is drilling surface hole at 80m toward a planned 2,730m depth.
drilling spud
121m shA$12.5m - 9 Feb
AuDAX placed 15.5 million shares at 7 cents to raise about $1.085m, to fund its share of the Sarahlyn and Vanessa wells and working capital. Dr Peter Barber joins as technical non-executive director, replacing Ian Chalmers. The price is well below January 2006's 16 cents.
capital raising announcement
105m shA$7.9m
2006105m shares · A$7.8m market cap
- 27 Dec
The White Sands farm-in and drilling deed is terminated and White Sands has appointed an administrator. The operator signed a letter of intent with Century Drilling for two PEL-182 wells plus an option for two more, with Rig 3 available from 25 February 2007. This ends the White Sands rig plan.
material agreement termination
105m shA$7.8m - 11 Apr
Falcon Minerals can earn 70% of the nickel and associated base metal rights at the Marymia project by spending $1.75m within 5 years, with at least $150,000 in the first 12 months. AuDAX keeps all gold rights.
farm in farm out agreement
105m shA$14.0m - 23 Jan
After a failed first test, Emily-1's second test over 1,901-1,907.5m recovered 33.6 barrels of fluid, only 1.3 barrels of it light oil. The JV will case and suspend the well and perforate the upper sand later with a smaller rig.
well test result
105m shA$15.5m - 16 Jan
Emily-1 recorded a fair oil show at 1,901.5m near the base Birkhead/top Hutton, in the primary objective, and the zone warrants testing. Rain closed roads and blocked test equipment, so testing is deferred to wireline logs and a possible later test. Well is at 2,027m.
drilling result
- 11 Jan
AuDAX placed 6.9 million shares at 16 cents with free attaching options exercisable at 20 cents by 31 December 2008, raising $1,104,000 from sophisticated investors. Funds go to further Cooper Basin drilling and seismic.
capital raising announcement
- 9 Jan
Emily-1 spudded on 7 January 2006 and was drilling surface hole (448m at report time) towards a planned 2,364m. This starts the PEL-182 drilling programme in which AuDAX holds 39.9%.
drilling spud
- 5 Jan
Operator Eagle Bay announced Emily-1, the first well in the new PEL-182 Cooper Basin permit, with AuDAX holding 39.9%. Pre-drill estimate is 10.5 million barrels of recoverable oil (P50), only if oil is present. Target depth is 2,364m.
drilling scheduled